MGMT3120 - Construction Quality Management

Group Project 2: Developing a Construction Quality Control (CQC) Plan

Resources Needed: Project Drawings & Specifications

Construction Quality Control (CQC) Plan Structure CQC Plan Template

Sample CQC Plan

Inspection and Testing Plan (ITP) Template ITP Example

Submittal Log Template

Submittal Log Sample

Instructor: Professor Bill Nichols

Project Mark: 20% of the overall course grade

Submission Due: Week 14 (To be submitted via Brightspace. Refer to specific requirements below.)

SUBMISSION REQUIREMENTS

Submission Deadline:

Week 14 (11:59pm, Sunday, April 13)

Upload your files in the Group Projects/Project 2 folder.

Late Submission Policy: Any late work submitted after the deadline will incur a penalty of 10% reduction per day for up to 5 academic days for a maximum of 50% reduction, after which no work will be accepted.

Marks are allocated on the basis of the soundness of your response, and the quality of documentation/reporting. Where assumptions are made, you must provide a clear description of the same.

General Instructions:

1.    This project is to be completed in groups of no more than 4 students. The inclusion of any additional student to a team beyond the 4 persons will incur an automatic penalty of 25% for all team members. Each member of the team is required to contribute equally. Marks will be allocated based upon the share of students’ overall participation. Teams are strictly prohibited from copying from one another, although collaboration is encouraged. Any evidence of plagiarized work will be assigned a mark of 0 for all members of the team.

2.    Students are responsible for placing themselves into groups.

3.    Assume the role of the project manager for the general contracting firm who has recently been awarded the project under the design/bid/build (CCDC 2 & CCA 1) project delivery method.

4.    As part of your contractual requirements, you are to develop a CQC Plan, Master Construction Plan with Submittal Milestones, ITP and Submittal Log documentation for the assigned project. This document is to be submitted to the Owner and/or the Consultant as per the contract.

Assignment: Developing a Construction Quality Control (CQC) Plan

The Project: York Region Paramedic Response Station #32

Project Duration: April 1, 2025 - August 31, 2026

Assignment Requirements:

Part A - Development of Construction Quality Control Plan

1.    Prepare a minimum of 25 Definable Features of Work (DFOW). You will have to break down the project into its various activities to establish Definable Features of Work (DFOW). This may require that you develop a work breakdown structure (WBS) to develop the work activities for all major divisions. You can use the subcontracting work packages developed in Group Project 1 for the definable features of work for your project.

2.    Prepare relevant construction quality control procedures applicable to your project. Use the CQC Plan structure provided as your guide to develop these procedures.

3.    Prepare various Construction Quality Control (CQC) forms to accompany the respective QC procedures. As a minimum, you will be required to prepare the QC forms as indicated in the CQC Plan structure provided. Use the typical forms included in the sample CQC Plan and customize them to your project. Forms and checklists are a critical component of any construction quality control plan. In the plan, you will include sample forms with the project-relevant information that will be used by QC personnel during the execution of the project. You are encouraged to use your creativity and imagination.

4.    Prepare a complete Construction Quality Control (CQC) Plan using the exact structure as presented below.

1. Project Description

1.1 Site Description

1.2  Mission Statement of Quality

1.3  Definable Features of Work

2. Project Organization

2.1  Project Organization Structure

2.2 Quality Control Personnel Qualifications

2.3  Roles and Responsibilities of Quality Control Personnel

3.    Construction Quality Control Procedures

3.1  Procedure for Quality Control Meetings & tracking forms

3.2  Procedures for project document control & tracking forms

3.3  Procedures for inspections and testing & tracking forms

3.4  Procedures for receiving material inspections & tracking forms

3.5  Procedures for equipment commissioning & forms

3.6  Procedure for stop work order & forms

3.7  Procedures for project completion and handover & tracking forms

4. Construction QC Documentation

4.1 Construction Production Reporting Procedures

4.2 Construction Quality Control Daily Report Forms

4.3 Construction Quality Control Weekly Report Forms

5. Construction QC Submittals

5.1 Submittals review procedure for shop drawings, material data, samples and product data

5.2  List the submittals

5.3 Submittals Tracking Form.

6.    Management of Nonconformance

6.1  Nonconformance reporting procedures & tracking forms

6.2  Deficiency reporting procedures & tracking forms

6.3  Reworks reporting procedures & tracking forms

6.4  Punch list procedures and tracking forms

7. Corrective Actions

7.1  Procedure for Corrective Actions

7.2 Corrective Action Tracking Form.

8. Appendices

Part B - Appendix A - Master Construction Schedule with Submittals Milestones

1.    Using the master construction schedule developed in Group Project 1, identify a minimum of 10 most critical submittals (shop drawings, samples, as-builts, etc.) as project milestones. Show the submittals deadlines as milestones on your construction schedule.

Part C - Inspection and Testing Plan (ITP)

1.    Prepare an Inspection and Testing Plan (ITP) using the template provided. An example is provided to assist you in completing this documentation. You must include a minimum of 10 inspection and testing requirements for the specified definable features of work for your project. The Specifications document identifies the quality requirements and standard tests required for products and works. The timing of the identified inspections/tests has to correspond to the master construction schedule developed above.

Part D - Submittal Log

1.    Prepare a Submittal Log for the project using the template provided. An example is provided to assist you in completing this documentation. The Submittal Log must include a minimum of 10 submittal items. The submittals identified in the log must be pertinent to your project’s specific processes.

Each part is to be assembled as a separate chapter.

Grading Rubric:

You team work will be graded using the rubric provided below. The marks will be awarded on the basis of accuracy, thoroughness, clarity, and overall quality of the completed assignment having regard to report organization (format, page numbering, grammar, relevance to assigned project), writeup of construction quality control procedures, and preparation of construction quality control documentation (forms & checklists) applicable to the project. Although group collaboration is encouraged, any evidence of cloned or copied work between the groups or copyright violations will earn a mark of zero and an appropriate action  for academic dishonesty will be executed.

Item

Maximum

Mark

Part A - Construction Quality Control Plan (Procedures, forms and checklists)

65

Part B - Master Construction Schedule with Submittals Milestones

10

Part C - Completed ITP

15

Part D - Completed Submittal Log

10

Total

100



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图