代做ENG1012 Engineering Design帮做R语言

ENG1012 | Engineering Design

2025 Semester 1 | Tender Submission: Project Brief

1 DELIVERY FRAMEWORK

1.1 CONTEXT

Water is more than just a resource we use; it's a critical resource that we are all responsible for. As humans, we use water and create wastewater, but we also play a role in the water scarcity that's exacerbated by climate change. Droughts and floods are not merely just environmental events; they are challenges that require proactive management rather than solely relying on reactive responses.

From sourcing the water and ensuring that it is safe to use, to collecting the wastewater and treating it to create products safe for reuse and protecting our environment; it is a collective effort of many people that make this all possible. Engineers in the water industry are one key component of this wider group, and their role is crucial in enabling this water cycle.

This activity highlights the role engineers play in managing the ever-changing nature of Earth’s climate and its impact on the water cycle. Particularly, this task focusses on multi-disciplinary engineering teams in ensuring sustainable water management, providing students with insight into engineering careers that is dedicated to serving the client and ultimately the community, both presently and for years to come.

In doing so, South East Water (SEW) and CMP Consulting Group (CMP) aim to provide an industry-inspired project to students simulating certain aspects of what professional water engineers experience on a daily basis.

The fundamental problem to be solved is that Lang Lang Water Recycling Plant (WRP) is reaching its capacity due to local population growth and increasing climate-change demands. Without a solution, the flow entering the plant will exceed the amount of water discharged to the community. The challenge for students is to sustainably present a solution for this problem and ensure a long-lasting design that accommodates for future growth.

This project covers key engineering aspects such as technical proficiency, critical thinking and teamwork skills. In doing so, students will gain insight into the responsibilities, innovation, and problem-solving skills required to make a real difference in society.

This document, the Project Brief, aims to supply students with all the key knowledge and understanding required to make a start on this project. Furthermore, the document seeks to introduce students to key concepts related to reading, understanding, and working off a project brief in a similar manner to what is done in the professional industry, thereby preparing them for real-world scenarios.

For information on how engineering projects are approached in the professional workplace, please refer to the “Professional Engineering Guide”. It is strongly advised that students understand that document prior to the delivery of this project.

2 BACKGROUND INFORMATION

2.1 CLIENT BACKGROUND (SOUTH EAST WATER)

South East Water is one of Melbourne’s state-owned metropolitan water retailers. They provide water, sewage, trade waste and recycled water services for residents and businesses in Melbourne’s southeast, located in the state of Victoria, Australia (Figure 2-1).

More than 1.75 million people including more than 743,000 residential water customers are serviced by South East Water, as well as more than 55,000 non-residential water customers.

In a region spanning 3,640 square kilometres, last year South East Water delivered 135 billion litres of drinking water, 5.5 billion litres of recycled water and collected 125 billion litres of sewage. They are responsible for $4 billion of assets and manage more than 25,250 kilometres of pipeline to deliver our services.

South East Water is driven by its vision to provide healthy water for life, and is committed to providing customers with safe, affordable and sustainable integrated water solutions that are both resilient and adaptable to change.

For further information regarding South East Water please visit

www.southeastwater.com.au.

Figure 2-1: South East Water Network.

3 LOCAL SEWERAGE SYSTEM BACKGROUND

Lang Lang (LL), Koo Wee Rup (KWR) and Poowong, Loch and Nyora (PLN), have dedicated sewerage assets for the conveyance and treatment of wastewater. South East Water is responsible for water and sewerage services located in LL and KWR, with South Gippsland Water (SGW) responsible for PLN.

Figure 3-1: Site locality plan.

Figure 3-2: Sewerage System Schematic Diagram

3.1 LANG LANG WATER RECYCLING PLANT BACKGROUND

An aerial image of the Lang Lang Water Recycling Plant can be seen in Figure 2-4. This image shows the sewage treatment plant (STP), comprising of the inlet works and activated sludge plant, and the recycled water treatment plant (RWTP), consisting of disinfection processes. The lagoons on the right-hand side are for disinfection for Class C water, and the lagoon on the left-hand side is for storage of Class C recycled water during periods of low usage. Also shown are the onsite tree lots that are irrigated with Class C recycled water.

Figure 3-3: Lang Lang WRP Aerial Image.

3.2 UNIT OPERATIONS

Figure 3-4: Lang Lang WRP Activated Sludge Plant process flow diagram.

Figure 3-5: Lang Lang WRP Recycled Water Treatment Plant process flow diagram.



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图