代做AMME5902 Computer Aided Manufacturing Final Project-Part A代做Java程序

AMME5902 Computer Aided Manufacturing

Final Project-Part A

This part of the project consists of setting the manufacturing of the housing that will contain the  Arduino Uno and the ultrasonic sensor (HC- SR04) that are used in the part B of the project. The following figure illustrates the design of the housing.

Figure 1: a) Case of the Arduino and Ultrasonic Sensor. B) housing

The CAD model of the housing is available in CANVAS.

The chief aim of the project is to carry out the proposed tasks and arrive at comprehensive answers to the questions noted below. The tasks and the responses to the questions must be presented in a report. The report must include an introduction, contents page, all graphics, Excel spreadsheets, discussion, references and conclusions deemed necessary to convince management that you have a good understanding of the problem (or opportunity!) at hand (presentation: 2 marks)

The following tasks must be carried out:

1. Analise the machining of the housing by using at least 2 different machining patterns (zig, spiral etc). Compare both machining patterns in terms of total toolpath length and total toolpath time. the machining parameters must be specified and justified. These parameters include tool dimensions, feed rates, and spindle speeds. (4 marks)

2. Using Process Engineering methods, analyse an area of machining of the housing (3 marks)

3. Using a combination of CAMWorks and UPG develop a Post Processor for the Mori Seiki NV4000 (3 marks)

The following questions must be answered.

1.   Which one of the three CNC machines noted overleaf would you recommend using if your company needed 1200 housings  manufactured at the lowest possible price? (2 marks)

2.   Which one of the three CNC machines noted overleaf would you recommend using if your company needed 1200 housings manufactured in the shortest possible time frame? (2 marks)

3.   Production is scheduled to start on Monday the 3rd of November 2025. What is the first week day (Monday to Friday) that the 1200 housings will be ready? (consider any public holidays) You may work Saturdays but at a 50% overtime penalty. You may not work on Sundays. (2 marks)

4. If all your machinery is purchased new, what is your machinery worth at the end of the project? (2 marks)

5.   Which method (i.e. cheapest or quickest) would you prefer to use in your factory and why? (Please discuss this point in great detail). (3 marks)

6.   What would be the sale cost of one housing when you need to include a 140% profit ? (2 marks)

Assumptions:

•    The stock pieces are made from Stainless Steel and are sized as per the maximum dimensions of the housing.

•    All machine cuts are done in one pass.

•    Plunge cuts are made at 2/3 of the feed rates that traversing cuts are made.

•    Rapid Traverse (G00) moves the tool at 6000mm/min for the Mori Seki, 2000mm/min for the Cincinatti Milacron and 1100mm/min for the TMCMill.

Submission

The submission consists of the following 3 files.

1) The Solidworks/CAMWorks file of the housing that correspond to task 1 (with any of the machining patterns used in task 1) .

2) a video of the CAMWorks simulation of task 1 (with any of the machining patterns used in the comparison) with a maximum duration of 2 minutes.

3) A written report that describe all the tasks and answers to the questions. Your report should be a good, clear presentation on A4 pages and PDF format. All sketches are to be included. The page limit for the report is 25 pages (without including references and appendices).

You must upload the two files of the submission combined as a .zip file into CANVAS. The name of the file should be as per your group number.

THIS ASSIGNMENT SHOULD TAKE EACH AVERAGE GROUP MEMBER APPROXIMATELY 15-20 HOURS TO COMPLETE

Parameter

Value

Comment

Time

Cost (ex GST)

Machine A

Cincinatti Milacron

-$85,000.00

Min Motor Capacity

1.5 kW

In X,Y & Z

Max Spindle Speed

3,5000 RPM

Max Feed Rate (SS304)

390 mm/min

In X,Y & Z

Machine Charge Out

-$165.00/hr

Operator Charge Out

-$165.00/hr

Auto Pallet Changer

3.0 mins

Machine B

TMC Mill

-$50,000.00

Min Motor Capacity

0.85 kW

In X,Y & Z

Max Spindle Speed

4,500 RPM

Max Feed Rate (SS304)

75 mm/min

In X,Y & Z

Machine Charge Out

-$98.00/hr

Operator Charge Out

-$113.00/hr

Manual Pallet Changer

40 mins

Machine C

Mori Seiki

-$345,000.00

Min Motor Capacity

1.6 kW x 2

In X and Y

Min Motor Capacity

3.0 kW x 1

In Z

Max Spindle Speed

12,000 RPM

Max Feed Rate (SS304)

700 mm/min

In X,Y & Z

Machine Charge Out

-$195.00/hr

Operator Charge Out

-$190.00/hr

Auto Pallet Changer

1.95 min

Hardware

Stainless Steel (Grade 304)

-$7.00/kg

ADMINISTRATION

Infrastructure costs

37.5 hrs / week

Rent+Plant Maint. etc.

37.5hrs / week

-$3,605.00/week

Administration costs

37.5 hrs / week

Labour

37.5hrs / week

-$2,266.00/week

Overtime

Labour

-50%/hr (up to 2hrs)

Overtime

Labour

-75%/hr (2-4hrs)

Depreciation

All machines

Simple

-30%/year

Federal Incentive

Start up grant

(once only)

+$200,85.00

Utilities

Elect, Water

-$386.00 / week



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图