代做Supply Chain Network Design代做Statistics统计

Supply Chain Network Design

Pre-class assignment:

Read the Designing the Production Network at CoolWipes case study at the end of Ch 4 in Chopra (2026) textbook. Prepare answers to the questions below to be submitted (as a hard copy) prior to the start of class.

The spreadsheet provided below contains an optimization model that can be used to answer the study questions at the end of the case study. Please review the spreadsheet, including the Solver model, and make sure you understand where the input data comes from and how the optimization model is set up. Then answer the following questions in writing and submit a hard copy at the start of class on Tuesday, Sept 23:

1. The cells highlighted in blue are the decision variables for the problem. Explain in words (clearly and fully) what decisions the following cells represent:

B23-G26

H23-H26

B31-G34

H31-H34

2. The objective function is the total cost, as given in cell B37. Please answer the following questions about that calculation:

Notice that the calculation of the total does not include the variable costs, as given in cells C4-C7 and F4 F7. Explain why it is not necessary to include those costs when building the optimization model.

Explain why it might be useful to include the variable costs, even though it is not necessary in order to find the optimal solution.

3. The input data and optimization model in Solver are set up to answer the first part of Question 3 at the end of the case study (but not the questions about changing the transportation costs). Run the solver model to obtain the optimal solution for the problem described in the first part of Question 3.

Describe the optimal solution in words. In other words, if you worked for Matt O'Grady, the VP of Supply Chain, how would you describe the optimal solution to him?

Supply chains and distribution networks are often represented graphically using a network, with a set of nodes (circles, ovals or rectangle) representing facilities or markets, and arcs (arrows) that connect the nodes and indicate product flow. See, for example, Figure 4-11 in the Chopra (2026) textbook. Draw one or more network graph(s) to show the optimal solution found in part a of this question. Make sure to add sufficient detail (e.g., the quantity and type of goods being produced and shipped). Also make sure that your graph(s) are well-formatted and easy to read. You may use whatever tool you prefer to create this graphic; graphs drawn by hand are also acceptable as long as they are readable.

4. The optimization model in Solver can also be used to answer Questions 1 and 2 at the end of the case study. However, to answer these questions, changes need to be made to the model and/or data. For example, for Questions 1 and 2, we need to assume that the existing Chicago plant continues to operate, while in Question 3 we assumed the Chicago plant does not yet exist, but could be built. Therefore, to answer Questions 1 and 2, we need to change the fixed costs and capacity for the Chicago plant to reflect the current costs and capacity, not the values for a new plant. In other words, we would need to change cell B4 to 5,000 and cell D4 to 5,000. In addition, starting from the model for Question 3:

Explain what constraints you would need to add to the Solver model to answer Question 1. Describe the constraints in words and write them as you would in Solver, referring to the appropriate cells.

Explain what constraints you would need to add to the Solver model to answer the first part of Question 2 (ignore the second part of Question 2, about changing the transportation costs). Describe the constraints in words and also write them as you would in Solver, referring to the appropriate cells.

For parts a and b, you are not required to implement these changes in Excel. However, you might choose to do so, and then run the optimization model, to make sure your model works as intended.

In-class assignment

During class, we will conduct additional analysis related to the case study, including considering the impact of changes in transportation costs and economies of scale when constructing new plants. Please come to class with your laptop and the Cool Wipes spreadsheet and be prepared to conduct additional analysis to make additional recommendations.



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图