代做218.320 Civil & Services Measurement Semester 2, 2025 PORTFOLIO TWO帮做R语言

218.320

Civil & Services Measurement

Semester 2, 2025

PORTFOLIO TWO

(A) GENERAL INSTRUCTIONS:

1.   This is a group assignment. Your group should contain a maximum of 4 students. Should you choose, you do have the option to work individually. If you work individually, it should be presented to the same quality required expected from a group.

2.   This portfolio contains TWO questions.

3.   Total marks for PORTFOLIO TWO: 100 marks

4.  Total course weightage and contribution of the assessment component = 40% and covers learning outcomes 1 and 2

5.   Submission date (Stream deadline): Friday, 17th  October 2025, no later than 11:50 pm

6.   NO HARD COPY SUBMISSION IS REQUIRED

7.   Online submission on Stream: COMPULSORY.

8.   Late assignments will be penalised as per the course guide and the school’s policy.

9.  You must include your names and IDs, the course number, the course title, and the names of the course teaching team on the cover page.

10. You are only allowed to submit a PDF on Stream.

11. Please read and consider all documents in the assessment folder.

12. Include all stream communications on clarifications about the project / assessment that was used for preparing your assessment in the query sheets. All clarification communications regarding the assessment and project will stop on 5th  October 2025.

13. Complete your group selection on the stream by 14th September. Students who are not in groups by the given time will be randomly allocated to groups.

14. Covered learning outcomes

a.   Use industry-standard software to measure building quantities according to the Standard Method of Measurement.

b.   Prepare Bills of Quantities using industry-standard software

(A)      QUESTION 1

Measure and prepare bills of quantities only for the following sections of Project A (Refer to the attached “Portfolio 2 - 218320 - set 1”) according to CESMM4 revised.

1.  Excavation

a.  Topsoil (100mm thick from the existing ground level and 300mm beyond the plan building edge)

b.  Cutting and filling

•    BOQ should contain the following sections (a) a List of principal quantities, (b) Preambles, (c) Daywork Schedule, (d) Work items (grouped into parts) (e)

Summary pages and (f) Grand Summary and be built according to CESMM4 revised.

•   Show all the workings, including,

o Grid breakdown (Use a 10m x 10m grid)

o Cutting calculations

o Taking off sheets

o Query sheets if necessary

•    For day work sections, add some of the material, labour and equipment that you think might be needed for the project, but rates are not required.

[20 marks]

QUESTION 2

The client for Project Vortex has decided to use a Lump Sum pricing method for the contract. Your company has been selected as the contractor for this project.

Tasks to be Measured by Your Team

Your manager has instructed your team to measure the following items for:

1.  Roads and paving, including excavation for road work

2.  Stormwater  Pipework  (This  would  relate  to  Pipes,  Fittings  and  valves, Manholes and pipework ancillaries, Supports and protection, and ancillaries to laying and excavation sections). Include only new construction work with connections to the existing.

3.  Wastewater  Pipework  (This would  relate to Pipes, Fittings and valves, Manholes   and   pipework   ancillaries,   Supports   and   protection,   and ancillaries   to   laying   and   excavation   sections).    Include   only   new construction work with connections to the existing.

•    BOQ should contain the following sections (a) a List of principal quantities,

(b) Preambles, (c) Daywork Schedule, (d) Work items (grouped into parts) (e) Summary pages and (f) Grand Summary and be built according to CESMM4 revised.

•   Show all the workings including,

o Calculation sheets

o Taking off sheets

o Query sheets if necessary

•    For day work sections, add some of the material, labour and equipment that you think might be needed for the project, but rates are not required.

[80 marks]

Assessment instructions for questions

•   Some drawings are not to scale. You can use drawings and dimensions from

detail drawings to measure. If there are no dimensions shown on the drawings, then develop an appropriate scale for measurement.

•   The accuracy of descriptions and quantities accounts for a considerable part of the final mark.

•   You can choose to use Costx or other software to prepare the document.

However, your submission should be according to examples 1, 2, and 3 (refer to the last three pages) and the CESMM revised 4 example book and handbook. You are required to show clearly how you came up with the quantities where necessary.

•   Consider how the Bill of Quantities (BOQ) should be structured and presented in professional industry practice, and prepare your submission accordingly.

You are expected to go beyond the basic classroom examples and demonstrate a higher level of application. Your work should reflect what would be considered excellent by current construction industry standards.

•   You should include the following files in your submission (refer to the file generation steps mentioned below)

o One PDF document for each question, which includes (t

    Front page (example 1)

   General and specific preamble notes for each section

    BOQ summary

    Detailed calculations of each item

    Drawings with dimensions take off details

    RFI sheet / Query sheet - (refer to example 3)

    Peer review report (refer to example 2) (you can choose to submit this individually)

   Generative AI uses statements from each student (attached at the end)

(B)MARKING RUBRIC

Assignment & Marking criteria

Marks

Portfolio 2

  Question 1

1.   Preparation of BOQ with supportive documentation suitable for industry practice, with clear documentation.

i.   Coverage of all documentation, including required

content, including grid maps, cut and fill calculations, and topsoil calculations

ii.   Presentation of each section, including Bills of

Quantities according to CESMM 4 revised directions (including preambles).

 

  Question 2

a.   Preparation of BOQ with supportive documentation suitable for industry practice, with clear documentation. Coverage of all

documentation, including required content. Presentation of

each section, including Bills of Quantities according to CESMM

4 revised directions (including preambles).

 

b.   Correct descriptions and appropriate headings / sub-headings for the measured items, including generic & specific preamble notes

i.   Roads and paving, including excavations

ii.   Stormwater

iii.   Wastewater

 

c.   Correct quantities for the measured items, including side-

casting, entry of measures, and quantity referencing. Schedule of quantities for the trades, presented in the correct SoQ or

BOQ format. Include query sheets (if necessary).

i.   Roads and paving, including excavations

ii.   Stormwater

iii.   Wastewater

 

Peer review report

Include peer review with the Student's name, ID, and Work section completed by each student

d.   Question 1

e.   Question 2

 

 

 

15

 

 

4

 

 

 

 

15

 

 

 

 

 

 

 

 

14

8

5

 

 

 

 

 

16

12

6

 

 

 

 

1

4

GRAND TOTAL

100

(C) LATE SUBMISSION & ACADEMIC INTEGRITY

a.  Plagiarism: Plagiarism is a very serious offence. DO NOT PLAGIARISE. Read the rules here:https://owll.massey.ac.nz/referencing/plagiarism.php.

b.   Late submission: A penalty of 3 marks will be deducted for each calendar day

(including weekends and public holidays) or a part of a day an assignment is submitted late after the Stream deadline. Assignments submitted more than 7 calendar days after the Stream deadline will not be marked and will receive a mark of 0.

c.   Extension of time: An extension may only be granted by the course coordinator based on the circumstances.

 

热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图