代写MEC5897 Lean Manufacturing Assignment 1代做Python编程

MEC5897 Lean Manufacturing

Assignment 1 – Production Flow Analysis

AIMS

This assignment aims to give you a chance to practice the skills you have learned in this unit to analyse a real production system. The specific goals of this assignment are listed:

1 Be able to use Value Stream Mapping (VSM) to analyse production system

2 Be able to identify the bottleneck, calculate the utilisation of different manufacturing resources under the maximum TH conditions

3 Build a simulation model to simulate a real production process with variability

4 Be able to analyse the simulated data and compare it with the theoretical calculation learned in the class

5 Identify the waste and 3Ms and come up with potential solutions

BACKGROUND

Fastcar is a foundry that is focusing on making an engine block for the automobile industry. Its customer is a car engine factory that assembly the engine block with other components into an engine.

Figure 1 Engine Block of a car

In Fastcar, the Engine block is made by the die casting process with Al alloy. Figure 2 shows the manufacturing process of die casting. The melting Al liquid will be poured into the casting machine and pumped into the die. In Engine block manufacturing, the die is made of metal which can be reused, while the core is made of sand. The sand core can only be used for a single-engine block.

Figure 2 Die casting process

The video in this link shows how to use die casting to make an engine block.

https://youtu.be/N2hYTdrzujI

Fastcar received an order from its customer every two weeks. The order is sent to the marketing office of the Faster car via its online ordering system. The marketing office will upload this information on its  internal  ERP  system.  Then,  the  production  planning  office  can  be  noticed  and  contacts  the purchasing department to order  raw  materials  (Al  alloy)  and  also  prepare  the  consumables. The production planning office will also inform. the workshop management team of the production plan. Workshop management will coordinate each workstation to make enough engine blocks to meet the customer orders. The engine block will be fabricated and then stored in the FG inventory. After all the units  have  been fabricated  in the  current order. Then  Fastcar will  ship the engine  block to  its customer by truck. Fastcar is working five days per week and 8 hours per day.

In the workshop of Fastcar, the following process/resource should be used.

•    Step 1: Make sand core

•    Step 2: Die casting

•    Step 3: Clean and Inspection

•    Step 4: Machining

The detailed time and specifications for each resource are provided in a data file.

TASKS

Task 1 (5 marks): Based on the given data collected from the production line calculate the maximum TH (Also known as process capacity). During the calculation, do not consider the machine failures and use the mean process time for calculation. Also, assume the batch size in the core making step is one. And then calculate the WIP (not include materials in the raw material inventory and FGs inventory), resource capacity, utilisation and flow time of this production line under maximum TH (no buffer inventory before each manufacturing resource is needed, also do not consider the time spend in raw material inventory and FGs inventory). Calculate resource capacity and utilisation for each step.

Task 2 (5 marks): Build a simulation model to simulate the real production scenario. In this simulation model, we do not consider the variability in the process and the number of units that arrive in each order.  But  you should find the optimal  batch  size to  maximize  the  production TH  while  keeping inventory as  low as  possible.  For  each  resource, we  use  mean  process time and  do  not consider machine breakdown. Based on the simulation model you should calculate:

1 meanTH and real TH for production line

2 Utilisation of each manufacturing resource

3 Average WIP (include raw material inventory and FGI)

4 Average Lead time for each unit, average lead time for the order (the time between order arrive and order ship to the customer)

You should draw plots to show how these values change with respect to time.

Task 3 (5 marks): Build a new model that considers the variability in your production line.   Based on this model, calculate the following items:

1 mean TH of the production line

2 real-time TH of the production line, draw a plot

3 Utilisation for each manufacturing resource.

4 Average WIP in the system (include raw material inventory and FGI)

5 Average lead time for each unit and average lead time for each order

You should draw plots to show how these values change concerning the time

Task 4 (5 Marks): Discussion on how variability from manufacturing will affect the production line. Discussion based on comparing the results from the simulation model with variability to the model without variability. (Use the simulation data to support your claim)

Task 5 (5  marks): Build  VSM for this  production  process,  identify  the wastes  and  3Ms from this production line. Come up with a solution to deal with the identified waste. Build a VSM for the future state. Use the simulation model to prove that your solution is feasible (You can make reasonable assumptions. For example, move more workers to make sand core from clean and inspection can decrease 2 min in the processing time for core making and increase 2 min process time for clean and production)

DELIVERABLES

•    Deliverable 1: Assignment report (upload on moodle). It should contain the following key points. :

o Summarize the analysis result or calculation results (Task 1, Task 2 and Task 3)

o Necessary explanation on the steps for calculation (Task 1)

o Screenshot of simulation models (Task 2, Task 3 and Task 5)

o The plot should be clear and with labels of axis and units  (all tasks)

o Necessary explanation of simulation models including how to measure the key performance parameters such as TH (Task 2, Task 3)

o The screenshot of the calculation results from the simulation model (Task 2)

o Summarize the result in a table and do a comparison    (Task 4)

o Value Stream Mapping (Task 5)

o Proposed your improvement plan and validate it with the simulation tool (Task 5)

•    Deliverable 2: simulation models (Task 2, Task 3 and Task 5). Save them separately and compress them into a zip folder. Upload them on moodle.




热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图