EBUS612 (Postgraduates)

E-Business Enterprise System with SAP

2024 - 2025

(Semester 2)

Practical Assignment with SAP (50% of module mark)

Submission deadline: 12:00pm 15/05/2025

IMORTANT NOTICE: This is an individual assignment and your final report needs to be submitted via Turnitin. In your submission, YOU NEED TO STATE YOUR SAP SYSTEM ID FIRST!

1.   Results from your three case studies                                                                  (50%)

a.   Imaging you are managing a new material called ABC-brake set. It only can be produced in house. This item will also be further used for direct sales. Please identify what views need to be selected when you create its material master data in SAP and also specify what organizational level(s) should be associated with each view  and explain your reasons respectively? (2 pages)  (10%)

b.   Drawing from your PP case study, critically reflect how SAP drives the material requirements and production automation from demand management through various integration points. Clearly articulate the key benefits SAP offers, supporting your analysis with evidence from your case study. Additionally, connect your discussion to broader, credible resources to explore how these functions can support real-world businesses across different scenarios. (5 pages) (15%)

c.   Discuss the key differences between CO (Controlling) and FI (Financial Accounting) in SAP. How are these two modules integrated within the system? Use appropriate evidence from your system to support your analysis. Additionally, if you intend to group multiple company codes under the same controlling area, what conditions must be met? (1.5 pages) (5%)

d.   After completing your SD case study, refer to the discussions from the MM case study to identify all steps that impact the company’s general ledger. Support your analysis with relevant accounting documents and critically examine which accounts should be   credited and debited, providing clear justifications for your reasoning. (4 pages) (20%)

2.   Extension after your three case studies (50%)

You have already allocated the cafeteria costs to the cost centers. Now, you need to assess the R&D expenses to the Assembly and Maintenance cost centers. The R&D costs are incurred to support the total output of these cost centers.

To proceed, collect the accrued R&D costs of 120,000 USD in a suitable new cost center (e.g., Res1###) within the N4000 hierarchy area, using cost element 6340000. Then, allocate these costs to the receiving cost centers by creating appropriate statistical key figures.

Additionally, apart from the existing activity type (A###) output from the Assembly cost center, an additional activity type (B###) is introduced, contributing a total of 1,000 hours. The corresponding allocation cost element is 8000000, and the increased output of activity B### results in an additional 30,000 USD in salary expenses for employees in the Assembly cost center.

a.  Determine the new total activity price (unit price) for all activities (M###, A###, and B###). Provide a screenshot of the costing report for your Assembly cost center and briefly discuss the line items originating from the new cost assessment. (2pages) (10%);

b.   Manually calculate the overall cost assessment process with appropriate explanations and flowcharts. (3 pages)  (15%)

c.   Suppose your Maintenance cost center (MAIN###) now generates an additional 700 hours of repair output (R###, the associated allocation cost element is 803###4), where 50 hours are used by Res1### and 100 hours by ASSY###. Provide an updated costing report for the Assembly cost center and discuss the key changes. (2 pages) (10%)

After completing the Product Costing case study, you decide to enhance product quality by adding two additional Chains and Brake kits to  your   final  product DXTR4###. Additionally,  some  production  activities  have  been  relocated  to   a  new  work   center (WK1###), specifically for the first and fifth production operations. The first operation includes 5 minutes of Setup and 15 minutes of Labor. The fifth operation includes an additional 3 minutes of Setup and 5 minutes of Labor.

d.   Demonstrate the screenshot of your new product cost estimate with itemized view and develop a discussion about this new report (e.g. How is this report structured? What are the  main  changes  and  what  are  the  root  causes  of those  changes?  Etc.).  You  use information (hint: activity price in CO) from your system to support your analysis (4 pages)          (15%)

To create the new work center, the following tasks are needed:

1. Create a Work Center:

o  Use the SAP search bar to find "Create Work Center."

o  Enter the following details:

Plant: DL00

Work Center: WK1### (replace ### with your SAP ID)

o  In the Copy From section, enter:

Plant: DL00

Work Center: ASSY1000

o  On the next  screen,  select the following data to be copied: Basic Data, Texts, Classification, Subsystem Grouping, Default Values, Capacities, Scheduling, and Costing. Click Copy at the bottom right.

o  In the Technology tab, set:

Machine Type: 0003

Sort String: 0003

CAPP Planner Group: 000

o  Click the Costing tab and ignore the pop-up message and press ENTER.

o  Change  the  cost  center to your Assembly  cost  center (ASSY1###) and assign activity type B### to Setup and Labor in the Activities Overview. Click Save to complete the creation of the work center.


热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图