SOLA9104 Assessment 2

HRES Case Study Report (Individual)

Weighting: 60% of total course mark

Due date: Friday Week 10 (21st November)

Submission: Turnitin via Moodle.

Type: Individual assignment, your answers must be original and from your own work.

1 Overview

The purpose of this assignment is to assess your knowledge of HRES operation, HOMER functionality, and how to use HOMER to conduct a techno-economic analysis of a HRES.

For this assessment, you will be assigned a case study, and complete the tasks outlined in this brief. Case studies include:

1)  Tuvalu – Vaitupu

2)  Tuvalu – Nanumaga

3)  Tuvalu – Funafuti

4)  Cook Islands – Mangaia

5)   Bamyan hospital

2 Report structure

Your final submission will consist of a written report and Excel spreadsheet to show method and working. It is expected that the report be no longer than 15-20 pages (minimum 11pt font) excluding references and appendix. The report should include the sections described below. The task associated with each section is described in Section 3.

1.   Introduction

2.   Site assessment

3.   RE resource assessment

4.   Risk assessment

5.   Load assessment

6.   Design scenarios

a.   Minimum Renewable Fraction (MRF) = 0% (diesel only)

b.   MRF = 30% (diesel and solar PV)

c.   MRF = 60% (diesel, solar PV and battery)

7.   Relationship between COE and MRF

8.   Sensitivity analysis

9.  Advanced grid

10. References

11. Appendix

3 Task breakdown

3.1 Introduction

Briefly describe the context of your case study, including key elements such as loads, climate and location. Explain what questions you are trying to answer with your modelling and analysis.

3.2 Site Assessment

The site assessment should consist of the following:

•    A description of the site in terms of its location, the community (people, demographics, etc.), and the environment, and whatever else you identify as being important.

Existing electrical infrastructure

All sources of information and assumptions must be given and referenced.

3.3 RE resource assessment

The RE resource assessment should consist of the following:

Weather data analysis (temperature, wind, irradiance).

•    Suitability assessment for solar PV generation

•    Suitability assessment for alternative types of RE generation (even though they won’t be part of the design).

All sources of information and assumptions must be given and referenced.

3.4 Risk assessment

Highlight and describe any potential risks (logistics, environmental sensitivity, natural disasters etc.) identified following the site and RE resource assessment which may potentially have an impact on the viability of a HRES.

All sources of information and assumptions must be given and referenced.

3.5 Load assessment

Using the bottom-up approach, develop and present 24 daily average load profiles for your case study, one for each month for each weekend/weekday. These will be based on the information you obtained from the case study brief and any other data gathered (e.g., technical data for appliances, appliance ownership, appliance use, etc.).

•    Provide comment on your load profiles so the reader is able to understand their make-up, highlighting important aspects which may impact on your HRES design.

•    Calculate key metrics: peak demand (kW), minimum demand (kW), and daily energy consumption (kWh) for each daily load profile

•    All working for this task is to be done in an Excel spreadsheet and submitted to Moodle.

The load profile developed in this section is to be used for all following tasks. All sources of information and assumptions must be given and referenced.

3.6 Design scenarios

3.6.1   Scenario 1 - MRF = 0% (diesel only)

This task consists of four (4) sub-tasks:

1.   Use the method given in the lecture notes to manually size three (3) diesel generators to meet the load of your case study.

a.  All working for this sub-task is to be done in an Excel spreadsheet and submitted to Moodle.

2.   Build a system in HOMER using the diesel generators from sub-task 1

a.   If your system isn’t feasible, use HOMERS search space functionality to find a system with a set of generators as close as possible to those calculated in sub-task 1.

3.   Use HOMERs search space functionality to design a diesel only system which gives the lowest COE, while still meeting the load demand for your case study.

a.   Include a description of the final design (component sizes, HOMER parameters, COE etc.) and the search space method used.

4.   Download the HOMER results data for your two scenarios (sub-task 2 and 3) and for both scenarios, use it to create (a set of?) daily average profiles for the columns (load, generation, fuel consumption etc.) for a month that you think best explains the reason for the difference in COE between the two systems. Provide this explanation.

3.6.2   Scenario 2 - MRF = 30% (diesel and solar PV)

This task consists of five (5) sub-tasks:

1.   Use the method given in the lecture notes to size a solar PV system designed to meet 60% of average daily daytime load demand (kWh) for your case study.

a.  All working for this sub-task is to be done in an Excel spreadsheet and submitted to Moodle.

2.   Build a system in HOMER which includes the solar PV system from sub-task 1 and the diesel generators from Scenario 1 – Sub-task 1.

a.   If your system isn’t feasible, use HOMERS search space functionality to find a system with a set of generators as close as possible to those calculated in Scenario 1 - Sub-task 1.

b.   Manually size three (3) diesel generators using the new net load (consumption minus solar PV generation) of your case study

3.   Build a system in HOMER using the solar PV system from sub-task 1 and the diesel generators from sub-task 2

a.   If your system isn’t feasible, use HOMERS search space functionality to find a system with a set of generators as close as possible to those calculated in sub-task 2.

4.   Use HOMERs search space functionality to design a system consisting of solar PV and diesel generation which gives the lowest COE for a MRF = 30%, while still meeting the load demand for your case study.

a.   Include a description of the final design (component sizes, HOMER parameters, COE etc.) and the search space method used.

5.   Download the HOMER results data for your two scenarios (sub-task 3 and 4) and for both scenarios, use it to create (a set of?) daily average profiles for the columns (load, generation, fuel consumption etc.) for a month that you think best explains the reason for the difference in COE between the two systems. Provide this explanation.

3.6.3   Scenario 3 - MRF = 60% (diesel, solar PV and battery)

This task consists of four (4) sub-tasks:

1.   Use the method given in the lecture notes to size a solar PV system and battery designed to meet 60% of average daily load demand (kWh) for your case study.

a.  All working for this sub-task is to be done in an Excel spreadsheet and submitted to Moodle.

2.   Build a system in HOMER using the solar PV system and battery from sub-task 1 and then use HOMERs search space function to add a set of diesel generators which gives the lowest COE for a MRF = 60%, while still meeting the load demand for your case study.

a.   Include a description of the final design (component sizes, HOMER parameters, COE etc.) and the search space method used.

3.   Use HOMERs search space functionality to design a system consisting of solar PV, battery and diesel generation which gives the lowest COE for a MRF = 60%, while still meeting the load demand for your case study.

a.   Include a description of the final design (component sizes, HOMER parameters, COE etc.) and the search space method used.

4.   Download the HOMER results data for your two scenarios (sub-task 2 and 3) and for both scenarios, use it to create (a set of?) daily average profiles for the columns (load, generation, state of charge, fuel consumption etc.) for a month that you think best explains the reason for the difference in COE between the two systems. Provide this explanation.

3.7 Relationship between COE and MRF

This task consists of three (3) sub-tasks:

1.   Build a system in HOMER with the lowest COE for the remaining MRF percentages (increments of 10%). Create a plot which shows the relationship between (lowest) COE and MRF

2.   Build a system in HOMER with values 0-100%, with increments of 10%, entered into the Sensitivity Variable Editor for MRF. Create a plot which shows the relationship between (lowest) COE and MRF

3.   Compare the two plots and discuss the differences (if any). Explain what you’ve learnt about HOMER from doing this task.

3.8 Sensitivity Analysis

This task consists of two (2) sub-tasks:

1.   For each HOMER system (0-100% MRF) used in Sub-task 1 of Section 3.7, perform a  sensitivity analysis using the Sensitivity Variable Editor for each of the systems used the following parameters:

a.   Maximum annual capacity shortage (%)

b.   Operating reserve for Solar power output (%)

c.   Diesel price ($/L)

d.   Minimum state of charge (%)

2.   Create a box and whisker plot for each parameter which shows how sensitive the COE is to each parameter for each 10% increment of MRF

3.9 Advanced grid for battery scheduling

This task consists of three (3) sub-tasks:

1.   Using your 60% MRF system, remove the diesel generators and add a grid connection

a.   Use a Scheduled rate with following Time of Use (TOU) tariff defined under Rate Definition

Peak 4-9pm (50c/kWh)

Off-peak 9pm-7am (15c/kWh)

Shoulder 7am-4pm (25c/kWh)

b.   Give a monthly breakdown of Energy purchased (kWh), Peak load (kW), and Energy charged ($)

2.   Download the HOMER results data and analyse the data to determine how best to edit the rates under Rate Definition to control battery charging/discharging to maximise the reduction in Energy purchased (kWh), Peak load (kW), and Energy charged ($) for each month.

3.   Provide analysis of the downloaded data explaining how you determined how best to edit the rates.

3.10 References

List your references here

3.11 Appendix

Put any content referenced in the main body of your report (that isn’t included in the references section) here. If it’s not referenced in the main body of your report it won’t be read.

4 Assumptions

Use the following assumptions when designing your system:

System

•    All components on AC except battery on DC bus (connected via converter)

Operating reserve

•    Load in current time step = 10%; Annual peak load = 0%; Solar power output = 10%; Wind power output = 0%

Electric Load:

•    Use default Random Variability

Battery:

•    Battery control = LF

Economic:

•    All values in $USD

Discount Rate: 6%

Inflation: 2.5%

•    Project lifetime: 20 years (components have different lifetime, present assumptions for each)

•    O&M costs for all components = 1% of capital

Diesel generators:

Capital cost = $4250 x kVA^0.5

•    Default settings for parameters otherwise

•    Diesel = $2/L

Use default fuel curve

Losses:

•    Component losses (solar PV inverter, battery, cabling, etc.): make your own assumptions, provide references

Solar PV system

•    Solar PV panel degradation: make your own assumptions, provide references. Set under Multi-year in HOMER.

5 Additional information

•    We’ll be very strict with the page limit and will not mark any information beyond the limit. The purpose of this is for you to decide what’s relevant and to show your work and results in a succinct way.

•    The Appendix can exceed the page limit, and it will not be marked.

•    Any existing diesel generation on-site is to be ignored as part of your design.

•    Appendix content should only be included if it’s referenced in the main body of your report.



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图