代做Tools for Engineering Design 2 Masterplanning Project 2025帮做Python语言程序

Tools for Engineering Design 2

Masterplanning Project 2025

Weeks 2-5

This Masterplanning Project is a challenging conceptual design problem that further develops your understanding of conceptual design and the skills that this requires. This project involves:

•     A non-engineering Client who is seeking your help to solve a problem, but whose brief does not contain all the information that you might want.

•     Coping with competing demands upon the design solution.

•     Producing design solutions where there is uncertainty and contradiction.

•     Presenting clear and distinct options to different stakeholders.

•     Deciding how much information is required to produce a conceptual design within the available time.

This project will also be split into three distinct parts:

1.    Week 2 - initial designs to brief (Divergent design)

2.    Week 3 – guided peer to peer design reviews (Judge/Test)

3.    Weeks 4&5 – consolidation of design concepts (Convergent design)

Week 2

This week you will need to come up with your initial design ideas in response to the brief (on the next page). These are not your final ideas, but ideas to have discussions over and to allow you to research into what information you might    need to get.

Next week you will sit with another group (fellow designers) and discuss your ideas, and their ideas, to dig deeper into what is being proposed and how it will be created.

This week you need to produce three different initial design ideas that meet the brief. You have a maximum of 6 A3 sheets to communicate your three initial masterplan ideas. Each page needs to have a title block in the bottom right of the page, communicating as a minimum the page title, page number, and group number (see example below).

Drawings will be reviewed by fellow designers in week 3, and these drawings should be understandable from the drawings alone (note that these will not need to be neat final drawings, but legible to others).

Masterplan – Cheap option page 2

Page: 2

Group: A2

When considering your designs, you will need to answer the questions such as:

•     What is your idea,

•     Who is it going to affect (both at the end and during construction),

•     Why you are developing this idea,

•     Where are resources coming from, where are you putting things, and

•     How are you going to create this masterplan.

This week, it is a good idea to focus on the “What” of your ideas, but to keep in mind the other aspects as you discuss them this week and next, as they will impact (sometimes significantly) the development of your ideas.

At the end of your Friday session (either 10.50, or 1pm), you will submit three hand-drawn masterplans, and we will scan and share these with the groups on learn ready for Week 3. These initial plans are not marked but will be foundational to the development of your final submission in Week 5.

Overview

Your design team has been commissioned by the City of Cape Town in South Africa to develop a UN Sustainable Development Goals focussed masterplan strategy for an informal settlement area called Masiphumelele. The Client has asked you to develop a range of three masterplans for this area.

The City of Cape Town (CoCT) does not currently have funds for this development, but intends seeking governmental funding, international grant aid from the World Health Organisation (WHO), and other NGOs (non-governmental organisations), and funding from the residents themselves. The Client envisages this to be a 45%, 45%, 10% distribution of supporting funding, (WHO, NGOs, residents respectively). Before they can seek funding, the Client requires masterplan concepts that demonstrate the range of strategies that might be followed in the area, the timescales over which they would be developed, and their relative costs and benefits (e.g. really cheap to very expensive). The Client has therefore engaged your team to develop these initial conceptual masterplans. The World Health Organisation, the City of Cape Town and residents all want more sustainable living condition and service provisions within Masiphumelele.

You are required at the end of the project (Week 5) to produce two sets of drawings:

1.    annotated drawings that explain your proposals to the City of Cape Town; and

2.    pictorial posters that can be used as the basis of discussion with the local community noting that these

need to be interpretable to a wide range of people with different languages/backgrounds.

These drawings must give a clear exploration of the relative merits and disadvantages of the different masterplans and must include a clear recommendation of which masterplan should be taken forward.

Masiphumelele informal settlements

The targeted communities are situated in the informal settlement areas of Masiphumelele, where housing is densely packed. Figure 1 shows the location of these areas in Masiphumelele from the City of Cape Town Census in 2011, whilst Figure 2 shows the google earth image of the same area in 2018 showing the change and growth of the settlement since 2011. The settlement has densified over time as it cannot readily expand northwards due to the   marsh that boarders it, although people do settle there. More recent images are available and should inform. your plans.

According to the 2011 census, there are 22,000 people living in the Masiphumelele area, however separate analysis has put this figure as high as 38,000. Amenities are scarce, with an overcrowded school, no police station, and an understaffed day clinic. It's estimated that 30-40% of the community are infected with HIV and/or TB.

A 2022 digital census showed changes to living conditions in the City of Cape Town and the Western Cape, however data are not yet available at municipality or community level as yet.

Physical hazards in Masiphumelele are flooding (e.g.https://www.groundup.org.za/article/informal-settlements-flooded-heavy-rains/), fire (e.g.https://ewn.co.za/2015/12/01/Masiphumelele-shacks-rebuild-structure-needs-to- change), and poor sanitation (see figure 3).

A recent 2021 assessment of how the City of Cape Town is doing against the UN’s Sustainable Development Goals can be found here and is a useful resource to help guide plans -

https://resource.capetown.gov.za/documentcentre/Documents/City%20research%20reports%20and%20review/CCT_Voluntary_Local_Review_2021.pdf

Figure 1: 2011 census areas of Masiphumelele

Figure 2: Google earth image of Masiphumelele including overlay of 2011 informal settlement census areas (red), 2018 identified informal settlement areas (blue), and 2023 identified areas (yellow)

Figure 3: (Left) - open storm drains clogged with rubbish; (Right) toilet blocks being cleaned by residents of informal settlement

•     Key results for 2011 Census Suburb Masiphumelele:

o  The population is predominantly Black African (91%).

o  35% of those aged 20 years and older have completed Grade 12 or higher.

o  69% of the labour force (aged 15 to 64) is employed.

o  82% of households have a monthly income of R 3,200 or less (approximately £170/mnth). 53% have monthly incomes of less than R 1,600.

o  27% of households live in formal dwellings.

o  73% of households have access to piped water in their dwelling or inside their yard.

o  91% of households have access to a flush toilet connected to the public sewer system.

o  99% of households have their refuse removed at least once a week.

o  95% of households use electricity for lighting in their dwelling.

o  57% speak isiXhosa (only 7% speak English)

Problem Construction

Before attempting to produce any design solutions, it is very important to properly define the problem that you are trying to solve. Spend the first half hour discussing and researching the following within your group.

•     Who is the Client, what resources do they have, and what do they need from you?

•     What does the Client need from the masterplans?

•     Many new building interventions end up being under-used or used for other purposes, why do you think this might be? What implications will this have for your design?

•     What criteria will you need to consider in your health & wellbeing masterplan for the area, and what order of priority would you place on these criteria?

•     How are you going to assess which of the different masterplans has the most potential?

•     What features of the health & wellbeing system need to be determined at the conceptual design stage (and what features do not need to be determined now)?

•     Who will build / implement the masterplan? What materials, products and equipment do you think might be best to use? What implications might this have on your design?

•    Are there previous examples or inspiration that you can draw upon for your design? Be critical about

previous examples; are they really the best solution to the current problem; how could they be improved?

Useful links:

• https://documents1.worldbank.org/curated/en/104061468037564451/pdf/840360v10WP0Bo0on0practice0 sept2010.pdf

o  General overview of what Master planning is and how it is used.

• http://www.mbccc.ca/wp-content/uploads/2017/09/MCCC-Conceptual-Development-Plan.compressed.pdf

o  An example of a masterplan - more floor plans than we are expecting from you.

• http://www.camerontoll.co.uk/wp-content/uploads/2022/01/2021-12-01_Cameron-Toll_ALL-7-BOARDS- lowres.pdf

o  Pretty images, that show connection to surroundings but lacks phasing and is too text heavy.

For Weeks 4&5 - Conceptual Design: UN’s SDG Masterplans

A group submission is required at the end of Week 5 that contains two sets of drawings in different styles, for different viewers:

1. Annotated drawings that communicate the three health & wellbeing masterplans to the City of Cape Town,  their relative merits, and your recommendation of which to pursue, on no more than four sides of A3 paper.

2. Posters that will be used to present the three masterplans and your recommendation to the local residents, so as to prompt discussion. The local residents are, in general, not literate in English, and speak a variety of

languages. These posters must communicate the schemes and their key features without requiring an interpreter for any resident. The posters must not exceed four sides of A3 paper.

Some hints for preparing your drawings:

•    Think carefully about how you present your drawings so that the viewer (whether from the City of Cape   Town or the local community) can understand your three distinct design concepts, their merits, and your recommendation. Think about consistency across the drawings, even if they are drawn by different people.

•    There should be two distinct sets of drawings for the different stakeholders, and it must be possible to understand each set of drawings without reference to the other drawing set.

•    Think carefully about what is required for a health & wellbeing masterplan, and avoid spending time on details that are not required at this stage.

•     Long tracts of text are not appropriate on annotated drawings. Annotations should only require a few

carefully chosen words, and it should be possible to understand your design ideas by looking at the drawings at a glance.

Assessment

A group mark will be awarded for this work; however, all group members should complete an online peer assessment of contribution form. after submitting.

The Masterplanning Project will be assessed upon:

•     Quality of the masterplan solutions, as described by the drawings for the Client  (25% weighting).

•     Clarity of communication through the drawings for the Client (25% weighting).

•     Quality of the masterplan solutions, as described through the posters (25% weighting).

•     Clarity of communication through the posters (25% weighting).

A more detailed marking rubric will be given out in Week 4

The deadline for the final submission is 2pm (UK time) Friday week 5 (14th  of February 2025). Physical copies to the ETO desk.


热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图