代写218.326/218.336 Assessment 1: Simulation-Bid Presentation代做留学生SQL 程序

Assossment Guidel

218.326/218.336

Assessment 1: Simulation-Bid Presentation (50%, group presentation with group marking)

Submission deadline for presentation slides and other supporting documents: Wednesday 2 October 2024 by 23:59 pm.

Presentation dates: Thursday 3 October and Friday 4 October 2024. The schedule of team presentations will be published on Stream.

Each team is required to deliver a 40-minute presentation to the client panel (formed by Naylor Love and SBE staff), followed by answering questions from the panel (dress code: business smart). At least 4 group members must deliver the presentation in person. The presentation venue is at Naylor Love's headquarters: 129 Diana Drive, Glenfield, Auckland. Prior to the presentation, each team leader is required to submit the presentation slides and any other supporting documents (in one PDF file) that will be used during the presentation by the deadline mentioned above through Stream. The panel will disregard any presentation slides and supporting documents used during the presentation if they were not submitted through Stream by the deadline.

This is a simulation of the hid nrosontation of the tondor All the information on the hidding should he prepared from a main contractor's perspective. The presentation should show the final product of your tender (not a work-in-progress). Remember, this is a pitch to the client to WiN the bid. 

The topic of your presentation should be on:

A clear and robust management plan on how the (hypothetical) company and the team assigned to the project will ensure the delivery of the project within the time, schedule, quality and other measures.

The proposed solution with each team member focusing on at least one of the components (see points 1 to 8 in Assessment 2) of the project according to the role they have chosen. Whilst each presentation is expected to demonstrate a cohesive working team, individual contributions should be made clear for marking purposes.

Final outputs: company profile, method statement, construction programme & schedule, site plan, tender pricing, cash flow, risk assessment, etc (see points 1 to 8 in Assessment 2).

If you feel comfortable, you can have one slide showing your photos and contacts, as Naylor Love may want to get in touch with you after the presentation.

Assessment Criteria

See Course Assessment Framework.

Mark rubric will be uploaded and announced on Stream (Ngā oromatawai / Assessments tab).

Assessment 2: Portfolio-Tender Proposal (50%, tender document with group and individual marking)

Submission deadline of tender proposal document: Friday 25 October 2024 by 23:59 pm.

You may receive some verbal feedback and comments from the bid presentation. You will have three weeks to revise and finalise your tender proposal.

Your team is required to submit a final tender proposal by the above deadline through Stream. The final proposal should be prepared in a professional manner in a PDF document and set on an A3 paper layout (landscape orientation). Any diagrams, charts, tables, and other elements developed with other software should be included along with the proposal text or in appendices. Do not submit multiple documents. Only one proposal document (in PDF format) should be submitted for marking.

The format of the proposal is down to your own style. of writing; however, the proposal should provide discussion and analysis of the following components. The word limits in prentices are indicative. They aro not hord roauuiromonte.

1. Company Profile (2000 words) (5 marks): The hypothetical company profile includes some historical and financial background and the details of the key personnel that are proposed to be allocated to the project, including their role(s) in the performance of the contract. An organisational structure of your project team indicating the position and role of your nominated key personnel. An implemented management plan should also be included in delivering the job (supported by weekly meeting minutes in the appendix).

2. Method Statement (4000 words) (10 marks): To produce a detailed construction methodology required to deliver this project that will include the main structure and soft and hard landscaping. Use your imagination to note further assumptions regarding the build. Identify key activities. This must demonstrate a full understanding and intimate knowledge of the scope of works to be carried out, including resources, such as but not limited to materials, labour, specialised plant and equipment, quality, and regulatory compliance requirements.

3. Construction Programme & Schedule (3000 words) (10 marks): To identify, explain and develop a well-itemised program that includes all the construction activities from site establishment to practical completion. All trades, resources, and milestones should be clearly identified within your construction programme -Gantt Chart. The programme should demonstrate a robust understanding of the key relationships within the works, the key successors, and predecessors, as well as the critical path and milestones. Describe in detail all your identified items. All the activities needed to deliver the project must be broken down by trade, coordinated with a methodology and estimated duration based on the available resources. The final programme should be included as an appendix to your report. Ensure that the template used for your programme is clear and includes all the identified items.

4. Site Plan (2000 words) (5 marks): To develop a detailed plan of the site layout and arrangement, as this will play an important role in the selection of resources and methods to perform. the works. This visual representation will allow the construction manager to direct al the activities needed to get the project built. A plan will be required to be drawn, clearly showing the site office and associated buildings as temporary facilities. As part of your thought process, think about other challenges faced by the construction manager in organising the job site to make it both efficient and safe. The construction manager must have a strategy for directing and organising all the materials, labour, equipment, and plant that will be congregating on the site on a daily basis and moving in and out of the construction area throughout the duration of the project. Every aspect of getting the job done must be considered when trying to prepare the site for construction operations. Decisions about where to place everything from portable toilets to rubbish disposal areas and containers can make a big difference in how smoothly a job runs. In addition to laying out the most efficient placement of the site office and portable facilities mentioned above, the site logistics plan should also consider a number of other factors, such as the following: staged handover areas with dates, site security, access in and out, temporary works and protection of existing services, parking; traffic control; pedestrian safety; crane location; laydown areas; job site security; temporary service connections. The site layout and arrangement should include detailed drawings and be included in your final proposal, accompanied by an explanation. Use colours to highlight the above items to make the plan visually clear. Include a legend and scale.

5. Tender Pricing (50 marks): A structured pricing response utilising the Bills of Quantities (BOQ)/ Quantity Take-off (to be prepared by each team) and incorporating Costing (schedule of cost rates) for the work packages and a summary table for the whole project.

a. Accurately reflect the quantity and rate of work for each identified item through a BoQ (carpentry, concrete, precast, decorative, and structural steel). While the quantities for the main components of the structural steels have been provided, each team is required to draft preambles for the structural steelwork package and adhere to the ANZsMM requirements when pricing the structural steel.

b. Rate breakdowns that reflect the connection between the resource requirements and rates to the construction methodology and project programme. If the rate was developed, including the rate breakdowns.

c. Identify the amount of contingency that reflects the level of risk for the Contractor (identification, impact and likelihood followed by mitigation strategy to reduce impacts if successfully implemented).

d. Use a market reflecting markup considering the profit, site, and office overheads.

Note: all the factors such as company strategy, construction methods, project programmes, site plan, risks, and additional factors have an impact on pricing and need to be reflected in the pricing.

6. Cash Flow (10 marks): A detailed cash flow analysis incorporating the construction program and tender pricing from the beginning of the project to its completion. A projection of monthly expenses based on the schedule and expected payments.

7. Risk Assessment (2000 words)) (5 marks): Identify the project's risks and develop a suitable project risk management plan accordingly. The risk management plan should be included in your final proposal and accompanied by an explanation. This can be accompanied by a risk register and/or matrix. As a background, every project has an element of uniqueness, which implies uncertainty. Risks may have positive or negative outcomes; therefore, one should be aware of the fact that certain risks in projects must be accepted, reduced, or transferred. The ultimate goal of project risk management is to improve project performance and to supply the correct deliverables on time and within budget. Risks in projects should be managed in a professional way to limit a company's exposure to financial losses.

8. Additional Factors (1000 words) (5 marks): For instance, innovation, health and safety, well being, and socio-economic, political, legal, marketing, or environmental feasibility.

9. Contribution breakdown: A table showing the contribution from each team member to each above-mentioned component. Each team member can contribute to TWO components at maximum.

10. Appendices

Assessment Criteria

See Course Assessment Framework.

This is an exercise of a real-life tendering process. An INcoMPLETE component (e.g., a program that does not show the completion of the building or the total pricing of the building is missing) will receive a 0 mark for that component.

Mark rubric will be uploaded and announced on Stream (Ngā aromatawai / Assessments tab).





热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图