代做CMT654 DevOps 2024-25帮做SQL 程序

Assessment Proforma 2024-25

Key Information

Module Code

CMT654

Module Title

DevOps

Assessment Title

Portfolio

Assessment Number

1

Assessment Weighting

100%

Assessment Limits

Pipeline, pipeline report (1200 words), Performance analysis report (300 words), research report (1000 words). Total 2500 words + pipeline

The Assessment Calendar can be found under ‘Assessment & Feedback’ in the COMSC-ORG-SCHOOL organisation on Learning Central. This is the single point of truth for (a) the hand out date and time, (b) the hand in date and time, and (c) the feedback return date for all assessments.

Additional Demo of Pipeline in class Monday Week 11.

Learning Outcomes

The learning outcomes for this assessment are as follows:

1.  Use and troubleshoot a range of leading-edge DevOps tools for continuous

integration (i.e. automated building, packaging, testing and deployment), and justify the rationale for doing so.

2.  Use a range of Cloud tools and platforms, critically appraising the benefits of their use.

3.  Use of a range of appropriate tools and techniques to measure performance of various system components and investigate issues.

4.  Scale real systems to obviate performance issues, and overcome resource

constraints critically analysing the rationale behind design decisions with respect to Reliability, Availability and Performance.

5.  Discuss security implications of cloud solutions, utilising mechanisms to mitigate their effects.

Submission Instructions

The coversheet can be found under ‘Assessment & Feedback’ in the COMSC-ORG- SCHOOL organisation on Learning Central.

All files should be submitted via Learning Central.  The submission page can be found under ‘Assessment & Feedback’ in the DevOps module on Learning Central.  Your submission should consist of multiple files:

Description

Type

Name

Coversheet

Compulsory

One PDF (.pdf) file

Coversheet.pdf

Scripts

Compulsory

All scripts associated with the deployment pipeline and other parts of the coursework.

These must be within a zipped folder named Scripts

Scripts_[student number].zip

Report

Compulsory

Report with 3 sections:

1) Pipeline Report

2) Performance Report

3) Research Report

Report_[student number].pdf

There will also be an in-class demonstration during Week 11’s session where you will be required to demonstrate your working pipeline.

If you are unable to submit your work due to technical difficulties, please submit your work via e-mail to comsc-submissions@cardiff.ac.uk and notify the module leader.

Assessment Description

This is an individual assignment. There are no aspects of team submission.

For the purposes of this assignment, you will be working with the Spring Boot Client Application that you worked on last semester. This assignment will not assess the Client Application’s functionality but must include connectivity to a MySQL / MariaDB Database that you deploy.

You may use any branch from the Client Application to start from and if you really believe that using your Client Application rather than another team’s will put you at a disadvantage please come and see me and I will get you access to another team’s application.

You must not deploy the client project to any external service outside university hosted platforms (if in any doubt, speak to staff).

The work is split into four related sections:

45%

Deploy your application to the School’s OpenStack cluster, creating a

repeatable process (scripted)  that creates a Linux (Rocky or Debian. Debian will get more marks) test environment and uses Jenkins to pull your project

from your Gitlab repository and trigger a build and test of the application. The pipeline should include the build, installation and configuration of all required software to enable the application to run and to enable the application to be

tested according to Dev Ops best practices. The pipeline should leave the

application running on a separate server and accessible via a browser via the University’s network.

During an in-class demonstration session (week 11) you will be asked to open and run the application in the Dev environment (Intellij) make a simple change to the project, push that change to Gitlab and then demonstrate the deployment pipeline.

25%

Write a brief report (1200 words) on your pipeline discussing the decisions

behind creation of the environment, the testing schedule and the resources

used (e.g. web sites used to find instructions). In this report, you should

reflect on your choice of methods used in the construction of the pipeline (do not discuss decisions that you did not make e.g., you did not choose to use

OpenStack – this was a specified part of the project). You should also reflect on the use of the pipeline during the week 11 group exercise and it’s

limitations.

10%

Run performance analysis on the deployed project using a range of

appropriate tools as discussed in the sessions and worksheets (must include J Meter).

Produce a report (300 words, maximum 3 images) on your findings detailing your methods, what they hope to show and showing screen shots of tests you have run.

DO NOT!!!  run high load testing on the openstack instances. If you

wish to run high user and loop tests, run them on your local machine.

20%

Research report on transfer of project to the Google Cloud platform (1000 words):

Your company is negotiating for VC investment for a rapid expansion. Your

OpenStack server is now running out of power for the increasing client base and the application is rapidly expanding its feature set. Your company wishes to migrate to a Google Cloud offering. Write a recommendation on the

technologies that you will use, discussing the options and the justifications for your choice.

Tips:

1)  An image showing the architecture of your proposed solution (similar to the one in the notes for the current OpenStack solution may help).

2)  Stating assumptions on usage numbers may help with your costing estimates.

3)  Ensure that you have a final, cohesive, solution proposed.

Please note that this is a migration of the development / deployment pipeline not just a migration of the application.

Considerations for: Cost, Reliability, Security, Best Practice, Lock-in and Agile Development should all be considered.



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图