代做CENG0090 Financing of Renewable Resource Projects 2024/25代写C/C++编程

MODULE Code:

CENG0090 Financing of Renewable Resource Projects

LEVEL:

Postgraduate, Undergraduate Masters

This paper is suitable for candidates who attended classes for these modules in the following academic year(s):

Year

2024/25

Suitable for all candidates

Assignment Title

REPORT (50% of the module)

Submission Deadline

As stated in the Assessment and feedback

tab of the Chemical Engineering Student

Intranet.

Word limit / page limit

Submissions above the word /page

limit: the content that is over the

limit will not be marked and 5 per-

centage points will be deducted

(i.e. mark reduced by 5 marks for

an assignment with a maximum

mark of 100). The penalty will not

take the mark below the pass

mark.

In the case of coursework that is

submitted over-length and is also

late, the greater of any penalties

must apply and the content that is

over the limit will still not be

marked.

The report should be maximum 1500

words be typed with minimum 11pt Arial font (or equivalent font and size), mini- mum single line spacing, and with mini- mum 2 cm margin.

The pages should be numbered.

A cover page should not be included, and appendices are not permitted.

Figures, tables and their captions are not included in the word count.

Marking Criteria

Included in the assignment instructions

Submission Link

Assessment and feedback tab in Moodle

under the heading Assessment briefs

(See further instructions in the submission

link)

1. Uploading your submission

•   Unless specifically instructed otherwise in the assessment document, please up- load your work as a single .pdf file via the submission link on Moodle and by the given deadline.

Wherever possible you should type your answers and follow guidelines in

the assessment document on the preferred format (font, line spacing and so on).

•   If you do have to include any elements that are not typed/computer generated

(e.g. figures, diagrams, equations etc.), or you are unable to type your answers for any reason, please follow the advice for submitting handwritten answersfor any submission that requires scanning documents (the webpage refers to 24-hour timed exams but is applicable to all online submissions).

•   If for any reason you are not able to use the app recommended by ISD at the link above, you can consult the following resources for advice about preparing your submission:

• Submitting handwritten assignments to Moodle using mobile or tablet devices - MS One Drive App

If handwritten work is not readable then it would not be possible to allocate marks to the work.

Please DOUBLE CHECK that the file you are uploading is the correct one

and is complete (with all pages visible) before the deadline. You will not be allowed to re-submit the file after the deadline.

2. Technical Problems

If you encounter difficulties downloading or submitting your assessment via Moodle, then please immediately notify (by email) the Teaching & Learning Team

([email protected]).

Please note that the final submission must be via Moodle.

Work submitted via email will not be accepted and will not be marked.

3. Advice and other support

• Advice about Extenuating Circumstances

• Student Support and Wellbeing

CENG0090

Financing of Renewable Resource Projects

Report (50 % of the module).

To be submitted via Moodle before 09:00 on the 26th  of March 2025.

GenAI  Category  2: AI  tools  can  be  used  in  an  assistive  role  for  the  following  purposes  only: proofreading and structuring your submission. If considerable changes have been made to your content, then this could be considered academic misconduct. Background research may be performed using GenAI but it is expected that any information obtained from GenAI is critically evaluated and validated using literature sources. Where you have used GenAI for proofreading it is still recommended to do final proofreading yourself as often technical terms can be changed altering the meaning completely. If you do use GenAI then you must acknowledge the use of it.

Investment  in  renewable  assets  requires  the  large-scale  deployment  of  capital, amounting to potentially high risks for the project sponsors. To mitigate these risks, investors   undertake    detailed    due   diligence    to   formulate    a    comprehensive understanding of a project, before making a Final Investment Decision (FID).

You have identified a renewable asset that might be a viable investment opportunity for your company, a project sponsor. You are tasked with providing a final investment proposal for this renewable asset. Based on the information provided below, and your own independent research, you need to critically evaluate the proposal and give a robust explanation as to whether your company should consider investing in the renewable asset.

Your proposal report should incorporate the following considerations to provide a comprehensive project evaluation:

An introduction to the project.

An investment proposal. The  proposal  will  include  your  chosen  investment methodology and propose key financing methods and structures to be used. This will cover aspects such as the key parties involved in the deal, who will finance the deal and how this financing will occur.

Due diligence. Evaluation and discussion of the  proposed  project  characteristics including (but not limited to) technical characteristics, geographic factors, key risks, ESG considerations, and relevant policy considerations to undertake a detailed due diligence for the formulation of an overall assessment. You should critically assess these characteristics, evaluating their impact on the viability of the proposal from an investor standpoint; how might they affect the outcome and are there any mitigations that could be implemented to improve the attractiveness of the proposal from an investor perspective?

A concluding final investment decision.

Additional details

The asset details covering the revenue stream, country of development, and some of the key site details are indicated on the next page, which provides you with a unique problem to discuss. You should evidence any claims  made,  including  the  use  of examples to justify your conclusions.

100 Marks

The project

Please note. In order to randomise each of your reports, each report will be

linked to your student number, which is an eight-digit number;

The sixth digit correspond to X, the seventh and eighth to YY;

E.g.: 18163849; X = 8 and YY = 49.

Basic financial structure for all projects is:

•    Debt to Equity Ratio: 70:30

•    Loan Term: 15 years.

•    Interest Rate Structure:

o Base Rate: Country-specific (e.g., SONIA, EURIBOR)

o Margin: +200 bps (2%)

o Total Interest Rate: Base Rate + Margin

Assets are listed below; your asset corresponds to your value of X:

0 - 2: Solar PV (50 MW): Former agricultural land that is now redundant with previous existing  infrastructure  such  as  access  roads  still  in  good  condition.  There  is  a  grid connection point 3 km away - the local grid is relatively well stabilised by a battery network and has been recently upgraded to increase its capacity. The site has flat topography with no shading issues and excellent solar irradiance ratings. Some seasonal groundwater flooding in 20 % of the site requires elevated mounting systems. The local community is supportive due to proposed sheep grazing between panels, though visual screening needed for nearby heritage site (1 km away). An archaeological survey completed with no findings.

The revenue stream setup is a fixed price PPA over a 25 year lifetime.

3 - 5: Offshore Wind (500 MW): Seabed location 25 km from shore with excellent wind resource. Port facilities require a £ 50 m upgrade for construction and O&M activities. The grid connection requires a new 40 km subsea cable to shore, then a further 15 km onshore to  the  substation.   Marine  mammal  migration  routes  require  seasonal  construction restrictions. Commercial fishing interests are active in the area, but a compensation framework has been agreed. There is a moderate to severe risk of extreme weather events in the area requiring the implementation of increased shoring (10% increased CAPEX over traditional shoring cost) and the use of high shear resistance blades, 25% higher CAPEX than traditional blades.

The revenue stream is a hybrid of a fixed PPA for 15 years, followed by 10 years at market rate with a price floor guarantee at 70 % of the original PPA.

6 - 9: Onshore Wind (100 MW): Upland site with exceptional wind resource across undulating terrain. A grid connection is available 8 km away but requires an upgrade to handle  the  proposed  increased  load.  Access  roads  need  significant  improvement, including two new bridges. A protected bird species nesting nearby requires ongoing monitoring. The local community has provided a mixed response to the proposal; farmers are supportive, but there is opposition from hiking groups due to a popular trail that will require re-routing. Ground conditions are mostly competent rock, with a good bearing capacity. The local grid is frequently imbalanced due to large quantities of rooftop solar in the area.

The revenue stream is a government backed contract for difference over the 25 year lifetime, with a floor and ceiling price incorporated.

The countries under consideration are listed below; your country corresponds to your value of YY:

1 - 20: United Kingdom

21- 40: Australia

41 - 60: Norway

61 - 80: China

81 - 99 (and 00): Spain

If your combination of values gives you Solar PV in Norway, please choose Australia instead.

At the beginning of your coursework, write your student number and the corresponding project and country.

Marks will be awarded in the following areas:

Category

Brief Description

Weighting

Response to task set

Arguments develop logically leading to a sound conclusion with a clear understanding of wider context throughout

20%

Knowledge and Understanding

Demonstration of engagement and understanding of course material

20%

Reasoning and Critical Analysis

Demonstration  of ability  to  make  connections between  ideas,  to draw logical insights from them, to consider implications of arguments, and to discuss a variety of sources critically

20%

Independent thought

Own ideas articulated and justified rather than only repetition of content of course materials or readings

20%

Engagement with literature and

referencing

A variety of well selected readings are used and

references are in the correct format.

10%

Writing and communication

The report reads well and is easy to follow. It is

written  in  the  appropriate technical style as

specified by the task document.

10%




热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图