1.       Problem Statement

A client has commissioned your company to conduct a heat load analysis and design the HVAC system for a 2-storey shopping centre, as described in the attached project specifications and drawings. Your manager has tasked you with calculating the cooling and heating loads and performing preliminary duct design and unit selection for a section of the building with the aid of preliminary computational fluid dynamics (CFD) analysis.

This assignment is divided into two parts: Part A and Part B. To submit a subsequent part, students must have  already  submitted  all  previous  parts.  When  submitting  Part  B,  combining  it  with  Part  A  is unnecessary, but keeping a copy of the combined document yourself is highly recommended. This combined document (A-B) will be valuable for presenting your experience from the coursework to the industry, such as in future job interviews.

A professional report should be submitted for every part. The report shall include an executive summary  (with  a  tabulated  summary  of  results),  introduction  and  conclusion.  Figures  and  tables  shall  be  appropriately captioned. A consistent referencing system shall be used throughout (e.g., IEEE or Harvard). The report shall include a contents page, a list of figures and a list of tables. The body of the report should  be organised in a logical and coherent fashion. The helper document provides a useful guideline for  organising the body of the report; the headings/order should be followed but maybe adjusted, and the list  is not exhaustive. Writing  should be concise and to the point, avoiding  superfluous information or  repetition of content. The report should be formatted neatly to allow information to be conveniently  extracted. Each part of the assignment will have a maximum limit of 25 pages, not including appendices.

However, you should assume that the marker will not mark anything in the appendices. The following documents should be used in conjunction with this overview:

•    Assignment 1 – Building Layout

•    Assignment 1 – Project Specifications

•    Assignment 1 – Preliminary CFD analysis results

•    Assignment 1 – Assignment Helper

Part A Due by Week 7, Friday 25th  of October

Section A1

This section requires students to implement the heat load calculation methodology outlined in AIRAH- DA09. A detailed manual heat load calculations for the Gym (Planet Gym) must be performed and reported for summer and winter. Reporting must include (but not limited to) the following items:

(1)        Design Day Selection and Specification Comprehension

(2)        External Loads Wall Specifications

(3)        External Loads Solar Transmission

(4)        External Loads Partitions

(5)        External Loads Winter

(6)        Internal Loads Summer

(7)        Internal Loads Winter

(8)        Cooling and Heating Load Summary

(9)        Psychrometrics (Summer only)

Section A2

This part requires students to compare their hand calculations for the Gym with the cooling and heating  load simulation produced by CAMEL software. (Note: the results for the CAMEL simulation are provided. Students are not expected to complete the simulation on CAMEL but to discuss the results).

Ensure that you follow the assignment helper as it details the minimum that is expected from each submission.

Part B Due by Week 10, Friday 15th  of November

Section B1

This part requires students to determine the layout and function of each part within the whole shopping centre. A detailed calculation of the heating and cooling load is not required. Instead, the submission should include (but not limited to) the following elements:

(1)       Produce conditioned/ventilated space maps

(2)       Prepare a design brief, identifying the key factors to consider for each part of the shopping centre in terms of HVAC designs

(3)       Calculate for ventilated space requirements

Section B2

This part requires students to further build upon  the previous part by conducting pressure  loss calculations on duct runs to determine required fan parameters. Other equipment, such as AHUs, will also be selected before concluding the report with sustainable design considerations with preliminary CFD case studies. The submission should include (but not limited to) the following elements:

(1)       Air schematics

(2)       Duct Design

(3)       Pressure loss calculations (Ventilated spaces only)

(4)       AHU selection

(5)       Building improvements and sustainable design based on provided preliminary CFD case studies

Ensure that you follow the assignment helper as it details the minimum that is expected from each submission.

2.       Design Constraints

Outside design conditions:

    Latitude                                                               30South

•      Summer                                                               34.7 C DB / 23.3 C WB

     Winter                                                                  4.2 C DB/70% RH

•     Building north is defined as the same as true north

•     Minimum supply air temperature                       12。C

•     Cooling coil effectiveness, ηc                                0.85

•     Outside air requirements: 12.5 litres per second per person

3.       Building Details

Location:                       Temperate Town. Climate zone 6.

Building Type:              Shopping Centre (Class 6). Gym (Class 9b)

Building Description: The project is a two-storey shopping centre. The building contains a variety of services for customers in Temperate Town.



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图