NFS6071代做、Java/Python程序语代写
NFS6071:

Individual

Assignment One

Due: Week 9 (27 September 2024, 2359hrs)

The University of Sydney Business School

2024

INFS6071: Individual Assignment 1, S2-2024

1

Contents

Background .................................................................................................................. 2

Task ............................................................................................................................. 2

The Deliverable ............................................................................................................ 4

Submission Requirements ............................................................................................ 4

Assessment Criteria ..................................................................................................... 5

Marking criteria: Individual Assignment One ................................................................ 6

INFS6071: Individual Assignment 1, S2-2024

2

Background

(Assesses: LO1, LO2, LO3, LO4)

The top reason for project failure is the project itself. Wrong

projects are ones that defy conventional business rationale,

creating outputs that either few people want, that add little to no

real value, or that undershoot the desired benefits because they

are so difficult to achieve. In short, they fail in rationale and

objective reasoning. They are sometimes called white elephants.

(Wu & Misra, 2023)

Task

Part A: Critical Path Analysis

Description of Requirements: You are employed as a Project Manager at

Comarda, and you have been awarded a contract to develop a new automated

inventory control system for Assum Pullum Express, a new fast-food chicken chain

opening several stores across New South Wales. The project's scope and work

breakdown structure have already been decided upon. Tasks and their contents,

durations, and resource requirements are shown in Table 1. Predecessors of tasks

imply which tasks must be conducted before the current task can be started.

Activity

Code

Task/Activity Duration

in days

Predecessors

A Start-up planning and design 5 -

B Equipment determination and planning 8 A

C Specific software determination 9 A

D Production line planning and determination 4 B

E Equipment planning 7 B

F Software planning 17 C

G Equipment documentation 10 E

H Documentation of operational system 13 F

I Detailed hardware blueprints 7 E

J Hardware component orders 1 I

K Hardware component delivery 6 J

L Integration of phase 1 12 D, G, H, K

M Prototype development 10 L

N Prototype introduction 6 M

O System evaluation and improvement 9 N

P Hardware assembly 18 N

Q Computer system installation 7 P

R Project documentation 4 O, P

S Integration of phase 2 12 Q, R

INFS6071: Individual Assignment 1, S2-2024

3

a. Create a network diagram using the activity on node (AON) notation

representing the project, as presented in the unit.

(2 marks)

Identify the Critical Path: Use the table to determine the task

sequence that forms the critical path.

Calculate Start and Finish Times: For each task, calculate the

earliest start (ES), earliest finish (EF), latest start (LS), and latest finish

(LF) times.

Calculate Slack Time: Determine the slack time for each task.

You may use PowerPoint to draw and copy the diagram into your

assignment document. You should not use Microsoft Project or

any other project management software for this part of the

assignment.

b. In the context of the above project with Assum Pullum Express, explain

possible key challenges in managing projects using its critical path. Please

use appropriate references to support your explanation. (3 marks)

Part B: Project Analysis

Project management is a critical discipline in business. It aims to ensure that projects

are within scope, completed on time, within budget, and to the desired quality

standards. However, not all projects succeed. Understanding why projects fail is

essential for future project managers to learn from past mistakes and improve their

skills. This assessment aims to provide students with a comprehensive

understanding of the complexities and challenges in project management by

analysing real-world examples of failed projects.

Importance of Analysing Failed Projects

Learning from Mistakes: Analysing failed projects helps identify common

pitfalls and mistakes, providing valuable lessons for future projects.

Risk Management: Understanding the risks that led to project failures can

improve risk management strategies.

Improving Processes: Insights from failed projects can improve project

management processes and methodologies.

Stakeholder Communication: Failed projects often highlight stakeholder

communication and management issues, offering lessons on how to handle

these aspects better.

Innovation and Adaptation: Learning from failures encourages innovation

and adaptation, helping project managers to be more flexible and responsive

to changes.

You are to conduct independent research and select a recent project (in the last 5

years) that can be considered a failure (from a project management perspective C time,

cost, budget).

To accomplish this,

1. Students are required to select one of the following recent failed projects,

conduct a detailed analysis, and present their findings in a report. The report

should cover the following aspects:

INFS6071: Individual Assignment 1, S2-2024

4

Project Overview: Brief description of the context (country, industry,

markets, company, products/services), the project, its objectives, and key

stakeholders.

Potential Reasons for Failure: Detailed analysis of the key factors that

potentially led to the project's failure. There could be contradictory

indicators or varied ideas presented in the literature. These reasons

should be linked back to the Project Management Performance Domains

and Project Principles.

Impact: Examination of the impact of the failure on the organisation and

stakeholders.

Lessons Learned and Recommendations: Key lessons that can be

learned from the project failure. Suggestions for how the project could

have been managed differently to avoid failure.

Notes

1. Have a proposed project management case study to present to your tutor in

your week 6 tutorial.

2. All requirements about the case under investigation should be clearly

addressed (Support your argument using appropriate references Ce.g. news,

trade press and academic).

3. You may investigate a problem that occurred anywhere in the world, but all

references, including the incident's source of information, must be available in

English.

The Deliverable

Total written report: 2000 10% words (excluding in-text references and reference

list).

Part A: Critical Path Analysis ? 400 words

Part B: Case Study Analysis ? 1600 words

Note: Please use tables, diagrams, and charts to prepare a

concise response.

Submission Requirements

Submit your report (Individual Assignment 1) by the due date shown on Canvas.

You will find the link to submit the report in the Assignment section of Canvas.

The report should be formatted using A4 paper size, 1.5 line spacing, 2.5cm margins,

and a sans-serif font size of at least 12pt (e.g., Arial, Helvetica, Calibri, Aptos).

INFS6071: Individual Assignment 1, S2-2024

5

Late submissions will be penalised in accordance with the University and Business

School Policy as set out in the UoS outline.

Artificial Intelligence

This assignment is considered a Lane 2 C Examples of human-AI collaboration in

assessment as learning assessment type.

You are permitted to use generative AI to help you; this use must be

acknowledged. For example, you may use AI tools such as (ChatGPT, Google

Gemini, and Microsoft CoPilot) to brainstorm ideas for your assignment. You may

use AI tools such as (Grammarly, Notion AI, ChatGPT, etc.) to directly suggest

readability improvements to your text in terms of grammar and expression.

Do not post confidential, private, personal, or otherwise sensitive information into

these tools. If you use these tools, you must be aware of their limitations, biases, and

propensity for fabrication. Your use of AI tools must adhere to the Student Charter

2020, including upholding honesty, ethics, professionalism, and academic integrity.

Acknowledgement of AI

If you use any AI tools, you need the following:

1. An acknowledgement:

I acknowledge using [insert tool name] to [what the tool did] on <>. With the

<>. What then happened?

For example, I acknowledge using ChatGPT (https://chat.openai.com/) to refine the

academic language of my own work. On 1 July 2024, I submitted my entire essay to

refine the academic language of my own work. The original essay can be found here

[link]. With the prompt: For the following essay, can you improve the academic tone

and accuracy of language, including grammatical structures, punctuation and

vocabulary? . The output [link] was then modified further to better represent my tone

and style of writing.

2. Copies of the work before and after using the AI tools C see above for links in

the acknowledgement.

3. The output produced by AI tools is non-deterministic (i.e., another person

cannot obtain the same information as you did); thus, citing AI tools is not a

source and is inappropriate for an assignment.

Assessment Criteria

The individual assignment weighting equals 25% of your final grade.

General explanation of standards: Please refer to the grade descriptors located on

Canvas. These grade descriptors are used to construct marking schemes for all

assessment items.

INFS6071: Individual Assignment 1, S2-2024

6

Marking criteria:

Individual Assignment One

Criteria Marks allocated

Part A: Critical Path Analysis

Marks for (a) of the assignment are awarded for the diagram's

design and the answer's correctness.

Marks for (b) are awarded in the context of the project, how you

explain key challenges in managing a project using its critical path.

5

Part B: Case Study

Content, knowledge, and originality of analysis

Demonstrates detailed knowledge of the topic and awareness of a

variety of ideas/contexts based on a wide range of sources that

have been thoroughly analysed, applied, and discussed.

Application and integration of appropriate project management

knowledge, innovative, and insightful, with an appreciation of

disciplinary gaps, limitations, and inconsistencies shown in key

areas of the discussion. The analysis is original and can develop

and justify students' ideas.

8

Critical thinking and reasoning

Analytical and clear conclusion provided that is well-grounded in

project management theory and the literature. A critical review of

evidence supports the development of the recommendations and

their significance from a project management perspective,

including contradictory information/gaps identified and reasons for

contradictions/limitations.

6

Information literacy/Use of Literature

Relevant and innovative choices of information sources,

demonstrating well-designed search strategies.

An upper limit of ten (10) references (both industry [grey] and

academic) is recommended.

3

Communication and professional presentation (written)

Communicates meaning competently; in own words, structuring and

organising ideas logically, clearly, concisely, and cohesively. The

purpose of the assignment is addressed comprehensively and

imaginatively. Appropriate referencing and referencing style used

(APA 7th). Fluent writing style appropriate to report. Grammar and

spelling are accurate.

Conforms with instructions (e.g., word length).

3

热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图