代做COMP9334、Python/Java程序设计代写
COMP9334 Project, Term 1, 2024:
Computing clusters
Due Date: 5:00pm Friday 19 April 2024
Version 1.01
Updates to the project, including any corrections and clarifications, will be posted on the
course website. Make sure that you check the course website regularly for updates.
Change log
• Version 1.01 (27 March 2024). There is a mistake in the denominators of the two probability
density functions in Section 5.1.1. For g0(t), it should be t raised to the power of η0+1 where
the +1 was missing. A similar error appeared in g1(t), it should be t raised to the power of
η1+1.
• Version 1.00. Issued on 19 March 2024.
1 Introduction and learning objectives
You have learnt in Week 4A’s lecture that a high variability of inter-arrival times or service times
can cause a high response time. Measurements from real computer clusters have found that the
service times in these clusters have very high variability [1]. The reference paper [1] also has a
number of suggestions to deal with this issue. One suggestion is to separate the jobs according
to their service time requirements, and have one set of servers processing jobs with short service
times and another set of servers for jobs with long service times. This arrangement is the same
as supermarkets having express checkouts for customers buying not more than a certain number
of items and other checkouts that do not have a limit on the number of items. You had seen this
theory in action in Week 4A’s revision Problem 1. We also highly recommend you to read the
paper [1].
In this project, you will use simulation to study how to reduce the response time of a server
farm that uses different servers to process jobs with different service time requirements.
In this project, you will learn:
1. To use discrete event simulation to simulate a computer system
2. To use simulation to solve a design problem
3. To use statistically sound methods to analyse simulation outputs
We mentioned a number of times in the lectures that simulation is not simply about writing
simulation programs. While it is important to get your simulation code correct, it is also important
that you use statistically sound methods to analyse simulation outputs. There, roughly half of
the marks of this project is allocated to the simulation program, and the other half to statistical
analysis; see Section 7.2.
1
Server 0
Server n - 1
New jobs
submitted
by users
Dispatcher



Queue 0 ↓
Queue 1 ↑
Jobs that have completed
their processing will
depart the system
permanently
Jobs that are killed are
sent back
to the dispatcher
Jobs killed by servers in
Group 0
Server n0
Server n0 - 1



Jobs that have completed
their processing will
depart the system
permanently
Group 0 →
Group 1 →
Figure 1: The multi-server system for this project.
2 Support provided and computing resources
If you have problems doing this project, you can post your question on the course forum. We
strongly encourage you to do this as asking questions and trying to answer them is a
great way to learn. Do not be afraid that your question may appear to be silly, the
other students may very well have the same question! Please note that if your forum post
shows part of your solution or code, you must mark that forum post private.
Another way to get help is to attend a consultation (see the Timetable section of the course
website for dates and times).
If you need computing resources to run your simulation program, you can do it on the VLAB
remote computing facility provided by the School. Information on VLAB is available here: https:
//taggi.cse.unsw.edu.au/Vlab/
3 Multi-server system configuration with job isolation
The configuration of the multi-server system that you will use in this project is shown in Figure
1. The system consists of a dispatcher and n servers where n ≥ 2. The n servers are partitioned into 2 disjoint groups, called Groups 0 and 1, with at least one server in each group. The
number of servers in Groups 0 and 1 are, respectively, n0 and n1 where n0, n1 ≥ 1 and n0+n1 = n.
The servers in Group 0 are used to process short jobs which require a processing time of no
more than a time limit of Tlimit. The servers in Group 1 do not impose any limit on service time.
2
The dispatcher has two queues: Queue 0 and Queue 1. The jobs in Queue i (where i = 0, 1)
are destined for servers in Group i. Both queues have infinite queueing spaces.
When a user submits a job to this multi-server system, the user needs to indicate whether the
job is intended for the servers in Group 0 or Group 1. The following general processing steps are
common to all incoming jobs:
• If a job is intended for a server in Group i (where i = 0, 1) arrives at the dispatcher, the job
will be sent to a server in Group i if one is available, otherwise the job will join Queue i.
• When a job departs from a server in Group i, the server will check whether there is a job at
the head of Queue i. If yes, the job will be admitted to the available server for processing.
Recall that the servers in Group 0 have a service time limit. The intention is that the users
make an estimate of the service time requirement of their submitted jobs. If a user thinks that
their job should be able to complete within Tlimit, then they submit it to Group 0; otherwise, they
should send it to the Group 1.
Unfortunately, the service time estimated by the users is not always correct. It is possible that
a user sends a job which cannot be completed within the time limit to Group 0. We will now
explain how the multi-server system will process such a job. Since the user has indicated that the
job is destined for Group 0, the job will be processed according to the general processing steps
explained earlier. This means the job will receive processing by a server in Group 0. After this
job has been processed for a time of Tlimit, the server says that the service time limit is up and
will kill the job. The server will send the job to the dispatcher and tell it that this is a killed job.
The dispatcher will check whether a server in Group 1 is available. If yes, the job will be send to
an available server; otherwise, it will join Queue 1 to wait for a server to become available. When
a server in Group 1 is available to work on this job, it will process the job from the beginning,
i.e., all the previous processing in a Group 0 server is lost.
If a job has completed its processing at a Group 0 server, which means its service time is less
than or equal to Tlimit, then the job leaves the multi-server system permanently. Similarly, a job
completed its processing at a Group 1 server will leave the system permanently.
We make the following assumptions on the multi-server system in Figure 1. First, it takes
the dispatcher negligible time to classify a job and to send a job to an available server. Second,
it takes a negligible time for a server to send a killed job to the dispatcher. Third, it takes a
negligible time for a server to inform the dispatcher on its availability. As a consequence of these
assumptions, it means that: (1) If a job arriving at the dispatcher is to be sent to an available
server right away, then its arrival time at the dispatcher is the same as its arrival time at the
chosen server; (2) The departure time of a job from the dispatcher is the same as its arrival time
at the chosen server; and (3) The departure time of a killed job from a server is the same as its
arrival time at the dispatcher. Ultimately, these assumptions imply that the response time of the
system depends only on the queues and the servers.
We have now completed our description of the operation of the system in Figure 1. We will
provide a number of numerical examples to further explain its operation in Section 4.
You will see from the numerical examples in Section 4 that the number of Group 0 servers n0
can be used to influence the mean response time. So, a design problem that you will consider in
this project is to determine the value of n0 to minimise the mean response time.
Remark 1 Some elements in the above description are realistic but some are not. Typically,
users are required to specify a walltime as a service time limit when they submit their jobs to a
computing cluster. If a server has already spent the specified walltime on the job, then the server
3
will kill the job. All these are realistic.
The re-circulation of a killed job is normally not done. A user will typically have to resubmit
a new job if it has been killed. If a killed job is re-circulated, then it may be given a lower priority,
rather than joining the main queue which is the case here.
Some programming technique (e.g., checkpointing) allows a killed job or crashed job to resurrect from the last state saved rather than from the beginning. However, that may require a sizeable
memory space.
In order to make this project more do-able, we have simplified many of the settings. For
example, we do not use lower priority for the re-circulated killed jobs.
4 Examples
We will now present three examples to illustrate the operation of the system that you will simulate
in this project. In all these examples, we assume that the system is initially empty.
4.1 Example 0: n = 3, n0 = 1, n1 = 2 and Tlimit = 3
In this example, we assume the there are n = 3 servers in the farm with 1 (= n0) server in Group
0 and 2 (= n1) servers in Group 1. The time limit for Group 0 processing is Tlimit = 3.
Table 1 shows the attributes of the 8 jobs that we will use in this example. Each job is given
an index (from 0 to 7). For each job, Table 1 shows its arrival time, service time and the server
group that the user has indicated. For example, Job 1 arrives at time 10, requires 4 units of time
for service and the user has indicated that this job needs to go to a Group 0 server. Since the
service time requirement for this job exceeds the time limit Tlimit of 3, this job will be killed after
3 time units of service and will be sent to dispatcher after that.
Note that, a job which a user sends to a Group 0 server will be completed if its service time
is less than or equal to the service time limit Tlimit being imposed. So, Job 6 in Table 1 will be
completed in a Group 0 server and this job will not be killed.
Job index Arrival time Service time required Server group indicated
0 2 5 1
1 10 4 0
2 11 9 0
3 12 2 0
4 14 8 1
5 15 5 0
6 19 3 0
7 20 6 1
Table 1: Jobs for Example 0.
Remark 2 We remark that the job indices are not necessary for carrying out the discrete event
simulation. We have included the job index to make it easier to refer to a job in our description
below.
The events in the system in Figure 1 are
• The arrival of a new job to the dispatcher; and,
4
• The departure of a job from a server.
We remark that for a Group 1 server, a departed job has its service completed. However, for
a Group 0 server, a departed job can be a killed job or a completed job. Note that we have not
included the arrival of a re-circulated killed job to the dispatcher as an event. This is because the
arrival of a re-circulated job at the dispatcher is at the same time as the departure of that job
from a Group 0 server. So the simulation will handle these events together: the departure of a
killed job and its handling by the dispatcher.
We will illustrate the simulation of the system in Figure 1 using “on-paper simulation”. The
quantities that you need to keep track of include:
• Next arrival time is the time that the next new job (i.e, not a killed job) will arrive
• For each server, we keep track its server status, which can be busy or idle.
• We also keep track of the following information on the job that is being processed in the
server:
– Next departure time is the time at which the job will depart from the server. If the
server is idle, the next departure time is set to ∞. Note that there is a next departure
time for each server.
– The time that this job arrived at the system. This is needed for calculating the response
time of the job when it permanently departs from the system.
• The contents of Queues 0 and 1. Each job in the queue is identified by a 2-tuple of (arrival
time, service time).
There are other additional quantities that you will need to keep track of and they will be
mentioned later on.
The “on-paper simulation” is shown in Table 2. The notes in the last column explain what
updates you need to do for each event. Recall that the two event types in this simulation are the
arrival of a new job to the dispatcher and the departure from a server, we will simply refer to
these two events as Arrival and Departure in the “Event type” column (i.e., second column) in
Table 2.
5
Master
clock
Event
type
Next
arrival
time
Server 0
Group 0
Server 1
Group 1
Server 2
Group 1
Queue 0 Queue 1 Notes
0 – 2 Idle, ∞ Idle, ∞ Idle, ∞ – – We assume the servers are idle and queues are empty at the start
of the simulation. The next departure times for all servers are
∞. The “–” indicates that the queues are empty.
2 Arrival 10 Idle, ∞ Busy,
(2,7)
Idle, ∞ – – This event is the arrival of Job 0 for a Group 1 server. Since both
Group 1 servers are idle before this arrival, the job can be sent
to any one of the idle servers. We have chosen to send this job to
Server 1. The job requires a service time of 5, so its completion
time is 7. Note that the record of the job in the server is a 2-tuple
consisting of (arrival time, scheduled departure time). Lastly, we
need to update the arrival time of the next job, which is 10.
7 Departure 10 Idle, ∞ Idle, ∞ Idle, ∞ – – This event is the departure of a job from Server 1. Since Queue
1 is empty, Server 1 becomes idle.
10 Arrival 11 Busy
(10,13, 4)
Idle, ∞ Idle, ∞ – – This event is the arrival of Job 1 for a Group 0 server. Since
Server 0 is idle, the job can be sent to the idle server. This job
requires a service time of 4 which exceeds the service time limit
of 3 for Group 0 servers, so the simulation needs to schedule this
job to depart Server 0 at time 13 because this is the time that this
job will be killed by the server. We use the 3-tuple consisting of
(arrival time, scheduled departure time, service time), which for
this job is (10, 13, 4), to indicate that this job arrives at time 10,
is scheduled to depart at time 13 and its service time requirement
is 4 time units. We need to include the service time of the job
because we will need it later when the job is re-circulated to a
Group 1 server. Note that if you see a 3-tuple job in a Group 0
server, it means that the job will be killed and re-circulated to
a Group 1 server. Lastly, we need to update the arrival time of
the next job, which is 11.
6
11 Arrival 12 Busy
(10,13, 4)
Idle,
∞ Idle,
∞ (11,9)
– This event is the arrival of Job 2 for a Group 0 server. Since
Server 0 is busy, this job will join Queue 0. The queue stores the
2-tuple (arrival time, service time) which is (11,9) for this job.
We also need to update the arrival time of the next job, which
is 12.
12 Arrival 14 Busy
(10,13, 4)
Idle,
∞ Idle,
∞ (11,9),
(12,2)
– This event is the arrival of Job 3 for a Group 0 server. Since
Server 0 is busy, this job will join Queue 0 with the job information (12,2). We also need to update the arrival time of the next
job, which is 14.
13 Departure 14 Busy
(11,16, 9)
Busy
(10,17)
Idle,
∞ (12,2)
– This event is the departure of a killed job from Server 0. This
job will be re-circulated to the dispatcher. Since both Group 1
servers are idle, this job can go to any one of them. We have
chosen to send it to Server 1. Since this job requires 4 time units
of service, it is scheduled to depart Server 1 at time 17. The 2-
tuple (10,17) indicates that this job arrives at 10 and will depart
at time 17. Since this is a departure from a Group 0 server, we
will also need to check Queue 0, which has 2 jobs. So the job at
the head of the queue will advance to Server 0 which is becoming
available. This job requires 9 units of service time which exceeds
the service time limit. So, the job will be killed at time 13 + 3
= 16 time units.
14 Arrival 15 Busy
(11,16, 9)
Busy
(10,17)
Busy
(14,22)
(12,2)
– This event is the arrival of Job 4 for a Group 1 server. Since there
is a Group 1 server available, this job goes to Server 2 directly.
This job requires 8 units of service, so the job is scheduled to
depart at time 22. We also need to update the arrival time of
the next job, which is 15.
15 Arrival 19 Busy
(11,16, 9)
Busy
(10,17)
Busy
(14,22)
(12,2)
(15,5)
– This event is the arrival of Job 5 for a Group 0 server. Since all
Group 0 servers are busy, this job joins Queue 0. We also need
to update the arrival time of the next job, which is 19.
7
16 Departure 19 Busy
(12,18)
Busy
(10,17)
Busy
(14,22)
(15,5) (11, 9) This event is the departure of a killed job from Server 0. This
job will be re-circulated to the dispatcher. Since both Group 1
servers are busy, this job will join Queue 1. The job at the head
of Queue 0 will advance to Server 0. This job requires only 2
units of service which is within the limit. We use a 2-tuple to
remember this job because the job is within the time limit so it
will not be killed.
17 Departure 19 Busy
(12,18)
Busy
(11, 26)
Busy
(14,22)
(15,5) - This event is the departure of a finished job at Server 1. Since
there is a job in Queue 1, the job will move into Server 1.
18 Departure 19 Busy
(15,21,5)
Busy
(11, 26)
Busy
(14,22)
- - This event is the departure of a finished job at Server 0. This
job will depart from the system permanently. We can tell that
because it is a 2-tuple in the server rather than a 3-tuple. Since
there is a job in Queue 0, the job will move into Server 0.
19 Arrival 20 Busy
(15,21,5)
Busy
(11, 26)
Busy
(14,22)
(19,3) - This event is the arrival of Job 6 for a Group 0 server. Since all
Group 0 servers are busy, this job joins Queue 0. We also need
to update the arrival time of the next job, which is 20.
20 Arrival
∞ Busy
(15,21,5)
Busy
(11, 26)
Busy
(14,22)
(19,3) (20, 6) This event is the arrival of Job 7 for a Group 1 server. Since all
Group 1 servers are busy, this job joins Queue 1. Since there are
no more jobs arriving, we update the next arrival time to

21 Departure
∞ Busy
(19,24)
Busy
(11, 26)
Busy
(14,22)
- (20,6),
(15,5)
This event is the departure of a killed job from Server 0. This
job will be re-circulated to the dispatcher. Since both Group 1
servers are busy, this job will join Queue 1. The job at the head
of Queue 0 will advance to Server 0. This job requires only 3
units of service which is within the limit. We only need a 2-tuple
to remember that this job arrives at time 19 and will depart at
time 24.
22 Departure
∞ Busy
(19,24)
Busy
(11, 26)
Busy
(20, 28)
- (15,5) This event is the departure of a finished job at Server 2. Since
there is a job in Queue 1, the job will move into Server 2.
24 Departure
∞ Idle,
∞ Busy
(11, 26)
Busy
(20, 28)
- (15,5) This event is the departure of a finished job at Server 0. Since
Queue 0 is empty, Server 0 is now idle.
26 Departure
∞ Idle,
∞ Busy
(15, 31)
Busy
(20, 28)
- - This event is the departure of a finished job at Server 1. The job
at the head of Queue 1 advances to Server 1. The queue is now
empty.
8
28 Departure ∞ Idle, ∞ Busy
(15, 31)
Idle, ∞ - - This event is the departure of a finished job at Server 2. Server
2 is now idle as Queue 1 is empty.
31 Departure ∞ Idle, ∞ Idle, ∞ Idle, ∞ - - This event is the departure of a finished job at Server 1. Server
1 is now idle as Queue 1 is empty.
Table 2: “On paper simulation” illustrating the event updates of
the system.
9
The above description has not explained what happens if an arrival event and a departure
event are at the same time. We will leave it unspecified. If we ask you to simulate in trace driven
mode, we will ensure that such situation will not occur. If the inter-arrival time and service time
are generated randomly, the chance of this situation occurring is practically zero so you do not
have to worry about it.
Table 3 summarises the arrival, departure, job classification and response times of the jobs in
this example. In the table, we classify the jobs into 3 types:
• Group 0 jobs that are completed (i.e., not killed) within the time limit. We will refer to
these jobs as completed Group 0 jobs from now on. These jobs are marked as 0.
• Group 0 jobs that are recirculated. They are marked as r0.
• Jobs that are indicated for Group 1 by the users. They are marked as 1.
In Table 3, we have included the response times for completed Group 0 jobs and Group 1 jobs.
The mean response time for completed Group 0 jobs is 11
2 = 5.5 and the mean response time for
Group 1 jobs is 21
3 = 7.
Later on, you will work on a design problem to reduce a weighted sum of the mean response
times of the completed Group 0 jobs and the Group 1 jobs. Here we have purposely neglected
the re-circulated jobs because we will not attempt to reduce their response time. The reason is
that we do not want to incentivise users to give poor estimation of the service time requirement
of their jobs.
Job Arrival time Departure time Job classification Response time
Group 0 within limit Group 1
0 2 7 1 5
1 10 17 r0
2 11 26 r0
3 12 18 0 6
4 14 22 1 8
5 15 31 r0
6 19 24 0 5
7 20 28 1 8
Table 3: The arrival and departure times of the jobs in Example 0.
10
4.2 Example 1: n = 4, n0 = 2, n1 = 2 and Tlimit = 3.5
For this example, we assume that the system has n = 4 servers. Both Groups 0 and 1 have 2
servers each, i.e., n0 = n1 = 2. The service time-limit for Group 0 server is Tlimit = 3.5.
Table 4 shows the attributes of the jobs which will arrive at this system. Table 5 summaries the
results of the simulation. The mean response time of the completed Group 0 jobs is 23.9
4 = 5.975
and the mean response time of the Group 1 jobs is 36.8
5 = 7.36.
Job index Arrival time Service time required Server group indicated
0 2.1 5.2 1
1 3.4 4.1 1
2 4.1 3.1 0
3 4.4 3.9 0
4 4.5 3.4 0
5 4.7 4.4 1
6 5.5 4.7 1
7 5.9 4.1 0
8 6.0 2.5 0
9 6.5 8.6 1
10 7.6 4.1 0
11 8.1 2.6 0
Table 4: Jobs for Example 1.
Job Arrival time Departure time Job classification Response time
Group 0 within limit Group 1
0 2.1 7.3 1 5.2
1 3.4 7.5 1 4.1
2 4.1 7.2 0 3.1
3 4.4 16.1 r0
4 4.5 10.6 0 6.1
5 4.7 11.7 1 7.0
6 5.5 12.2 1 6.7
7 5.9 20.2 r0
8 6.0 13.1 0 7.1
9 6.5 20.3 1 13.8
10 7.6 24.3 r0
11 8.1 15.7 0 7.6
Table 5: The arrival and departure times of the jobs in Example 1.
11
4.3 Example 2: n = 4, n0 = 1, n1 = 3 and Tlimit = 3.5
This example is identical to Example 1 except that n0 = 1. Table 6 summaries the results of the
simulation. The mean response time of the completed Group 0 jobs is 44.9
4 = 11.225 and the mean
response time of the Group 1 jobs is 29.8
5 = 5.96. It is not surprising that the mean response time
of the completed Group 0 jobs has gone up while that of Group 1 jobs has gone down. This is
because in this example, there are fewer servers in Group 0.
Job Arrival time Departure time Job classification Response time
Group 0 within limit Group 1
0 2.1 7.3 1 5.2
1 3.4 7.5 1 4.1
2 4.1 7.2 0 3.1
3 4.4 14.6 r0
4 4.5 14.1 0 9.6
5 4.7 9.1 1 4.4
6 5.5 12.0 1 6.5
7 5.9 21.7 r0
8 6.0 20.1 0 14.1
9 6.5 16.1 1 9.6
10 7.6 27.7 r0
11 8.1 26.2 0 18.1
Table 6: The arrival and departure times of the jobs in Example 2.
12
5 Project description
This project consists of two main parts. The first part is to develop a simulation program for the
system in Figure 1. The system has already been described in Section 3 and illustrated in Section
4. In the second part, you will use the simulation program that you have developed to solve a
design problem.
5.1 Simulation program
You must write your simulation program in one (or a combination) of the following languages:
Python 3 (note: version 3 only), C, C++, or Java. All these languages are available on the CSE
system.
We will test your program on the CSE system so your submitted program must be able to
run on a CSE computer. Note that it is possible that due to version and/or operating system
differences, code that runs on your own computer may not work on the CSE system. It is your
responsibility to ensure that your code works on the CSE system.
Note that our description uses the following variable names:
1. A variable mode of string type. This variable is to control whether your program will run
simulation using randomly generated arrival times and service times; or in trace driven mode.
The value that the parameter mode can take is either random or trace.
2. A variable time_end which stops the simulation if the master clock exceeds this value. This
variable is only relevant when mode is random. This variable is a positive floating point
number.
Note that your simulation program must be a general program which allows different parameter values to be used. When we test your program, we will vary the parameter values. You can
assume that we will only use valid inputs for testing.
For the simulation, you can always assume that the system is empty initially.
Hint: Do not write two separate programs for the random and trace modes because they share
a lot in common. A few if–else statements at the right places are what you need to have both
modes in one program.
5.1.1 The random mode
When your simulation is working in the random mode, it will generate the inter-arrival times
and the workload of a job in the following manner.
1. We use {a1, a2, . . . , ak, . . . , ...} to denote the inter-arrival times of the jobs arriving at the
dispatcher. These inter-arrival times have the following properties:
(a) Each ak is the product of two random numbers a1k and a2k, i.e ak = a1ka2k ∀k = 1, 2, ...
(b) The sequence a1k is exponentially distributed with a mean arrival rate λ requests/s.
(c) The sequence a2k is uniformly distributed in the interval [a2l
, a2u].
Note: The easiest way to generate the inter-arrival times is to multiply an exponentially
distributed random number with the given rate and a uniformly distributed random number
in the given range. It would be more difficult to use the inverse transform method in this
case, though it is doable.
13
2. The workload of a job is characterised by two attributes: the server group (i.e., Group 0 or
1) that the job is to be sent to, and the service time of the job.
(a) The first step to determine which server group to send the job to. This decision is made
by a parameter p0 ∈ (0, 1):
• Prob[a job is indicated by the user for a Group 0 server] = p0
• Prob[a job is indicated by the user for a Group 1 server] = 1 − p0
For example, if p0 is 0.8, then there is a probability of 0.8 that a job is indicated for a
Group 0 server and a probability of 0.2 for a Group 1 server. The server group for each
job is independently generated.
(b) Once the server group for a job has been generated, the next step is to generate its
service time. The service time distribution to be used depends on the server group.
i. If a job is indicated to go to a Group 0 server, its service time has the probability
density function (PDF) g0(t):
g0(t) =



0 for 0 ≤ t ≤ α0
η0
γ0 t
η0+1 for α0 < t < β0
0 for t ≥ β0
(1)
where
γ0 = α
−η0
0 − β
−η0
0
Note that this probability density function has 3 parameters: α0, β0 and η0. You
can assume that β0 > α0 > 0 and η0 > 1.
ii. If a job is indicated to go to a Group 1 server, its service time has PDF:
g1(t) = (
0 for 0 ≤ t ≤ α1
η1
γ1 t
η1+1 for α1 < t (2)
where
γ1 = α
−η1
1
Note that this probability density function has 2 parameters: α1 and η1. You can
assume that α1 > 0 and η1 > 1.
5.1.2 The trace mode
When your simulation is working in the trace mode, it will read the list of inter-arrival times,
the list of service times and server groups from two separate ASCII files. We will explain the
format of these files in Sections 6.1.3 and 6.1.4.
An important requirement for the trace mode is that your program is required to simulate
until all jobs have departed from the system. You can refer to Table 2 for an illustration.
5.2 Determining the value of n0 that minimises a weighted mean response time
After writing your simulation program, your next step is to use your simulation program to determine the number of Group 0 servers n0 that minimises a weighted mean response time.
For this design problem, you will assume the following parameter values:
14
• Total number of servers: n = 10
• The service time limit Tlimit for Group 0 servers is 3.3.
• For inter-arrival times: λ = 3.1, a2ℓ = 0.85, a2u = 1.21
• The probability p0 that a job is indicated for a Group 0 server is 0.74.
• The service time for a job which is indicated for Group 0: α0 = 0.5, β0 = 5.7, η0 = 1.9.
• The service time for a job which is indicated for Group 1: α1 = 2.7 and η1 = 2.5.
The aim of the design problem is to minimise the weighted response time:
w0T0 + w1T1 (3)
where T0 is the mean response time of the completed Group 0 jobs and T1 is the mean response
time of Group 1 jobs. The value of the weights w0 and w1 are fixed for this design problem, and
they are given by 0.83 and 0.059 respectively. As an example, if T0 = 1.86 and T1 = 56.7, then the
weighted mean response time is 0.83 × 1.86 + 0.059 × 56.7. The rationale behind choosing these
weights is explained in Remark 3.
The aim of the design problem is to find the value of n0 to minimise this weighted response
time. Note that we assume that there is at least a server in each group, therefore 1 ≤ n0 ≤ n − 1.
In solving this design problem, you need to ensure that you use statistically sound methods
to compare systems. You will need to consider simulation controls such as length of simulation,
number of replications, transient removals and so on. You will need to justify in your report on
how you determine the value of n0.
Remark 3 For the parameters above, out of all the jobs that are not re-circulated, 73.65% are
Group 0 jobs within the time limit and 26.35% are Group 1 jobs. The average service time for
Group 0 jobs within the time limit is 0.887 and that for Group 1 jobs is 4.5. The weights w0
and w1 are computed, respectively, from 0.7365
0.887 and 0.2635
4.5
. So the weights take into account the
frequency of a class of jobs. We also use the inverse service time as a weight so that we are not
giving too much advantage to Class 1 jobs as they have large service time requirement.
6 Testing your simulation program
In order for us to test the correctness of your simulation program, we will run your program using
a number of test cases. The aim of this section is to describe the expected input/output file format
and how the testing will be performed.
Each test is specified by 4 configurations files. We will index the tests from 0. If 12 tests are
used, then the indices for the tests are 0, 1, 2, ...., 11. The names of the configuration files are:
• For Test 0, the configuration files are mode_0.txt, para_0.txt, interarrival_0.txt and
service_0.txt. The f

热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图