Laboratory 1

1 Objective:

In this session, you will practice in analyzing a transmission expansion plan in a simple power system and learn how to analyze the effects of new transmission lines on the power system operation in a market environment.

You will learn important concepts on market operation mechanism and transmission planning. You will also practice skills on system analysis methods. The capabilities to work in a group on a systematic project and present the results in a clear and concise manner are also very important.

2 Lab Instructions:

In this lab, you will be grouped to work on a market design and a transmission plan in a simple power system. Assume there are two independent power systems A & B. The supply function for System A is:

πA  = MCA  = 12 + 0.02PA ($/Mwh)

and the supply function for System B is:

πB  = MCB  = 15 + 0.01PB  ($/Mwh)

Scenario 1: Both system A & B are operated separately. The inverse demand function for system A is

πLA  = 20 - 0.03PLA  ($/Mwh)

The inverse demand function for system B is

πLB  = 27 - 0.02PLB  ($/Mwh)

Analyze the electricity price, revenue of generating plants from the sale of the electrical energy and the payments made by a group of consumers for the purchase of the electrical energy in each market; Find the total revenue of generators and total payments of consumers for this two-area system. Analyze the results. Draw the supply curve and demand curve of each system separately. Analyze how the separated markets might affect the consumers and use the diagrams to assist your analysis when appropriate.

Scenario 2: System A has a fixed load 100 MW and System B has a fixed load 500MW. The supply functions of generators in both areas are the same as Scenario 1. They are considering building a transmission line to connect them so that they can support the energy supply to each other. The planned transmission capacity between these two systems will be 300MW  (N-1 criterion has been checked).  Analyze qualitatively what this transmission corridor will bring to the markets. Analyze the feasibilities of the unit commitment plan that all loads are supplied by generators of a single area. Find the right supply pattern under the market operational mechanism, including the production in each area, the power transferred through the transmission corridor, the market price, revenue of generating plants from the sale of the electrical energy and the payments made by a group of consumers for the purchase of the electrical energy in each market and the total revenue of generators  and  total payments of consumers for this two-area system. Keep the electricity demands in this scenario but if this new transmission line is not built, then solve the market prices in area A and area B, the payments made by the load and the revenue collected by the generating companies. Analyze the effects of building this transmission corridor on the market operation. Use diagrams of supply and demand curves to  assist your analysis when appropriate.

Scenario 3: Both System A and System B are considering to build a transmission line so that they can be connected. However, the planned transmission capacity between these two systems will  be 100MW (N-1 criterion has been checked). Redo the analysis in Scenario 2 and discuss the effects of building this transmission corridor.

Scenario 4: Now extend the analysis in the scenarios 2&3 and draw the curves of the market prices of System A and System B, the total revenues of generators and the total payments of consumers in this two-area system with respect to the transmission capacity of the newly built transmission line using Matlab. Analyze the effects of the transmission capacity on the market price and the surplus between the revenues and the payments.

Scenario 5: In the above analysis, the transmission line loss is neglected. If we assume the power transferred on the newly built transmission line is ptie, and the transmission line is not constrained, the network loss can be approximated by

ΔP = 0.1ptie

Draw the total generation cost of this two-area system with respect to ptie using Matlab for both scenarios where the transmission line loss is neglected and considered. (In the case of considering the transmission line loss, assume the transmission line loss is equally shared by generators in both areas.) Find the optimal operation point in both cases and analyze the effects of transmission line power loss on the total generation cost. Discuss the effects of the transmission line power loss on the market  price. Then use the conclusion derived to find the market prices of System A & B  when the power flowing through the intertie is  100MW. Analyze and compare the  results with the earlier work for Scenario 3.





热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图