代做ENGY7002 Energy and Development, Semester 1, 2025代写数据结构语言

ENGY7002 Energy and Development, Semester 1, 2025

Group Project: Community Energy Proposal

Weighting: 40% of your total mark.

Assessment Criteria: See supporting marking rubric.

Due Date: 24 March 2025, 4pm (Brisbane time)

Your community:

Student teams will develop a proposed energy solution for a remote Queensland community to transition away from diesel power generation to a renewable energy system as part of Ergon Energy’s Isolated Networks Strategy.

Communities to choose from:

•    Waiben, Thursday Island

•     Mer, Murray Island

•     Masig, Yorke Island

•     Gununa, Mornington Island

•     Palm Island

•     Mapoon

•     Doomadgee

The report:

Teams will prepare a report detailing their proposal, with the audience being key community stakeholders and Ergon Energy.  The report should include an assessment of appropriateness of your chosen energy solution, proposed business model and the wider community impacts.

Your submission must use the frameworks and tools discussed in the intensive modules to consider the local context, develop an appropriate energy solution and detail the implementation strategy.

Your report should include:

•     Executive Summary (1 page).

•     Introduction and context (1 page)

•     Proposed energy solution (1 page)

Stakeholder identification and assessment: identification of key stakeholders to be engaged, their positions and their contact details; along with an assessment of their power and influence (2 pages)

•    Assessment of community context (particularly relating to energy needs) using the:

Energy Service Cascade (2 pages)

Sustainable Livelihood Framework (2 pages)

Appropriate technology assessment: Demonstration of appropriateness of the proposed energy system using comparative analysis from developed criteria relevant to the community (2 pages).

Business Model: Proposed implementation articulated through the Business Model Canvas for the specific community context (2 pages)

Communications and Engagement Plan: Details of planned activities that would take place during the lifecycle of the proposed project pertaining to relevant stakeholders (2 pages)

Conclusions and recommendations (1 page)

•     References (≥1 page)

Division of responsibilities:

For teams of 5 members, all 5 of the frameworks must be included in the submission - one per team member. For groups of 4, either the Energy Service Cascade or the Sustainable Livelihoods Cascade may be omitted. See the table below for clarification:

Responsibility

Team of 5

Team of 4

All team members

Executive Summary

Introduction and context.

Proposed energy solution.

Stakeholder identification and assessment.

Conclusions and recommendations

Executive Summary

Introduction and context.

Proposed energy solution.

Stakeholder identification and assessment.

Conclusions and recommendations

Team member 1

Energy Service Cascade

Energy Service Cascade OR

Sustainable Livelihoods Framework

Team member 2

Sustainable Livelihoods Framework

Appropriate Technology

Team member 3

Appropriate Technology

Business Model

Team member 4

Business Model

Communications and Engagement Plan

Team member 5

Communications and Engagement Plan

The marking rubric is designed to assess both individual and group components. Individually, each group member must be responsible for use of one of the frameworks and marked accordingly. Additionally, a proportion of the mark is allocated to the group sections of the report and ability to write a coherent proposal. See the rubric for clarification of how marks will be awarded.

A table indicating which team member completed which section of the report, must be included in the appendix. The appendix may also be used to include additional details to support the main body of report.




热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图