INFO6007 ASSESSMENT GUIDE

1.  KEY ASSESSMENTS

These are the key assessments for INFO6007 during Semester 2, 2024 which are given below:

Assessment Component

Team-Based?

Weight

Due

Knowledge Test

No

15%

Week 7

Group Project

Yes

30%

Week 10

Presentation

Yes

5%

Week 11 & 12

Final Exam

No

50%

Exam Period

2.  SUBMISSION INSTRUCTIONS

The submission instructions for the assessments are given below. Please ensure that yu to follow the guidelines before submitting the assessments to avoid being penalized.

a)    All the assignments are to be submitted online via the Turnitin submission portalon Canvas. No printouts of the assignments should be submitted.

b)    Only  one  team  member  from  each  group  should  submit  the  assignment  online.   If  you experience any difficulty in submitting your work, please let your tutor know immediately

c)    Late assignment submissions will be penalized by a penalty of 5% per day of the total mark allocated for the assignment (if you need  more details or  need some sort of clarification please check with Lecturer or the teaching team).

d)    Individual contribution for group assignment may  be taken into consideration while marking the group assessments.

e)    Assessment files should be named in the following format before submission Format:    GroupNumber_INFO6007_AssessmentName_Sem2_2024     Example: Group1_INFO6007/INFO3333_GroupProject_Sem2_2024

3.  UNIVERSITY POLICY ON ACADEMIC DISHONESTYANDPLAGIARISM

The Faculty of Engineering views all forms of academic dishonesty, including plagiarism and recycling, very seriously. The University-wide policy on academic honesty is set out below.

Plagiarism means presenting another person’s ideas, findings or work as one’s own by copying or reproducing them without due acknowledgement of the source.

AI: Use of AI is not allowed

Recycling means the submission for assessment of one’s own work,or of work which is substantially the same, which has previously been counted towards the satisfactory completion of another unit of study, and credited towards a  university degree,  and where the examiner  has  not  been  informed  that the student has already received credit for that work.

Students who submit work containing significant portions that have been copied from other sources, including  published  works,  the  internet,  existing  programs,  works  previously  submitted  for  other awards  or  assessments,  or  the  work  of  other  students,  without  proper  acknowledgement  will  be penalized.

4.  KNOWLEDGE TEST (15%)

There will be a knowledge test conducted for this unit in week 7. It is a Canvas-based online test. The details of the format and coverage will be provided in lectures.

5.  GROUP PROJECT (30%)

5.1. TEAM STRUCTURE

Students are expected to form teams of 5 students per group for the group assignment by Week  1. All the group members must be in the same tutorial group.

5.2. PROJECT TOOLS

MS  Project software or similar software should be used  by your group project for INFO6007/INFO3333.

5.3. LEARNING GOALS

In this assessment you are expected to demonstrate your understanding of the following topics:

a)    Project Charter

b)    Project Scope

c)    Ability to perform a literature review/research

d)    Work Breakdown Structure

e)    Project Plan andTime

f)     Project Cost

g)    Project scheduledevelopment

h)   Time control processes

i)     Budgeting and cost baseline etc.

In addition to covering the learning topics, you are expected to demonstrate your leadership and effective teamwork skills and to provide self-assessment and peer review. Each group/team is expected to choose their IT project from the list of real-life project provided below or use/find any IT related project of the choice available elsewhere.

Real-life Projects list links

    https://www.transport.nsw.gov.au/projects

    https://www.cityofsydney.nsw.gov.au/building-new-infrastructure

    https://www.eralberta.ca/projects/

    https://www.development.vic.gov.au/projects?view=list

    https://www.freelancer.com.au/

    https://www.fiverr.com/

5.4. TASKS

Based on the information presented in the projects list links, prepare a proposed plan of action, which will ultimately result in a full detailed project plan. In this assignment you would need to cover at least the following :

a)    Project Charter Outline

     Create an outline of the Project Charter for the project case as specified in the marking criteria

     Project Time Line: 9 - 12 months

b)   Scope

     Provide a scope statement for the project case, and  milestones.

c)    Literature Review

     Conduct a literature review and identify the knowledge gaps

d)    Detailed Work Breakdown Structure (WBS)

     Prepare WBS for the project case which outlines first three levels of the structure only.

e)    Provide a brief description for each phase/work package and high-level  activity.  Detailed Project Schedule

     Construct a high-level visualization of project time management (e.g. Gantt chart) and provide an explanation of each milestone.

     Identify dependencies

f)    Cost Modeling

     Identify the type of costs for the project case.

     Outline the direct and indirect project cost etc.

g)    Communication Management

h)   Quality Management

i)     Risk Management

j)     Human Resource Management

k)    Procurement Management

5.5. PROJECT REQUIREMENTS & MARKS DISTRIBUTION (more details can be found in canvas in week 6)

Assessment Element

Sub-Elements

Weight

1.    Project Charter

•     Project details (Brief background and objectives)

•     Project deliverables (high level)

     Project cost (Total cost)

     Project time (Total time)

•     Roles and responsibilities of stakeholders. Each student act as astakeholder of the    project, e.g., CEO, CIO, Director of Human Resource, etc.

/10

2.    Scope

     Project scope statement

     Milestones

/10

3.    Literature Review/Market

Research

•     Appropriate literature selection

•     Identification of knowledge gaps

•     Analysis and consolidation

•     Summary of literature review

•     Citation (appropriate, extensive use)

/10

4.    Work Breakdown

Structure (3 level)

•     Work Packages/ Activities/Tasks

•     Provide a brief description of each of the activities, put in a table

format

/5

5.    Project Schedule/Time

Modeling

     Detailed schedule (Ganttchart)

•     Proper sequencing and task Dependencies

/5

6.    Cost Modeling

     Detailed budget table

•     Identify cost types and briefly describe them

     Detailed cost baseline

/10

7.    Communication

•     Communication plan, see the template provided on Canvas

/10

8.    Quality Management

•     Quality management plan, see the template provided on Canvas

/10

9.    Risk Management

•     A brief risk register, see the template provided on Canvas

/10

10.    Procurement

Management and Human Resources Management

     Plans

•     Resource allocation

•     Acquistions

/10

11.    Structure

•     Harvard referncing Style

•     Grammar and formatting

•     Number of pages: 28 - 33 pages including references

     Font Size: 11

/10

Total

/100

6.  Presentation(5%)

It will be agroup presentation and will be held in week 11 and 12. Each member from your group is

expected to present. Time Allocated for the presentation is 10 minutes per group + 5 minutes Q&A.

Presentation generally involves the following criteria. Further details would be provided by the lecturer.

a)    Contents of presentation

b)   Team communication during presentation

c)    Engaging the audience

d)   Confidence and ability to convince

e)    Q&A handling (if any)



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图