PMGT5205_2024S2

Professional Project Practice

PART B: A2 - Team Report (20% of course assessment)

6.    Project Network/ Schedule (10 Marks)

Notwithstanding your team’s inexperience, work through the steps below and develop a reasonable schedule for the Pacificano Markets project with your adjusted/ improved WBS from above.

a)    Further decompose the lowest level work packages in your adjusted/improved WBS into activities to show at least 15 activities.

b)   Arrange the lowest level activities into a logical execution order and identify the type of dependencies between them in tabular format.

c)    Present your interim work as a network diagram (without any durations) illustrating only the different logical dependencies – show an example of the 3 common types of dependencies.

d)    Identify who might be best placed to provide that information or estimate for each activity.

e)    Describe methods you would use to obtain an estimate of time/effort required for each activity.

f)     From the above considerations, make an estimate (i.e. educated guess) for the durations of these activities and determine an overall project schedule needed to deliver the project described.

g)    Identify which “network path” might be expected to have the longest duration explaining your reasoning/ answer and explaining what it represents.

7.    Estimate Project Budget (10 Marks)

Similar to and (ideally) together with the above schedule development, use the same packages/ activities of your WBS developed above and work through the following steps:

a)    Make a reasoned estimate of the personnel, materials and equipment / facilities required for each work package.

b)    From the above considerations, provide an initial estimate of (i.e. educated guess) of the overall project budget needed to execute the project described.

c)    Explain any assumptions and briefly describe how you came to the estimate.

d)    Finally, make a judgement on the confidence you have on the estimate and what level of contingency (as a percentage) you would advise the project use.

8.    Project Risks (10 Marks)

a)    Should it be approved, briefly describe how for the Pacificano Markets project team might go about identifying the major risks for this project and the process used to prioritise them and develop a response plan.

b)    Follow this process yourself to identify at least ten (10) of the most probable and/or highest impact project risks for the

project, ensuring that you have at least one for each Level-3 work package (not including Project Management).

c)    Show the overall risk assessment using a Red-Amber-Green (RAG) rating based on the Risk Matrix shown here.

d)    Describe how these risks could potentially impact/ affect the project and explain how you might manage these risks with   the appropriate risk treatment you would employ.

e)    Identify the Level-3 work package with the highest risk and  briefly explain how you would report it to Pacificano Mayor and what support you would ask for.

9.    Quality Management (10 Marks)

For each Level-2 work package (not including Project Management) and based on your understanding of the scenario:

a)    Identify two (2) non-functional requirements (a total of at least 10 NFRs) which would need to be clarified with key stakeholders as part of the requirements process.

b)    Pick any three (3) work packages and briefly describe:

•    The appropriate acceptance criteria for each with the Quality Control activity that would ensure that the deliverables are of a suitable standard.

•    What Quality Assurance process might be applied earlier in the project to increase the confidence that the appropriate standards could be met?

10. Procurement (10 Marks)

Pacificano has a wide bike path that connects key areas of the town and goes via the proposed market’s site. As the site is a little out of town and has no parking for visitors, the Mayor thinks it would be smart for the town to purchase a fleet of cargo/courier bikes for the community to use.

These are not ordinary bicycles and need to bee-bikes to support Pacificano’s sustainability goals as well, as being able to comfortably carry the produce (estimated at up to 10kgs) that customers purchase from the market stalls.

The project team is tasked with evaluating the different e-bikes that would suit Pacificano’s needs, and the Mayor has provided the following information to help you select the most suitable model:

•    The e-bike supplier should have a distributor and servicedepo in Australia

•    e-bike models should be compliant with Transport for NSW rules and regulations.

•    The e-bike model should be safe/suitable for commuting up to 4 kms.

•    The e-bikes should come with the necessary accessories (e.g. helmet, basket, etc.) and be included in the final costing.

•    The costing details should include ongoing maintenance costs.

•    The costing details should include provisions to maintain an ongoing inventory of 30 e-bikes, such as depreciation costs and replacement costs.

With the above input from the Mayor:

a)    identify and prioritise the key requirements and selection criteria for the cleaning equipment.

b)    Undertake market research on suitable e-bikes for Pacificano’ needs.

c)    Rate the top 3 candidate e-bikes using a Weighted Decision Matrix

d)    Provide your recommendations for a Gold, Silver or Bronze solution.

e)   Justify your team’s recommended e-bike(s) selection and identify nextsteps in the procurement process.





热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图