代写ENGY7117 Energy Markets, Law and Policy, Semester 2 2024调试数据库编程

ENGY7117 Energy Markets, Law and Policy, Semester 2 2024

Individual Written Assessment - Short Answer Responses

Weighting: 40% of your final grade.

Assessment Criteria: See supporting assessment Rubric.

Due Date: One (1) written document and one (1) supporting excel spreadsheet to be submitted by 11 November 2024, 4pm (Brisbane time) (Spreadsheet via Blackboard link, Written document via Turnitin)

Notes:

There is a total of 40 marks allocated to this assessment item.

These short-answer responses are an individual assessment. You will be graded on your own efforts. You are not permitted to work on this assessment item in groups.

The answers that you prepare should be all your own work.

You may discuss issues with the teaching staff via the Ed Discussion board.

You are expected to conduct some independent research to complete these answers.

The use of Artificial Intelligence is not permitted for this assessment item. In Accordance with UQ’s statement onAcademic Integrity and Student Conduct: “At UQ, the use of AI outputs without attribution, and contrary to any direction by teaching staff, is a form. of plagiarism and constitutes academic misconduct.”

The gross-pool electricity market model that was used in the intensive week market simulation game will be required for this assignment. You can download the model at Blackboard > ENGY7117 > Learning Resources > Guided Activity - Electricity Market Simulation Game PART 2.

You do not need to build new logic into the spreadsheet model to answer the questions in this assessment, but you will need to recalibrate inputs, repurpose some of the existing power generators and do some separate calculations to interpret the outputs.

FORMAT OF DELIVERABLE:

The first page will be a cover page with your name, student number and course code and declaration that this work is your own.

You may place your sources/references at the end of each question part OR as footnotes on each page OR as endnotes to the document. You may use any academic reference style, but please be consistent.

There is no specified length for your responses but they are SHORT answers. See the illustrative example to gauge the level of detail and length of your answers. Keep your answers focused to answer the specific question.

The spreadsheet that you submit should be saved with all of your calibrated values to reflect your answer to Question 1b.

What does a short answer look like?

Here is an example of what a short answer looks like to a hypothetical question to give you some guidance for the form. of your answers. You are not compelled to follow this format, but it contains the requisite elements such as explanations, referencing, presentation format and soon. The references, numbers and logic is not real – this short answer is only to show an illustrative format.

Question (eg): Display the current prices for European and USA gas prices in a table and explain one key factor which may explain any differences. List sources and include any assumptions or explanations of your data. Answer:

Natural Gas Product

Europe

(EUR/MWh) [1]

Europe

(USD/MMBTU)

USA

(USD/MMBTU) [2]

Spot Gas

36.5

11.23

2.90

2025 Forward

30.1

9.26

2.50

2026 Forward

25.20

7.75

2.40

Assumptions: Prices are presented for natural gas on spot markets and yearly forward markets. The USA gas price is for gas delivered at Henry Hub. The EUR gas price is for gas delivered at TTF (Title Transfer Facility). Prices exclude transport and taxes.

Conversions have been applied to present in common denomination, using 1 MWh = 3.412 MMBtU and exchange rate of 1.05 EUR/USD [3].

Explanation: On a like for like basis, natural gas in Europe sits at a prices far higher than the US at present and for a three year horizon based on forward prices. Gas supplies to Europe have been reduced with Russian pipelines curtailed owing to the Ukraine conflict [5], while the USA continues to see strong production levels of natural gas [6]. Being a fungible commodity, gas price differentials are explained by the expense of transport between the two regions and constraints on LNG shipments between the two trading zones [4], consistent with the Supply-Demand Framework.

[1] European Gas Exchangewww.egefake.comaccessed 1-Oct-2024

[2] Henry Gas Exchangewww.hgefake.comaccessed 1-Oct-2024

[3] Foreign Currency Exchangewww.fcefake.comaccessed 29-Sep-2024

[4] Poten & Partners, LNG Market Outlook, October 2022,https://www.poten.com/wp-content/uploads/2022/11/October-2022-LNGMO-European-LNG-Imports-Hit-Infrastructure- Constraints.pdf

[5] European Gas Today, “Putin Turns off the Taps”, January 2024,www.egtfake.com

[6] USA Gas Report, “Gas is Fracking Awesome”, June 2024,www.ugrfake.com

Question 1 (20 Marks)

This question will make reference to the simulation model for the gross pool FEM which was used in class demonstrations. You will also make comparison to Australia’s NEM which will require some independent research.

a.    You are informed that the Short Run Marginal Cost for Kerosene generators in the FEM is

$390/MWh and renewable generators have an SRMC of $0/MWh apart from dammed hydro which has a cost of water of $30/MWh. Fixed costs are all consistent with the version of the FEM model that you download.

Determine the typical Short Run Marginal Costs (in currentday AUD/MWh) for each of the four other power stations technologies if they were situated in the NEM today and present your findings in a table. Provide your sources and any assumptions.

You may optionally use some market intelligence which has found that Loy Yang power station has a contract with a local supplier to receive dried brown coal at $30/tonne (including royalties) with calorific value of 17 GJ/tonne.

(10 Marks)

b.    Use the following assumptions for your model:

-      Assume a :medium” demand day scenario, and

-      Assume generators offer with SRMC bidding, and

-      Assume generators all respect minimum load limitations, and

-      Assume all power stations are all online and variable-renewable power stations have “medium” levels of renewable resources.

Establish the pool price outcomes across the 24-hours of a day in the FEM, present your results in a suitably formatted chart and state the time-weighted average daily electricity price.

Prepare a table which displays the resultant capacity factor (in %) for each of the 11 generators.

(10 Marks) As a note, your performance on (b) is not judged on the numbers you derive in (a). That is, you can still get full marks on part (b) even if you have an error from conclusions in (a).

Save your spreadsheet in its final form, as you will load that spreadsheet as part of your submission to Blackboard for this assessment. The answers should all be contained in your written response – the spreadsheet is for markers to verify how you got to your answers if needed.

Question 2 (20 Marks)

For this scenario, the government is concerned with guiding the electricity system to lower carbon emissions. All of the power station costs and bidding strategies remain the same as your Question 1 responses so you should adapt your model from Q1 to answer this question.

For the coming year, forecasters have predicted that:

●    grid customers are likely to have a demand level at the “medium demand” scenario for every single day; and

●    all power stations will remain reliable and online; and

●    all power stations will offer into the market with SRMC bidding; and

●    the variable renewable generators will have available resources at the “low” scenario.

Several years ago, the owners of the brown coal generator G1 announced its closure date, and now there is only one year remaining of operations until it is shutdown and decommissioned. Their business holds no derivative contracts.

Ahead of schedule, the government has just completed the construction of a 550 MW nuclear small  modular reactor located beside the brown coal generator G1 but the grid transmission network only allows for one of the power stations to connect.

Note that even if the generator G1 closes early, the company still incurs its fixed costs (because they are paying back the costs of purchasing the power station overtime and the financiers still demand their loans to be repaid).

The small modular reactor has fixed costs of $50,000/hour and avariable cost of zero and a carbon intensity of zero and min load of 200 MW. The government plans to offer the SMR into the grid using SRMC bidding.

a.    If the brown coal generator G1 continues to generate as planned, what is the projected time- weighted average wholesale electricity spot price for the coming year?

(2 marks)

b.    If the brown coal generator G1 continues to generate as planned, what are the projected annual total carbon emissions from the grid in tonnes of CO2 for the coming year?

(2 marks)

c.    Suggest a fair compensation package for the government to offer the brown coal generator G1 to close down immediately. Explain your assumptions and methodology and calculations.

(4 marks)

d.    What will be the projected time weighted average electricity price for the coming year if the brown coal station G1 is closed down and the SMR operates instead?

(2 marks)

e.    Under the scenario that the brown coal station G1 is closed and the SMR operates instead, is the market price projected to move by a little,a moderate amount or a lot? Provide a paragraph to explain the sensitivity of the market price to the change in generator.

(2. marks)

f.     Under the scenario that the brown coal station G1 is closed and the SMR operates instead, what are the projected total annual carbon emissions from the grid in tonnes of CO2 for the coming  year?

(1 marks)

g.    The government would like to reduce net carbon emissions from the electricity grid down to 5  million tonnes for the coming year.  The two strategies that the government is considering are:

1.    Compensate generator G1 to close, operate the SMR, and buy reputable carbon offset certificates to reduce net grid emissions;

2.    Do not intervene with generator G1 and do not operate the SMR until the scheduled start in one year and buy reputable carbon offsets or certificates to reduce net grid emissions.

Provide a recommendation for the preferred strategy for the government taking into account direct and indirect costs to the government and electricity consumers. Back up your recommendation with an explanation of your methodology, assumptions and calculations.

(4 marks)

h.   The commissioning of a new SMR could conceivably encounter teething problems, specifically a one month unexpected outage in its first year of operations. Explain how this scenario affects your conclusions from part (g) with regard to the legs of the energy trilemma along with any assumptions, explanations and supporting results.

(3 marks)


热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030