代写Construction Technology & Services III - 218.224代做留学生SQL 程序

Construction Technology & Services III - 218.224

Assignment Report on Infrastructure for New Suburban Development

Due Date: 18th October 2024

Purpose: This assessment contributes toward 40% of your grade for this course Length: 3000 – 3500 words

Learning outcome/s being assessed:

•   Discuss design considerations for large infrastructure projects.

•   Describe construction methods, materials and details for infrastructure projects.

•   Assess the various risks on public infrastructure projects and how they might be managed.

•   Describe the maintenance requirements for large infrastructure projects.

Assignment Details:

Auckland Council is facing a challenge to provide housing to ever increasing population of the city. Auckland Council has developed the Auckland Plan 2050’, one of the key focus of this plan is to provide ‘Homes and Places’ for Aucklanders. To ensure housing provisions for all, the New Zealand government is encouraging the development of new suburban communities in various parts of Auckland, including the North-West of Auckland. For such developments to occur, investment in lifeline infrastructure projects is required. The process always starts with joint efforts from a multidisciplinary team that studies and looks for the best options for the infrastructure  projects to be suggested for further investigation. The planning team recognizes various development infrastructure requirements, including transport and storm infrastructure.

As a planning team member, involved in the development of a new suburban community in North-West of Auckland, you must prepare a report on transportation, stormwater, and drinking water infrastructure projects.

The report you will write should include the following:

(1)       An introduction to why the development of a new suburb is needed in the North- West of Auckland.

(2)       Investigate whether such a development project will support Auckland Plan 2050- development strategy.

(3)       Identify and discuss in detail one component of transport infrastructure that will be provided in the new development.

(4)       Identify and discuss one component of stormwater infrastructure that will be provided to meet the requirements of the new community.

(5)       Identify and discuss  one component of drinking water infrastructure that will be provided to meet the portable water needs of population in this new development.

(6)       For all the identified components (transport, stormwater, and drinking water), provide their description, including (i) design features, (ii) construction method, (iii) planned maintenance activities (Scheduled and condition-based maintenance) and (iv) stakeholders involved in the development and maintenance of each of these identified components.

(7)       Also, make a list of the ‘Environmental Risks ’ associated with the development of these infrastructure facilities.

(8)       Conclusion of the report.

General Notes

-    The report should be between 3,000 – 3,500 words.

-    Any fact that is mentioned in the report should be adequately referenced.

-    Using sketches, figures and pictures is highly recommended; however, it needs to be cited in the report and correctly referenced.

-    Besides the body of the report, an executive summary, a list of contents, and a conclusion should be included.

-    A detailed description of each identified component should consist of design features, construction method, planned maintenance activities (Scheduled and condition-based maintenance), role of these components, stakeholders involved and environmental risks.

-    The student will be allowed to submit a draft to check the Turnitin score, which should not by any means be more than 15%.

-    Use of Artificial Intelligence (AI) is not allowed to write this report.





热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图