PREAMBLE As future architects it is critical that you not only understand how to construct your designs but consider how the structure and construction can contribute to what you are trying to

achieve. An understanding of timber and masonry construction is a central aim of this course as is being aware of the limitations of structure.

To successfully carry out this project you will need to observe actual buildings being built or already built, make use of the various texts referred to in handouts and lectures; ask questions of yourselves, fellow

students and tutors as you work. It will be important that you consider the different possibilities that standard solutions offer and amend the solutions while not compromising the pragmatic reasoning  behind the standard solutions.

The project brief requires the design of a timber or timber and masonry structure. The main primary and secondary structure of you scheme is to be developed to a level that explains how it could be built.

BRIEF In ARCH 1101 – Architectural Design Studio 1 you have designed a Fishing Club and Life

Saving Tower at Gordons Bay. (If not discuss with your tutor to make alternate arrangements). During this course you are going to develop and change the design through a series of exercises exploring the construction of the floors, wall and roof in timber or timber and masonry.

The idea is that as the design changes you make the design not only feasible to build but more   interesting. You are to use your new understanding of structures and construction to explore the aesthetic and pragmatic potentials of timber and masonry construction.

APROXIMATE SIZES  Surf Life Saving Tower 20m2, Fishing Club 30m2 and Bathing Facilities  25m2. The Life Saving Tower is for up to three people who are to have uninterrupted views across the   bay. The Fishing Club requires some storage, two work benches and a place for members to catch up.

The Bathing Facilities are to be provided as required and may be largely outside. SITE The site for your building is Gordons Bay.

 

PRESENTATION REQUIREMENTS For the assignment there are four components: The Logbook, Construction, Stability and Span Tables.

Logbook

1. Your logbook is a record of what you have been doing both in the tutorials and as self-study. Keep a

record of all the work you have done in the tutorials, any reflections you have on the lectures/ tutorials

(not lecture notes though) and any self study. Try and explain why, what and how things are done. This is an opportunity for you to show us how engaged you are.

Construction

2. You are to produce a 3D computer model of all the main structural elements used in your design. This  can be done in sketch up or any other computer program you like. All structural elements must be shown including the following if used: footings, masonry including cavity, bearers, joists, studs, noggins, top

plate, bottom plate, posts, rafters, beams, battens and stair structure.

Stability

3. Consider the lateral stability of your Gordon’s Bay building. Look at wind actions from two directions in plan and think about the way your structure resists actions that tend to turn rectangular panels into

parallelograms. Employ one or several of the three stable rectangle methods (diagonal bracing, ridged frame. action or shear wall) over all levels from roof to foundation to achieve stability against wind from either direction.

Consider the connections of your building’s components and idealise the joints. Show this in a system

diagram including the forces. Using two-dimensional and/or three-dimensional sketches, demonstrate in separate drawings viable load paths from each point of application of each of the two lateral loads at the top of the building to a footing at the ground. In separate system diagrams Also show the action effect diagram of key structural elements under the two loads.

An example how this looks for part of a small building is provided below as a guide. It shows a picture of the building, a simple 3D sketch with bracing, two system diagrams in elevations showing the load path  and a plan indicating the direction of the forces. You also need to provide a separate sketch with the action effect diagram of your own design.

 

4. Span tables

Even though all your designs are unique and probably don’t strictly comply with the limitations of AS1684 it is useful to understand span tables and the consequence of your design choices on beam sizes. You are to work out a typical floor joist size and rafter for your design. You may choose any grade of timber.

Use the tables in Acceptable Standards of Construction. Ensure you also check the notes under the span tables.

Submission

1 Submit all of the above in one pdf file less than 20Mb

2. Logbook - Include a scanned copy of your logbook as part of the pdf file

3. Construction - Include three views of your 3D computer model indicating the parts as outlined in point one above.

4. Stability – Provide:

- a system diagram either in 3d or two 2d sketches showing the proposed loads.

- separate load path diagrams including the load and system diagram for each load.

- seperate action effect diagrams for each load

5. Span tables – Show the span tables selected to size your floor joists and rafters. Indicate on the table how you came to select the size required.

For the Floor joists note the roof load width, joist spacing, roof type and whether the floor joist is continuous or a single span.

For the rafters note if a single or continuous span, rafter spacing, if you have any overhang and what roof mass you used.

Add notes under both about limitations and assumptions plus how you addressed any of the notes on the span table.

The submission is to be made via the link on Moodle.

ASSESSMENT CRITERIA

        Logbook – engagement with course, exploration, and development of knowledge

        Contribution of construction to design – Is the construction making it interesting?

        Correctness, accuracy and completeness of the construction

        Correct sizing using span table

        Logical bracing, system diagram, load path and action effect diagrams

PROJECT WEIGHTING

The project carries 35% of overall course assessment.

SUBMISSION DATE

Before Tuesday 9am 23 July (week 9)





热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图