代做FNCE6012 Financial Modeling – G1调试SPSS

FNCE6012 Financial Modeling – G1

FNCE6012 Group Project (40% of Total Assessment Grade)

•   You are to form teams of 5 people to work on a project with multiple parts. All parts must contribute to a common theme for the project, and must satisfy both the modelling and analysis requirements as covered in the course.

•   These must appropriately use techniques covered in class (using the Excel spreadsheet) and, where needed, other Excel tools and add-ins.

•   All team members are expected to participate fully in the project. A peer evaluation will be administered if required.

•   Group formation to submit to TA by 27th April.

•    Project Title and Topic (i.e. Hypothesis/ Business Problem) to be send to TA by 27th April.

TAs email: Athanasius LIAU <athanasiusl.2021@accountancy.smu.edu.sg>

•   Assignment report and Presentation ppt due on the  10th June.

•    In-Class presentation on 15th  June 2024 (Week 9 class). Each group only 15min.

•   Maximum 15 pages for the report (exclude appendix and excel workbook). Submission must include the excel workbook and data   used for the assignment.

Two types of projects are accepted:

1.   Exploratory modelling – it is used to discover problem questions and the needed data and analyses to prove or show a hypothesis, and the model structures are useful for what-if analyses, OR

2.   Data analysis and decision optimization  –  it is usually done in  management science, statistics or business subject courses. This kind of projects assumes a known problem question and  seeks the “best” solution approach and values.

Your final report should consist the following components:

1.  Exploratory Modelling Project

a)  Literature Review

Provide the literature review which discuss published information in a particular subject area, and sometimes information in a  particular subject area within a certain time period. Provide a simple summary of the sources that combines both summary and synthesis.

b)  Theoretical construct & Hypothesis

State the theoretical framework or foundation from which the knowledge   is constructed (metaphorically and literally) for the research study you are working on. It serves as the structure and support  for the rationale for the study, the problem statement, the purpose, the significance, and the research questions.

Base on the theoretical construct, develop your hypothesis. A hypothesis is a precise, testable statement of what you predict will be the outcome of the study

c)  Modelling Methodology

Describe what type of modelling techniques you will be using to test your hypothesis. State clearly the rationale of any assumption(s) you are making. These must appropriately use techniques covered in class (using the Excel spreadsheet)  and, where needed, other Excel tools and add-ins.

d)  Data & Descriptive Statistics

Describe where are you data source(s) from and how you obtain them. Provide some descriptive statistics of your data, for example, trend plots, distribution plots, average, interquartile range, variances, corrections….etc.

e)  Modelling Results

Describe the outcome of your model results and whether it support your  hypothesis/ hypotheses.

f)    Conclusion

2.  Data Analysis and Decision Optimisation Project

a)  Problem Statement & Decision Outcome

Articulate clearly the problem statement which is a concise description of the problem or issues a project seeks to address. The problem statement identifies the current state, the desired future state and any gaps between the two. State clearly the decision outcome that you need to make given the problem statement.

b)  Business Assumptions  & Rational

What are the absolute or relative measures of the problem that quantify that gap? What are the business assumptions  (including external assumptions  like economic or environmental) you will be making? State clearly the justification and rationale of the assumption(s) made.

c)  Modelling Methodology

Describe what type of modelling techniques you will be using to help you with the decision outcome. State clearly the rationale  of any model assumption(s) you are making. These must appropriately use techniques covered in class (using the Excel spreadsheet) and, where needed, other Excel tools and add-ins.

d)  Data & Descriptive Stats

Describe where are you data source(s) from and how you obtain them. Provide some descriptive statistics of your data, for example, trend plots, distribution plots, average, interquartile range, variances, corrections….etc.

e)  Modelling Results

Describe the outcome of your model results and how will it impact your decision.

f)    Conclusion

Sample ideas:

I.      Project Topic: Business problems

Typically with a hypothetical client

•   Example: Restaurant; Tuition center; Delivery service company; Online shop;

Maid agency...... What you can do:

•   Pricing decision, Productivity and performance analysis, queuing analysis, HR

resource allocation, newmarket analysis... Data Source:

•   private and public; simulated data with reasonable assumptions

II.      Project Topic: Social problems

Example:

                    •   Real estate market; stock market, food selection, car purchase, transportation

problem, health program, global warming, population and economy... Data Source:

•   public and first-hand collection

•   Simulated data with reasonable assumptions


热门主题

课程名

litr1-uc6201.200 ee1102 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst cosc2803 math39512 omp9727 ddes9903 babs2202 mis2002s phya21 18-213 cege0012 mgt253 fc021 int2067/int5051 bsb151 math38032 mech5125 mdia1002 cisc102 07 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 efim20036 mn-3503 comp9414 math21112 fins5568 comp4337 bcpm000028 info6030 inft6800 bcpm0054 comp(2041|9044) 110.807 bma0092 cs365 math20212 ce335 math2010 ec3450 comm1170 cenv6141 ftec5580 ecmt1010 csci-ua.0480-003 econ12-200 ectb60h3f cs247—assignment ib3960 tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 econ7230 msinm014/msing014/msing014b math2014 math350-real eec180 stat141b econ2101 fit2004 comp643 bu1002 cm2030 mn7182sr ectb60h3s ib2d30 ohss7000 fit3175 econ20120/econ30320 acct7104 compsci 369 math226 127.241 info1110 37007 math137a mgt4701 comm1180 fc300 ectb60h3 llp120 bio99 econ7030 csse2310/csse7231 comm1190 125.330 110.309 csc3100 bu1007 comp 636 qbus3600 compx222 stat437 kit317 hw1 ag942 fit3139 115.213 ipa61006 econ214 envm7512 6010acc fit4005 fins5542 slsp5360m 119729 cs148 hld-4267-r comp4002/gam cava1001 or4023 cosc2758/cosc2938 cse140 fu010055 csci410 finc3017 comp9417 fsc60504 24309 bsys702 mgec61 cive9831m pubh5010 5bus1037 info90004 p6769 bsan3209 plana4310 caes1000 econ0060 ap/adms4540 ast101h5f plan6392 625.609.81 csmai21 fnce6012 misy262 ifb106tc csci910 502it comp603/ense600 4035 csca08 8iar101 bsd131 msci242l csci 4261 elec51020 blaw1002 ec3044 acct40115 csi2108–cryptographic 158225 7014mhr econ60822 ecn302 philo225-24a acst2001 fit9132 comp1117b ad654 comp3221 st332 cs170 econ0033 engr228-digital law-10027u fit5057 ve311 sle210 n1608 msim3101 badp2003 mth002 6012acc 072243a 3809ict amath 483
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图