Lavazza Coffee Ltd produces different kinds of Coffee drinks. The company is planning to invest in two modern equipment which are mutually exclusive. The management of the Coffee Company provides you the following information. Use 8% to calculate the positive NPV and 16% to calculate the negative NPV

Cleated

Conveyor

Cherry Washer

£

£

Cost of Investment

300,000

300,000

Annual cashflows

Year 1

90,000

70,000

Year 2

80,000

63,000

Year 3

65,000

120,000

Year 4

80,000

65,000

Year 5

60,000

62,000

with scrap value of

8,000

8,000

Required:

a)   For each of the two equipment  calculate:

(i) Accounting rate of return (5 marks)

(ii) Payback period and (5 marks)

(iii) Net present value. (10 marks)

(iv) Internal rate of return (10 marks)

b) Explain the advantages and disadvantages of using the internal rate of return to evaluate the investment. (10 marks)

(Total 40 marks)

SECTION B - You must answer any TWO questions from this section. Each question is worth 30 marks

Question 2

iRugs Ltd is a medium size company dealings in the manufacturing varieties of rugs and carpets. The company main material is wool fibre which is bought in 3 yards in lengths.

The budgeted cost for one yard length of wool is £12 and each rug produced uses 6 yards of wool. It took the company’s worker 1.50 hours to make one rug and the hourly rate for labour is £6.50 per hour.

Variable overhead rates are charged at £3.20 per direct labour hour.

The budget for each month is to produce 210 rugs with a selling price of £90 for each rug.

The newly employed management accountant of the company produced the following actual sales and costs figures:

Sales of 210 rugs with the sales figure at £20,200.

Purchases figure of wool stood at a total of £5,000 and 360 yards lengths were bought and used. Labour costs were £3,000 and 320 hours were charged.

The Variable overheads incurred for the month remains at £800.

Based on the information given above, the Finance Director requested the newly employed management accountant to provide some further analysis on the variances in the month.

Required:

a)        Calculate the appropriate variances from the information provided. (10marks)

b). Prepare a statement reconciling the difference between budget and actual. (8marks)

c) Suggest possible reasons for each of these variances. (12marks)

(Total 30 marks)

Question 3

Fergana Coffee ltd specialises in the production of Coffee. The Company specifically produce two types of Coffee Green and Dried. The Product costs are computed on an overhead absorption-rate basis using a labour-hour method. Prices are set based on costs plus 30 per cent.

The planned figures for next year are as follows:

                                                       A             B

Material cost (£/unit)                        10            15

Direct labour hours (per unit)           0.75          0.85

Planned production/sales (units)    30,000          5,000

Next year’s overheads are planned to be £128,000. Direct labour is £7.50/hour.

The company has reduced the selling price of Dried Coffee, with the result of a very low profit margin. The company employed a new management accountant who suggested to the

management team to try the activity-based costing approach. An analysis of the overheads led to a grouping of the main business activities into Grinders (£75,000), Dispensers (£53,000)

costs. These activities can be allocated to the respective cost drivers of machine hours,

dispensers order. This reflects the use of resources in each area. Further investigation showed the proportion of each Coffee (Dried and Green) of the total volume of products:

                                A               B

                                %             %

Machine hours           35             65

Dispensers orders      45              55

Required:

1.  Calculate for each product the full cost and selling price using:

i) The absorption costing method (8 marks)

ii)  The activity-based costing method (12 marks)

2.  Discuss two advantages of the activity-based costing method and two disadvantages of the method. (10 marks)

(Total 30 Marks)

Question 4

The Bell-Co plc produces and sells Computers. It competes and plans to grow by producing high- quality Computers but at low cost that are delivered to customers in a timely manner. Being a newly established computers company, Bell-Co plc has to contend with serious competition from its rival companies that deals in computers in the UK. In an attempt to edge its competitors Bell- Co hire an expert management consultant to analyse the business and to suggest possibilities for improvement. After an intensive review of the business and its operations, the consultant presented his findings to the management of the company. In his presentation, he emphasised a number of key issues that require immediate attention:

•    Financial performance of the business has suffered recently, with a fall in profit from the previous year of about 30% expected.

•    Product quality is an issue, as the number of returns due to quality issues has risen to 22% of all computers sold.

•   A  previously  implemented  reorganisation of the manufacturing  process  has  had  the opposite effect, leading to an 8% drop in productivity.

•   Customers seem to be unhappy with the quality of the product. The frequency of complaints has increased by 18% over the last 12 months.

•    Market share in their computer market in Middle-East has dropped from 40% to 20%.

•    Human resources reported an increase in the rate of staff turnover, which has reached a record of 25%, coupled with employee satisfaction dropping to a low of only 28% of staff declaring to be satisfied in their job.

The management of The Bell-Co plc is convinced that continuously improving its manufacturing process and having satisfied employees are critical to implementing its strategy in 2022.

Required:

a)  Design  a  Balanced  Scorecard for The  Bell-Co  plc that includes the four perspectives. Describe two goals for each perspective and briefly explain your answer. (14 marks)

b)  Explain in details 4 benefits and 4 limitations of the balanced scorecard and briefly comment on them. (16 marks)

(Total 30 marks)

Present Value Factors

1%       2% 3%       4% 5% 6% 7% 8% 9%        10%

Year

1 0.990   0.980    0.971   0.962    0.952   0.943   0.935    0.926   0.917    0.909

2 0.980   0.961    0.943   0.925   0.907    0.890   0.873    0.857   0.842    0.826

3 0.971   0.942    0.915   0.889   0.864    0.840   0.816    0.794   0.772    0.751

4 0.961   0.924    0.888   0.855   0.823    0.792   0.763    0.735   0.708    0.683

5 0.951   0.906    0.863   0.822   0.784    0.747   0.713    0.681   0.650    0.621

6 0.942   0.888    0.837   0.790   0.746    0.705   0.666    0.630   0.596    0.564

7 0.933   0.871    0.813   0.760   0.711    0.665   0.623    0.583   0.547    0.513

8 0.923   0.853    0.789   0.731   0.677    0.627   0.582    0.540   0.502    0.467

9 0.914   0.837    0.766   0.703   0.645    0.592   0.544    0.500   0.460    0.424

10 0.905   0.820    0.744   0.676   0.614    0.558   0.508    0.463   0.422    0.386

11 0.896   0.804    0.722   0.650   0.585    0.527   0.475    0.429   0.388    0.350

12 0.887   0.788    0.701   0.625   0.557    0.497   0.444    0.397   0.356    0.319

13 0.879   0.773    0.681   0.601   0.530    0.469   0.415    0.368   0.326    0.290

14 0.870   0.758    0.661   0.577   0.505    0.442   0.388    0.340   0.299    0.263

15 0.861   0.743    0.642   0.555   0.481    0.417   0.362    0.315   0.275    0.239

16 0.853   0.728    0.623   0.534   0.458    0.394   0.339    0.292   0.252    0.218

17 0.844   0.714    0.605   0.513   0.436    0.371   0.317    0.270   0.231    0.198

18 0.836   0.700    0.587   0.494   0.416    0.350   0.296    0.250   0.212    0.180

19 0.828   0.686    0.570   0.475   0.396    0.331   0.277    0.232   0.194    0.164

20 0.820   0.673    0.554   0.456   0.377    0.312   0.258    0.215   0.178   0.149

11%     12% 13% 14% 15% 16% 17% 18% 19%     20%

1 0.901   0.893    0.885   0.877    0.870   0.862   0.855    0.847   0.840    0.833

2 0.812   0.797    0.783   0.769   0.756    0.743   0.731    0.718   0.706    0.694

3 0.731   0.712    0.693   0.675   0.658    0.641   0.624    0.609   0.593    0.579

4 0.659   0.636    0.613   0.592   0.572    0.552   0.534    0.516   0.499    0.482

5 0.593   0.567    0.543   0.519   0.497    0.476   0.456    0.437   0.419    0.402

6 0.535   0.507    0.480   0.456   0.432    0.410   0.390    0.370   0.352    0.335

7 0.482   0.452    0.425   0.400   0.376    0.354   0.333    0.314   0.296    0.279

8 0.434   0.404    0.376   0.351   0.327    0.305   0.285    0.266   0.249    0.233

9 0.391   0.361    0.333   0.308   0.284    0.263   0.243    0.225   0.209    0.194

10 0.352   0.322    0.295   0.270   0.247    0.227   0.208    0.191   0.176    0.162

11 0.317   0.287    0.261   0.237   0.215    0.195   0.178    0.162   0.148    0.135

12 0.286   0.257    0.231   0.208   0.187    0.168   0.152    0.137   0.124    0.112

13 0.258   0.229    0.204   0.182   0.163    0.145   0.130    0.116   0.104    0.093

14 0.232   0.205    0.181   0.160   0.141    0.125   0.111    0.099   0.088    0.078

15 0.209   0.183    0.160   0.140   0.123    0.108   0.095    0.084   0.074    0.065

16 0.188   0.163    0.141   0.123   0.107    0.093   0.081    0.071   0.062    0.054

17 0.170   0.146    0.125   0.108   0.093    0.080   0.069    0.060   0.052    0.045

18 0.153   0.130    0.111   0.095   0.081    0.069   0.059    0.051   0.044    0.038

19 0.138   0.116    0.098   0.083   0.070    0.060   0.051    0.043   0.037    0.031

20 0.124   0.104    0.087   0.073   0.061    0.051   0.043    0.037   0.031   0.026



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图