072243A程序代做、代写Java语言编程
Primary School Management System (PSMS)
Java Course Semester Project, CUEB, SDS, Spring-2024.
Course ID: 072243A,
The following diagram illustrate typical stages of Software Development Cycle(SDC).

Fig. 1: Software Development Cycle(SDC).
1.Developing Prototype Model
Identify the basic requirements including the input, output information and security.
Develop initial prototype: The initial prototype is shall includes only user interfaces.
Review: The end-users, examine the prototype and provide feedback on additions or changes.
Revise and enhancing the prototype: Using the feedback, both the specifications and the prototype can be improved.
1.1 User description
There are four main users for the proposed system; these are Admin, student, teacher and the parent. Each user can perform several different functions during the use of the system. These functions are determined according to the design of the proposed system and a user-friendly functions to make the system more effective and efficient.
Admin: sign in, create new teacher/student/class, involve parent in registration process, generate time table (student, teacher).

Create, edit and delete student account.
Create, edit and delete teacher account.
Create, edit and delete parent account.
Store, edit, delete, calculate and student's grade.
Add Classes and Subject to the teachers.
Create, edit, delete and timetable.

Student: Sign in, view personal info, view time table, view exam’s marks, contact with school and teacher, apply for a leave

View their marks per subject.
View their timetable
Apply for leave
Change their account's information

Teacher: sign in, add student marks, add student attendance, contact with parent about their child, view teacher time table.

Add Student's marks per Subject.
Add Student's attendance per Subject.
Approve student leave application


Parent: Sign in, view report about his/child

View the marks of their children.
View the attendance of their children.
Change their account's information

1.2 System Requirement
Before creating the system, it is necessary to visualize the layout, design all features intended to be incorporated. In addition, how users will interact with each page and icon and how the System should perform. Once the requirements are set, developers can initiate the other technical work including system design, development, testing, implementation, and operation.
Functional requirements: “visible” features such as generate report, login, and signup.
Nonfunctional requirements: security, reliability and maintainability
2.System Analysis
Analyze the functional and non-functional requirements using use-case diagrams, and use-cases details. In addition, the interactive behavior of the activities is analyzed using sequence diagrams and activity diagrams.
3.Design Phase
During the design phase, the relationships between classes were designed and analyzed using the class diagram(UML). After that, Class Diagram are used to illustrate the relationships and source code dependencies among classes. The class defines the methods and variables in an object, which is a specific entity in a program.
4.Implementation Phase
Through this phase, several activities and techniques will be used to develop the system. The development of the system starts with designing the system structure. Then the style of the system will be designed using swing and awt.
5.Testing and Evaluation
5.1 Testing
Two types of testing will be performed to test the system. These tests were mainly performance testing and functionality testing.
Performance Testing
Functionality Testing
All functions in the application, forms used to enter data for submission, editing, getting or deleting information from users will be tested.
Security Testing

6.Evaluation
Since the system has four users whose opinion about the system is very important, a sample of student, teacher, parent, and school manager were consulted to evaluate the System.
6.1 Usability Evaluation
To evaluate the system based on the users (student, teacher, parent, admin).

Note:
1.Use Proper Comments in the code, follow the Java rules for defining class, package, variables and functions names.
2.Use balsamiq for design of GUI before implementation (https://balsamiq.com/wireframes/desktop/)
3.Use UML for classes and objects diagrams
4.Every group need to submit a report and code
5.This document is subject to minor changes before the project submission

热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图