代写IFB105TC Production Planning and Control 2024代做Java语言

IFB105TC Production Planning and Control

Individual Assessment (50%)

Sunday, 26 th May 2024

Case Analysis (50%):

1.   Submission: Deadline 26th May 2024

Read carefully the case information, then you need to critically analyze the case, and answer the questions accordingly (no need to compile the answers as a report). Citation and references are preferable, where needed.

2.   Format Requirements:

Assignments must include the cover page with your student ID filled

Pls. name the file as IFB105TC-PPC-Your ID

•     All assignments must be typed, proof-read, and professional in appearance

•     The word font should be ‘Times New Roman’ or ‘Calibri Light’ and font size 12 with 1.5 spacing.

•     The left and right margins should be ‘Justify

•     Harvard Referencing if citation and references apply

Individual Assessment

Tasks:

1.    XEC employs workers who lay telephone cables and perform. various other construction tasks. The company prides itself on good service and strives to complete all service orders within the planning period in which they are received. Each worker puts in 600 hours of regular time per planning period and can work as many as an additional  100 hours of overtime. The operations department has estimated the following staff requirements for such services over the next four planning periods:

Planning Period

1

2

3

4

Demand (hours)

21,000

18,000

30,000

12,000

XEC pays regular-time wages of $6,000 per employee per period for any time worked up to 600 hours (including undertime). The overtime pay rate is $15 per hour over 600 hours. Hiring, training, and outfitting a new employee costs $8,000. Layoff costs are $2,000 per employee. Currently, 40 employees work for XEC in this capacity. No delays in service, or backorders, are allowed. Prepare a chase strategy table using only hiring and layoffs. Pls. indicate the details as many as possible, and calculate the total cost by doing so. Also, per your answer, pls. discuss whether the chase strategy is an optimal approach in this case. (15 points)

2.    Below is an incomplete master production schedule for a certain product, a setup cost of $50, a holding cost per week of $2, a beginning inventory of 0, and a lead time of 1 week. Pls. fill in the MRP table below and calculate the costs of using lot-for-lot for this l0-week period. (16 points)

WEEK

1

2

3

4

5

6

7

8

9

10

Gross requirements

0

0

50

0

0

35

15

0

100

0

Scheduled receipts

Projected on hand

Net requirements

Planned order receipts

Planned order releases

3.    XEC purchases discontinued appliances from various suppliers and then sells them on demand to retailers in the region. XEC operates 5 days per week, 52 weeks per year. Only when it is open for business can orders be received. The following data are estimated for a countertop mixer:

·    Average daily demand = 100 mixers

· Standard deviation of daily demand = 30 mixers

·     Lead time = 3 days

· Holding cost = $9.40/unit/year

·     Ordering cost = $35/order

·     Service level = 92%

The distributor uses a continuous review Q system.

a. What order quantity, Q, and reorder point, R, should be used? (14 points)

b. What is the total annual cost of the system? (5 points)

c. If on-hand inventory is 40 units, one open order for 440 mixers is pending, and no backorders exist, should a new order be placed? (5 points)

Suppose that a periodic review (P) system is used at the distributor in the above question, but otherwise, the data are the same.

d. Calculate the P (in workdays, rounded to the nearest day) that gives approximately the same number of orders per year as the EOQ. (2 points)

e. What is the total annual cost of the P system? (5 points)

Note: pls. include the calculation details as many as possible, every step might count for the result.

4.    TOC would impact other departments in the corporation, and they would affect the production planning and control in return, could you imply what they are and explain? Pls. integrate into the context of Bosch. (16 points)

5.    Excess capacity of afirm can lead to underutilization of its assets, while a decision to decrease capacity can result in lost opportunities. Identify examples where businesses have incurred substantial losses due to excess capacity and explain the reasons that may have resulted in this problem. (10 points)

6.    Explain why the production  and planning department should be concerned about priority systems in either service or manufacturing organizations. (12 points)

Note: no more than 500 words of each question (tables and calculations are excluded).








热门主题

课程名

omp9727 ddes9903 mgt253 fc021 int2067/int5051 bsb151 babs2202 mis2002s phya21 18-213 cege0012 math39512 math38032 mech5125 mdia1002 cisc102 07 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 efim20036 mn-3503 comp9414 math21112 fins5568 comp4337 bcpm000028 info6030 inft6800 bcpm0054 comp(2041|9044) 110.807 bma0092 cs365 math20212 ce335 math2010 ec3450 comm1170 cenv6141 ftec5580 ecmt1010 csci-ua.0480-003 econ12-200 ectb60h3f cs247—assignment ib3960 tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 econ7230 msinm014/msing014/msing014b math2014 math350-real eec180 stat141b econ2101 fit2004 comp643 bu1002 cm2030 mn7182sr ectb60h3s ib2d30 ohss7000 fit3175 econ20120/econ30320 acct7104 compsci 369 math226 127.241 info1110 37007 math137a mgt4701 comm1180 fc300 ectb60h3 llp120 bio99 econ7030 csse2310/csse7231 comm1190 125.330 110.309 csc3100 bu1007 comp 636 qbus3600 compx222 stat437 kit317 hw1 ag942 fit3139 115.213 ipa61006 econ214 envm7512 6010acc fit4005 fins5542 slsp5360m 119729 cs148 hld-4267-r comp4002/gam cava1001 or4023 cosc2758/cosc2938 cse140 fu010055 csci410 finc3017 comp9417 fsc60504 24309 bsys702 mgec61 cive9831m pubh5010 5bus1037 info90004 p6769 bsan3209 plana4310 caes1000 econ0060 ap/adms4540 ast101h5f plan6392 625.609.81 csmai21 fnce6012 misy262 ifb106tc csci910 502it comp603/ense600 4035 csca08 8iar101 bsd131 msci242l csci 4261 elec51020 blaw1002 ec3044 acct40115 csi2108–cryptographic 158225 7014mhr econ60822 ecn302 philo225-24a acst2001 fit9132 comp1117b ad654 comp3221 st332 cs170 econ0033 engr228-digital law-10027u fit5057 ve311 sle210 n1608 msim3101 badp2003 mth002 6012acc 072243a 3809ict amath 483 ifn556 cven4051 2024 comp9024 158.739-2024 comp 3023 ecs122a com63004 bms5021 comp1028
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图