BPLN0025: Business Cases for Infrastructure

Time allowed: 2.5 hours (150 minutes)

• Answer FOUR questions from Part A and ALL of Part B.

• Part A attracts 60% of the overall marks, while Part B attracts 40% of the overall mark.

• Use illustrations and include diagrams in your answers where they assist in providing explanation.

PART A (60% of marks)

• Answer FOUR questions from the following seven

• Each question carries equal weighting (15% each)

Question 1

Outline the structure and purpose of the HM Treasury 5 Case Model and critically discuss its suitability for the development of business cases for major infrastructure projects, which are often highly politicised.

Question 2

Define what is meant by the Discount Rate. Critically discuss the typical discount rates used by HM Treasury, and illustrate the impacts of varying the discount rate on the output of a Cost Benefit Analysis for a major infrastructure project with a design life of 50 years.

Question 3

Outline the key differences between the appraisal, monitoring and evaluation of infrastructure projects. Discuss which of these three procedures is least used in practice and why this is problematic. Make a suggestion for increasing its usage referring to a recent infrastructure project to illustrate your answer.

Question 4

Discuss the importance of the Strategic dimension of the HMT 5 cases business model in reducing project risk. Use a recently completed infrastructure project to illustrate your answer.

Question 5

Briefly discuss the Contingent Valuation method for estimating economic prices for use in Cost Benefit Analysis. Outline the typical applications, strengths and weaknesses of the methodology.

Question 6

What types of major infrastructure project would benefit from the use of Multi Criteria Analysis as opposed to CBA alone. Which dimension(s) of the 5 case business model could be informed by MCA and why?

Question 7

Roger Allport has identified a number of key areas where the private sector can contribute to infrastructure development. Discuss and critique the role the private sector can play in improving infrastructure project success.

PART B (40% of marks)

You must answer ALL of Part B (questions 8 and 9)

Question 8 (25% of marks)

You have been commissioned by the Department for Transport (the 'client') to undertake an Economic Analysis of the 'A303 Stonehenge Improvement Scheme'. The A303 is a trunk road which provides the most direct route between London and South West England (Figure 1). The £1.8bn project proposes to upgrade a congested section of the existing A303 to dual carriageway and includes a 3.3km road tunnel (Figures 2 and 3) to help protect the Stonehenge, Avebury and Associated Sites World Heritage Site (WHS).

Figure 1: Photo of existing A303 single carriageway and WHS site

Figure 2: Architect's drawing of planned 3.3 km tunnel included in the A303 Improvement Scheme

At its closest point the existing A303 passes within 165 metres of the Stonehenge monument and creates highly intrusive sights and sounds of traffic, detracting from an ideally tranquil rural setting for the Stones. The existing A303 runs through the heart of the WHS dividing it in two. This impacts on people's experience and understanding of the WHS, by limiting the safe mobility of visitors and opportunities to explore the area south of the A303. Stonehenge is an important economic asset in its own right, both in respect of its iconic status and the 1.3 million visitors it attracts each year.

Figure 3: Map showing the location of the proposed improvement scheme route and tunnel

The A303 is recognised as a strategic route to the South West. Enhancing this corridor is expected to deliver region-wide economic benefits by improving regional connectivity, facilitating planned growth in housing and jobs, and by improving the perceptions of tourists who use the A303 to travel to the region.

The objectives of the Project are:

• Transport -To create a high-quality route that resolves current and predicted traffic problems and contributes towards the creation of an Expressway between London and the South West.

• Economic growth -In combination with other schemes on the route, to enable growth in jobs and housing by providing a free flowing and reliable connection between the East and the South West peninsula.

• Cultural heritage -To contribute to the conservation and enhancement of the WHS by improving access both within and to the site.

• Environment and community -To contribute to the enhancement of the historic landscape within the WHS, to improve biodiversity along the route and to provide a positive legacy to communities adjoining the road.

The time scale for the construction of the project is 3 years, the subsequent operational life of the project is set as 7 years, with annual maintenance costs being incurred over this period.

Assuming the typically monetised transport benefits are expected to be:

• travel time savings to motorists using the upgraded road,

• accident cost savings arising from the higher design standards of the new road,

• vehicle operating cost savings due to higher traveling speeds attainable on the new road,

• Noise and air quality improvements from reduced congestion and below grade road surface.

Use the data outlined in table 1, 2 and 3 below to determine the economic return from the proposed scheme using the following indicators:

• Net Present Value

• Benefit/Cost Ratio

State your recommendationfor the funding of the project based on the economic return.

Question 9 (15% of marks)

Given the objectives of the A303 Improvement Scheme as outlined in question 8 above, advise the DfT on the possible limitations of using the above monetised transport benefits to determine the overall viability of the A303 Project. Include in your discussion any other impacts which you consider important to be included in the analysis, and the suitability (or otherwise) of CBA to enable their inclusion.

Table 1: Data required for economic analysis of the A303 Stonehenge Improvement Scheme

Description

Data

Reduction    in    accident    rates    due    to

improvement project

0.5 accidents per 106 vehicle-kilometres

 

 

Average cost of an accident

£7500

 

 

Value chime saved per vehicle kilometre

£0.0183 per vehicle-kilometre

 

 

Noise   and   air-quality   improvements   per

vehicle kilometre

£0.0003 per vehicle-kilometre

 

 

Average   speed   increase   due   to   upgrade project (v)

40km per hour

 

 

Discount rate

5%

 

 

Average vehicle operating cost

=((2+25/v+0.00001v2 )/100)  £  per  km (where v is average speed increase due

to upgrade project)

Table 2: Costs and flows for each year of the operation of the road

Year

Predicted Flow

(106 veh-km/year)

Construction

(£)

cost    Operating cost

(£)

1

-

600,000,000

2

-

600,000,000

3

-

600,000,000

4

7000

12,000,000

5

7100

12,000,000

6

7200

12,000,000

7

7300

12,000,000

8

7400

12,000,000

9

7500

12,000,000

10

7600

12,000,000



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图