Project 2

Development of Lok Ma Chau Loop : Land Decontamination

Your team is hired to be the Consultant of this project and asked to provide the following service as listed in the scope of the study.

Background

The administrative boundary between HK and SZ, an area of about 87 ha, previously lying to the north of the river course, became situated to the south of the re-aligned river course and falls within the boundary of the HKSAR. The area, commonly known as the Lok Ma Chau Loop (the Loop), was once used as a dumping ground for mud extracted from the river training works. Some of the dumped mud is contaminated.

The Loop is located near several major cross-boundary transport nodes (as shown in figure (a)) including the Lok Ma Chau Boundary Control Point, the MTR Lok Ma Chau Station of the Lok Ma Chau Spur Line and the San Tin Interchange. To the north across SZ River is the Huanggang Control Point of SZ. To the southwest is the Mai Po Nature Reserve and to the east is Hoo Hok Wai, comprising fish ponds of high ecological value.

The development of the Loop, which is one of the ten major infrastructure projects announced by the Chief Executive in the 2007-08 Policy Address and confirmed to be developed in the 2023 Policy Address, is a mega-scale and complex project jointly undertaken by the HKSARG and SZMG. The Loop is planned for developing higher education as the leading land use, with some elements of hi-tech research and development facilities, as well as cultural and creative industries (as shown in figure (b).

In view of the land contamination history of the Loop, environmental investigations had been completed under the P&E Study. According to the environmental investigation findings, some isolated areas of the Loop contain a heavy metal, arsenic, with concentration slightly exceeding the limit  stipulated  in the “Guidance  Manual for Use  of Risk-based Remediation Goals for Contaminated Land Management” (2007) promulgated by the EPD. CAP, CAR and RAP of the Loop were completed and have formed part of the approved EIA Report. Before construction works can start on the development sites, the contaminated land within the Loop has to be treated in accordance with the CAR/RAP under the approved EIA Report.

Scopes ofthe Project

The proposed scope of the Project comprises the following principal works elements:

(a) The  Consultant  shall  provide a 2-page summary on the re-apprasial of  the  existing available information on site investigation (e.g., # of boreholes and groundwater sampling), interpretation of the findings and recommendations as well as identification of their possible problems and mistakes;

(b) Under the CAR/RAP Study, “solidification/stabilization (S/S)” treatment method had been proposed for the remediation of arsenic-contaminated soil. The Consultant shall review the proposed S/S technology and propose 2 more potential technologies for this remediation project with your justification based on technical feasibility (e.g., soil types, contaminant characteristics, hydrogeological conditions). In addition, the Consultant shall compare the three technologies regarding their expected efficiency for removing arsenic from soils, cost, expected remediation duration, and ease of  operation (with  the  list  of  your references as supporting evidence). A comparison table with discussion in text is required.

(c) Other than technical feasibility, the non-technical aspects such as environmental impact and “social” considerations should be evaluated based on the given references in the last page.   For   example,    (1)   Final   GSR   MOU   Report   EPA   2013,   (2) https://clu- in.org/greenremediation/greenercleanupmetrics; (3) SuRF_uk_framework_final_march_2010. After combining the technical feasibility and non-technical aspects for overall considerations, you should then propose the most promising technology for this project.

(d) In  accordance  with  the  literature  review, the  Consultant  shall propose a preliminary design of land decontamination technology based on your choice in part (c) for bench- scale treatability (e.g., objectives, cleanup target level, reagents to be used for tests with references supported, mix design and time, criteria to be met, etc.) and pilot-scale tests (e.g., purposes, criteria, equipment to be used, expected duration, etc.).

Guidelines for the Submission of Project/Report:

1.   Title – centred on page, font is 14 point, BOLD CAPITALS, followed by one line space.

2.  Name – centred on page, font is 12 point, [first name, initial, surname]; program admitted (e.g., JEVE, CIEM).

3.   Student ID, email address, – centred on page, font is 11 point.

4.   One line space prior to text commencement.

5.   The text must be justified,  single-spaced  12 point Times New Roman throughout, unless specified. Page number should be added.

6.   The length of the report must be within twelve A4 pages with 2.5cm margins on all sides. A report beyond this length will not be accepted.

7.   The report must contain sufficient information to provide readers with a clear understanding of your summary, review, comparison, logical discussion, and design (not just copying data without providing references and evidence).

8.   If needed, some data can be presented or summarized in Tables and Figures format for ease of understanding (attached as an Appendix). Maximum limit for appendix is 5 pages. The last page of appendix is to describe the contribution of each group member.

9.   References, which are listed at the end of the report, must be mentioned in the main text and counted towards the max 12 pages.

10. The project must be submitted via Canvas. Late submission will not be accepted.

References:

Remediation Technologies

Denmark: “Technology Programme for Soil and Groundwater Contamination 2000”

Australia: “Technology Guides (Soil)” and “Technology Guides (Groundwater)” (2019)

China: HJ25.6 “Technical Guideline for Groundwater Remediation and Risk Control of Contaminated Sites” (2019)

Green and Sustainable Remediation / Social Appraisals

USA: SRT, ITRC, USAFCEE, Superfund, OSRTI

UK: Defra, CL:AIRE, SuRF

Cost-Benefit Analysis

Australia: “Guideline on performing cost-benefit and sustainability analysis” and “Cost- benefit and sustainability analysis tool” (2019)




热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图