代写PJM5900 70573 Foundations of Project Mgt SEC 23调试R语言程序

PJM5900 70573 Foundations of Project Mgt SEC 23

Description

Overview

In Individual Assignment 4(Lab 3),you will build on the work completed in Lab 2 to develop a comprehensive Performance  Measurement  Baseline(PMB)for your project.This lab will involve refining your project plan by  finalizing the scope,schedule,and cost baselines.You will ensure that all project activities are accurately defined and resourced,integrate any changes,and establish baselines that will serve as reference points for monitoring and controlling project performance. This exercise is crucial for preparing you to manage real-world projects effectively,as it emphasizes the importance of baseline planning in achieving project success.

Instructions

1. Implement Revisions:

■ Make all revisions suggested from the review of your previous lab submission.Do not re-submit your fle with the same mistakes,as this will affect your score.(2 points)

2. Create a Resource Pool:

Use the Resource Sheet in Microsoft Project to

create a resource pool.Include all resources needed for your project activities.If the Max-Units value is other than 100%,add a resource note to explain your scheme.(5 points)

3. Assign Resource Rates:

■ Assign astandard rate for each resource.Enter an overtime rate if applicable.This allows Microsoft Project to calculate resource and activity costs.(2 points)

4. Assign Resources to Activities:

■ Assign resources to all project activities that

require them.Note that resources should not be  added to summary tasks or milestones.(5 points)

5. Maintain Activity Durations:

■ Ensure that activity durations remain unchanged unless intentional.Review your Project Statistics before and after resource assignments to document any changes in project duration. Add a task note in Task Zero to share your observation.(1 point)

6. Resolve Overallocations:

■ Review your resource allocation and resolve any  overallocations.If an overallocation is reasonable and should not be leveled,add aresource note explaining why.(3 points)

7. Apply Cost Table and Add Contingency Reserve:

■ Switch to the Gantt Chart view and apply the Cost  table.Calculate 10%of the total project cost and add it as a contingency reserve.Enter a note in Task Zero indicating the total project cost.(4 points)

8. Save a Baseline:

■ If satisfied with your project plan,save a baseline, ensuring the contingency reserve is included.This baseline will serve as a basis for evaluating your project performance.(2 points)

9. Mark Initiating and Planning Activities Complete:

■ Mark all your initiating and planning activities as 100%complete.(2  points)

10. Set Status Date and Mark Executing Tasks:

■ Set the status date of your project to the midpoint since the project start.Select all executing tasks and mark them on track.(2 points)

11. Review Tracking Table:

■ Open the Tracking table and review the percentage complete for tasks with progress.

12. Enter Actual Start/Finish Dates:

■ Using the Tracking table with a split-screen view, enter Actual Start and Actual Finish dates that

differ from planned dates for at least five tasks.Do not change baseline values.(3 points)

13. Enter Actual Durations:

■ Enter Actual Durations that differ from planned durations for at least three tasks.Add a task note explaining why the duration changed for at least  one task.(3 points)

14. Analyze Project Variance and Predict Project Outcome:

■ View the Project Statistics to analyze variance from the original baseline.Use the Earned Value table to  examine the variance at completion(VAC) indicator.

Based on your variance analysis,predict the

project's outcome in terms of schedule and cost variances.Provide your forecasts in the submission area in Canvas.(4 points)

15. Save in Resource Usage View:

■ Display the Resource Usage view and save your fle so that it automatically opens in that view.(2 points)

Important  Notes:

■ Your project file should include at least 50 lines of deliverables,work packages,and activities.

■ Planning is an iterative process;you can revise your plan as more information becomes available.

■ Your project activities must be original.Do not copy information from other sources.Non-original assignments will receive azero score.

■ Review the attached fle for structuring your deliverables,work packages,and activities.

■ This assignment tests your understanding of

project deliverables and activities. Do not enter information beyond what is required(e.g.,activity duration or resources).The schedule and budget will be completed progressively.

■ Microsoft Project Training Resources are available in  Canvas>Modules>Microsoft   Project

Resources.



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图