Module Nine: Net Present Value Analysis of Breezyville Wind Power Project

Background

The Town of Breezyville is considering initiating a wind power project to provide electricity to its residents. The wind power project will be located on the outskirts of Breezyville. The project is being considered for both its economic and environmental benefits. The key question that the Town of Breezyville is trying to address is: does the wind power project make sense from an environmental and economic sense?

Below is some of the information that the Town has collected to estimate the benefits and costs of the proposed wind power project. In this case examined here, we assume a single turbine, 1.5 Megawatt (MW) project. The site being considered has strong, predictable winds that make it a good candidate for a wind power project. It is assumed that the Breezyville wind power project will operate 33% of the time based upon the availability of wind. All monetary values used in this exercise are in real $2020 dollars.

Capital Costs

Wind project costs are a function of many variables, but not limited to, project size, ownership structure, location and characteristics of a particular site, turbine and turbine manufacture, exchanges rates (i.e., if a foreign turbine is used) and even commodity costs (i.e., the cost of steel). For this exercise, some simplifying assumptions have been made. It is estimated that the capital costs of the Breezyville wind power project can be divided into four components: the turbine purchase, construction costs to install the turbine, costs to connect the turbine to the local electricity grind, and “soft” costs such as legal fees, engineering and siting plans etc. In total, the cost of installing the wind turbine is roughly $1,880,000 in the first year of the project. Assume for this exercise for simplicity, that the capital costs are a one-time expense that occurs in the first year of the project.

Operating Costs

The operating costs of the Breezyville wind power project include a variety of components such as operations and maintenance of the wind turbine, repair costs, management and administrative costs, property taxes, the costs to lease the land and insurance.  Operating costs are estimates at roughly $87,000 annually. The wind power project is anticipated to operate for twenty years. Annual operating costs for this exercise are assumed to be constant though time.

Scrappage Value

At the end of its useful life (i.e., 20 years), it is anticipated that the wind turbine can be sold at roughly $100,000. This is the scrappage value of the wind power project in twenty years.

Electricity Price

Once the Breezyville wind power project is up (i.e., in the first year) and running it will produce electricity that can sold into the existing electricity grid. The price of electricity in Breezyville is $0.07/ kilowatt-hour.

Avoided Climate Damages and U.S. Government Tax Credit

The wind power project will produce no carbon dioxide, a greenhouse gas that contributes to global warming. Thus, the Breezyville wind power project will avoid climate related environmental damages. For this exercise, it is assumed that if the wind power project had not been built that electricity produced from diesel power would have been used instead to produce electricity for the Breezyville residents. The diesel electricity plant would have produce climate damages of roughly $0.04/kilowatt hour (assuming that CO2 reductions are valued at roughly $50/ton). (The “horizon” value for C02 is captured in the $0.04/kilowatt hour estimate. Thus, for this exercise assume that the “horizon” value for C02 is zero).

Also, to help finance and spur wind projects across the country, the U.S. government is providing a renewable wind tax credit of $0.04/ kilowatt-hour to help promote the use of wind power. The tax credit is assumed to extend throughout the 20 years of the wind power project lifetime.

Key Assumptions

For this exercise assume that:

1 Megawatt (Mw) = 1000 Kilowatts (Kw)

1 Mw x 24 hours x 365 days (full capacity) = 8760 Megawatt hours (Mwh)

Questions:

Part One

(1) Main Case: Create a timeline in chart form. to show the benefits and costs of the Breezyville wind power project with the assumptions listed in the above section.

(2) Main Case: Calculate the net present value of the Breezyville wind power project using: (1) a 3% discount rate and, (2) a 7% discount rate.

(3) Main Case: Calculate the internal rate of return for the Breezyville wind power project.

Assume that the tax credit is a transfer payment from the federal government to Breezyville to help incentivize wind power. Since the payment “nets out” between the federal government and Breezyville, it is not considered a social benefit for purposes of Part One of this exercise.

Part Two

(1) Sensitivity One: Instead of a 20-year lifetime the wind turbine, assume that the wind turbine has a lifetime of 10 years. Assume also that there is no scrappage value for the wind turbine at the end of its useful life (i.e., 10 years). What is the net present value of the wind project with a 3% and 7% discount rate with a 10-year useful life for the wind project? What is the estimate of the internal rate of return with a 10-year useful life for the wind project? Create a chart to show the time line of costs and benefits for this sensitivity.

Assume for this sensitivity that the tax credit is a transfer payment from the federal government to Breezyville to help incentivize wind power. Since the payment “nets out” between the federal government and Breezyville, it is not considered a social benefit for purposes of this sensitivity.

 (2) Sensitivity Two: Assume that the amount of wind power in Breezyville is overestimated and that the capacity factor of the wind power project is only 16%. Assume a 20-year lifetime for the wind project, a scrappage value of $100,000 at the end of 20 years and that the Federal wind tax credit remains in place at $0.04/kwh. What is the net present value of the wind project with a 3% and 7% discount rate with the lower capacity factor? What is the estimate of the internal rate of return with the lower capacity factor? Create a chart to show the time line of costs and benefits for this sensitivity.

For this sensitivity, assume that the tax credit is a transfer payment from the federal government to Breezyville to help incentivize wind power. Since the payment “nets out” between the federal government and Breezyville, it is not considered a social benefit for purposes of this sensitivity.

(3) Sensitivity Three: For this sensitivity, assume that Breezyville is just looking at financial costs and benefits that the Town incurs/receives from the wind power project. In other words, the Town of Breezyville doesn’t consider the climate benefits of the project.  Also, assume that because of budget pressures, the Federal wind tax credit ($0.04/kwh) is eliminated. Continue to assume that the wind turbine has a useful life of 20 years, and that the scrappage value of the project at the end of 20 years is $100,000 and that the capacity factor for the wind power project is 33%.

What is the net present value of the wind project with a 3% and 7% discount rate from the Town’s perspective in this sensitivity? What is the estimated internal rate of return from the Town’s perspective in this sensitivity? Create a chart to show the timeline of costs and benefits for this sensitivity.

Directions

Review the questions above along with the course materials and the Boardman et al. reading. After reviewing these items and assessing each individual question, respond to each question thoroughly.

Scoring

Rubric Area

Weight of Row

Unacceptable

Satisfactory

Exemplary

Methods for Calculating Exhaustion/Optimal Depletion of an Exhaustible Resource

 

6 points

(0 – 4.79 points)

Demonstrates an understanding and synthesis of some of the concepts assessing the scarcity/optimal depletion of an exhaustible resource.

(4.8 – 5.39 points)

Demonstrates an understanding and synthesis of most of the concepts assessing the scarcity/optimal depletion of an exhaustible resource.

(5.4 or greater points)

Demonstrates an understanding and synthesis of all of the concepts assessing the scarcity/optimal depletion of an exhaustible resource.

 

 

 

 


热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图