代写MSIM3101 Management Science Assignment 2代写Processing

MSIM3101 Management Science

Individual Assignment 2

Due: 26 April 2024 (Friday: 6:00pm – Online Submission)

Question 1

The Fly-High Airplane Company builds small jet airplanes to sell to corporations for use by their executives. To meet the needs of these executives, the company's customers sometimes order a custom design of the airplanes being purchased. When this occurs, a substantial start-up cost is incurred to initiate the production of these airplanes.

Fly-High has recently received purchase requests from three customers with short deadlines. However, because the company's production facilities already are almost completely tied up filling previous orders, it will not be able to accept all three orders. Therefore, a decision now needs to be made on the number of airplanes the company will agree to produce (if any) for each of the three customers.

The relevant data are given in the table below. The first row gives the start-up cost required to initiate the production of the airplanes for each customer. Once production is under way, the marginal net revenue from each airplane produced is shown in the second row. The marginal net revenue is the purchase price minus the marginal production cost. The third row gives the percentage of the available production capacity that would be used for each plane produced. The maximum total capacity in the whole company is 100%. The last row indicates the maximum number of airplanes requested by each customer (but less will be accepted).

Fly-High now wants to determine how many airplanes to produce for each customer (if any) to maximize the company's total profit (i.e total profit = total net revenue minus start-up costs). Formulate the mixed integer programming model and solve it using Excel solver for this problem.

Question 2

Considering the network below, node 1 is origin and node 7 is destination node. Determine the minimum distance and shortest-route path from node 2 to node 7.

Question 3

Super Construction Company Limited is considering five projects including theme park, outlet shopping mall, distribution centre, museum and office building. The financial success of these project depends on the interest rate movement in the next 10 years. It is foreseeable that the future interest rate may increase, remain stable or decline. The table below shows their 10-year financial return (in million) under each state of nature.

(a) Determine the best investment using Maximin strategy.

(b) Construct an opportunity loss table and determine the best investment using Minimax Regret strategy.

(c) Suppose the probabilities of increase, remain stable and decline of interest rate are 34%, 29% and 37% respectively, suggest which project would you choose by using expected value (EV) as the decision criterion? Show your calculation steps.

(d) Following (c), the manager stated that “It is worth to pay $1.5millions for the perfect information as the company can earn more by making this decision”. Comment on the statement and justify if you agree with the decision of the manager.

Question 4

The Makonsel Company is a fully integrated company that both produces goods and sells them at its retail outlets. After production, the good are stored in the company’s two warehouses until needed by the retail outlets. Trucks are used to transport the goods from the two plants to the warehouses, and then from the warehouses to the three retail outlets.

Using units of full truckloads, Table 1 shows each plant’s monthly output, its shipping cost per truckload sent to each warehouse, and the maximum amount that it can ship per month to each warehouse.

For each retail outlet (RO), Table 2 below shows its monthly demand, its shipping cost per truckload from each warehouse, and the maximum amount that it can be shipped per month from each warehouse.

Management now wants to determine a distribution plan (number of truckloads shipped per month from each plant to each warehouse and from each warehouse to each retail out let that will minimize the total shipping cost.

Table 1

(a) Draw a network that depicts the company’s distribution network. Identify the supply nodes in this network.

(b) Formulate a linear programming model for this problem.

(c) Solve the problem using solver.




热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030