BPLN0025: Business Cases for Infrastructure 2020-21

Total time allowed: 24 hours (suggested time allowance: 2 hours)

Deadline: 09:00am (UK time) Thursday 29th April

•    Answer THREE questions from PART A and ALL of PART B.

•    Part A attracts 60% of the overall marks, while Part B attracts 40% of the overall mark.

•    Use illustrations and include diagrams in your answers where they assist in providing explanation.

•    Start each answer on a new page.

•    Total word count: 2,500

•    Submit answers as a single file via Turnitin taking extra care to ensure you are uploading the correct file. Only one submission will be accepted, so your first submission will  be final.

•    Answers submitted after the deadline will be subject to lateness penalties.

PART A: (60% of marks)

Answer THREE questions ONLY from Part A.

Question 1

Discuss the motivation behind the adoption of the ‘5-case model’ as specified in the HMT Green Book. (10% of marks)

Outline some of the limitations of the Strategic case for the appraisal of infrastructure fit for the challenges of sustainable development. How do the recent revisions to the 2020 edition of the  Green Book seek to address these? (10% of marks)

Question 2

Define what is meant by the discount rate and outline the component parts of the discount rate used by HM Treasury in the 2020 edition of the Green Book (7% of marks)

Discuss the limitations of economic cost benefit analysis for the consideration of social equity (for example spatial and temporal equity) and make some suggestions for how the treatment of this could be improved within the 5-case model? (13% of marks)

Question 3

Discuss the key differences between the financial and economic dimensions of the 5-case model. Include in your answer consideration of focus, coverage, relevant standards, and analysis (typical inclusions and exclusions). (13% of marks)

Give examples of HM Treasury good practice for the specification of alternative project options. (7% of marks)

Question 4

Roger Allport has identified a number of key areas where the private sector can contribute to infrastructure development. Discuss and critique the role the private sector can play in improving infrastructure project success.  (14% of marks)

Illustrate a process used to determine how risks are shared and managed between the public and private sectors during a typical infrastructure PPP project. (6% of marks)

Question 5

What is the difference between Natural Capital assessment and Natural Capital accounting? (10% of marks)

What are the fundamental problems with CBA when treating environmental impacts, and how does Natural Capital seek to address this? (10% of marks)

Question 6

Briefly discuss the contingent valuation method for estimating economic prices for use in Cost Benefit  Analysis. Outline the typical applications, strengths and weaknesses of the methodology (20% of marks)

PART B: (40 per cent of marks)

Answer ALL of Part B

You have been commissioned by the UK Department for Culture, Media and Sport (DCMS) to undertake elements of the Strategic Outline Case (using the HMT 5-case model methodology) for a new superfast broadband network  in the UK  referred to as the “Express  Broadband Programme UK” or EBPUK

Figure 1: Current superfast availability in the UK.

 

The underlying intent of the EBPUK Programme is to progress towards achieving 100% broadband coverage for the UK utilising  wire/fibre, wireless and satellite communications networks by 2023, with the deployment of superfast broadband where affordable. This will lead to the ongoing incremental further evolution of improvements to superfast broadband capability beyond this date.

In particular, implementation of the programme aims to achieve investment to provide a consistent network  broadband experience across the whole of the  UK comparable to that experienced in urban areas. Intervention by government is required to cover the investment gap in order to achieve such equality across the UK; the justification is that this strategic intervention is the only way such improvements can be achieved.

EBPUK currently has five primary goals:

•    To support economic growth in the UK, including in rural areas which are currently poorly served and designated Enterprise Zones (Figure 1).

•    To ensure this country has the best Superfast Broadband in Europe by the end of 2023.

•    To ensure delivery of Standard Broadband to virtually all communities in the UK within the lifetime of this parliament (2023)

•    To ensure the efficient use of funding to deliver Superfast Broadband and Standard Broadband including the leveraging of private funding

•    To assist other Government initiatives which are dependent upon customers ability to access Broadband based services.

EBPUK’s vision for broadband is driven by two key IT policy goals:

•    The target set by the Secretary of State for Culture, Media and Sport: to have the best Superfast Broadband network in Europe by 2023; and

•    The European Union aspiration to have 30Mbps available to all and for 50% access to 100Mbps by 2028.

Three potential project delivery options have been identified in response to the above spending objectives as follows:

Option 1: Centrally led delivery via a single EBPUK Megaproject:

EBPUK contracts for and directs the provision of services centrally through subsidised national contract(s) directly with suppliers to deliver improved infrastructure.

Option 2: Locally led delivery via multiple local schemes:

Locally delivered subsidised local contracts with suppliers to deliver improved infrastructure,

where services are provided at a local authority level (boroughs and councils). EBPUK funding is provided as a contribution to projects when a local body produces a satisfactory Local

Broadband Plan and undertakes a competition to select a supplier.

Option 3: Customer led delivery:

Subsidised individual householder and small business contracts with suppliers to deliver increased demand for services to stimulate improved infrastructure, where consumers make the delivery decision and the market provides the subscriptions, products and services.

Broader policy contexts and challenges:

Government departments have 100 major IT projects underway with a total value of £35 billion. However, over the recent past IT difficulties have affected many of these projects, not least in the management of large IT companies, leading to the Government seeking new delivery models as an alternative to major projects.

Government is pursuing a policy of ‘Localism’ and ‘Big Society’ which seeks to put citizens at the heart of public services. The future of local government is being shaped by two forces: a  drive towards localism; the need to cut spending and achieve efficiencies.

Local authorities vary considerably in their experience of rolling out broadband schemes and funds available to support such projects.

There is a lack of diversity in broadband providers operating in the UK market, and customers tend to be poorly consulted during IT initiatives and poorly informed regarding key broadband  performance metrics.

Many people in the UK do not enjoy the full benefits of the internet, either because the speeds they can receive do not support more data-rich services such as video-streaming, or indeed they cannot get fixed- line or mobile broadband service at all. The business case for broadband is often weaker in rural areas, and in some cases non-existent as the cost of deployment rises considerably.

Question 7

Evaluate the current project spending objectives for the  EBPUK against the HMT SMART objectives framework. (8% of marks)

Undertake a swot analysis for each of the three delivery options (Options 1, 2 and 3) to identify associated benefits, risks, constraints and dependencies for each option. Use dimensions of the 5 case model to help focus your analysis. (12% of marks)

Question 8

The time scale for the construction of the programme is 1 year (2022), the subsequent operational life (2023 onwards) of the project is set as 4 years,

Use the data outlined in table 1, 2 and 3 below to determine the economic return from Option 1 using the following indicators:

•    Net Present Value

•    Benefit/Cost Ratio

State your recommendation for funding this project option based on its economic return. (12% of marks)

Question 9

Considering your responses to questions 7 and 8 above, advise the DCMS of the possible limitations to using CBA to determine the viability of Option 1.  (8% of marks)

Table 1: Data required for calculation of Economic Benefits of the EBPUK

Description

Data

Productivity gains

£1.3bn pa

 

 

Labour market impacts

£70m pa

 

 

Wellbeing benefits

£1.7bn pa

 

 

Discount rate

5%

 

 

Table 2: Number of residential and commercial addresses upgraded by EBPUK and Economic costs of the EBPUK per address

Description

Data

Number of residential addresses upgraded

4,510,000

 

 

Number of commercial addresses upgraded

700,000

 

 

Cost per residential address upgraded

£211

 

 

Cost per commercial addresses upgraded

£350

 

 

EBPUK operating costs per year

£400m

 Table 3: Discount factors

 


热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图