代写FINS5516 - International Corporate Finance Term 1, 2024代做Python程序

FINS5516 - International Corporate Finance

Term 1, 2024

Group Case Study

Written report DUE: Monday 15 April 2024, 0:00 (Sydney, Australia time)

(Sunday 14 April 2024, 12pm)

Weighting

This assessment is worth 30% of your final grade for FINS5516. This assignment is group work. Each group consists of 5-7 students. All members inside a group enjoy the same grade.

Assignment Learning Objectives

Students are assigned to a case study related to practical issues faced by financial managers of multinational companies. Students are required to analyze the issues described in the case study and submit a written report as a group. At the end of the term, each group will have a professional presentation of their work to classmates.

For the particular case of “ F.Mayer Imports: Hedging Foreign Currency Risk” , the case places students in the chief financial officer’s situation in order to:

-    Appreciate volatility in foreign currencies and how it may impact a company’s profit margin and competitive advantage in the marketplace;

-    Understand and evaluate various foreign currency risk-hedging strategies by using payoff diagrams; and,

-     Understand that there are costs to every hedging strategy – risks versus rewards. Even when a hedging strategy is named “zero cost,” there is a hidden cost in the structure.

Written report:

Each group should submit a written report. Maximum 10 pages (cover page, reference, figures and appendix excluded). The written report must be submitted by one of the group members to Moodle only. Please pay attention to the format and typos. Penalization will be applied.

Group presentation:

Each group will deliver a presentation in their section in Week 10. Each student will need to be present in person and speak at least 1 minute. Each presentation lasts for 15-20min including Q&A. During the presentation section there will be an inter-group vote. Students will vote the best presentation except their own group.

In the report as well as in the presentation, please make it complete: begin with a background introduction and give a concluding remark at the end.

The overall grading will be based on the group voting and instructor judgement.

FINS5516 - Case questions

Students are required to read the case “ F.Mayer Imports: Hedging Foreign Currency Risk” and answer the following four questions:

Question 1: Hedging

•    A) For somehow, you know that the AUD/EUR would go up to and stay at 0.800 for a year. Should you hedge at 0.6900? If yes, how much would you pay for the hedge?    (Assume that you cannot adjust the product price in Australia).

•    B) For somehow, you know that the AUD/EUR would go down to and stay at 0.600 for a year. Should you hedge at 0.6900? If yes, how much would you pay for this hedge?  (Assume that you cannot adjust the product price in Australia)

Question 2: Macroeconomics

•    A) If the ECB started more monetary stimulus, what would happen to AUD/EUR? Would the value of hedging increase or decrease? Explain.

•    B) Suppose that one-year interest rates in Europe and Australia are 3.6% and 6%,

respectively. Given the spot rate of 0.6980 and the four-month forward rate of 0.6910, do you find any arbitrage strategy?

Question 3: Hedging strategies

We have learned various hedging instruments, namely, forward and options. You are asked to draw the payoff diagram (profit on the y-axis and currency rate on the x-axis) to illustrate  the payoff of each strategy: (note that the budget rate is 0.6900 which gives us zero profit)

•    A) No hedge;

•     B) Using the four-month FEC in Exhibit 3;

•    C) Purchasing an AUD put/EUR call option

Can you come up with alternative more complicate strategies? (optional)

Question 4: Hedging Payoffs

•    A) Calculate the gain/loss of

•    (1) using the four-month FEC in Exhibit 3 and

•    (2) purchasing an AUD put/EUR call option: (ignore the transaction costs and margins)

•    When the rate reaches 0.800;

•    When the rate reaches 0.600;

•    B) What is the break-even spot price on the option contract? On the futures contract?





热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图